Bridge Statistics for Ravine, Pennsylvania (PA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 21Number of bridges
  • 105ft / 31.6mTotal length
  • $3,186,000Total costs
  • 130,013Total average daily traffic
  • 32,754Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Ravine
  • No street view available for this location

New bridges in Ravine, PA - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 21930-1939
  • 11940-1949
  • 101960-1969
  • 11970-1979
  • 11980-1989
  • 42000-2009
  • 12010-2019
Reconstructed bridges in Ravine, PA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11950-1959
  • 01960-1969
  • 01970-1979
  • 01980-1989
  • 01990-1999
  • 22000-2009
  • 12010-2019
Average Bridge Daily Traffic in Ravine, PA
Average Bridge Truck Traffic in Ravine, PA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 7.7%Very good
  • 15.4%Good
  • 38.5%Satisfactory
  • 30.8%Fair
  • 7.7%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 7.7%Very good
  • 23.1%Good
  • 7.7%Satisfactory
  • 46.2%Fair
  • 15.4%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 30.8%Good
  • 23.1%Satisfactory
  • 30.8%Fair
  • 15.4%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 7.7%Good
  • 15.4%Satisfactory
  • 23.1%Fair
  • 53.8%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 25.0%Very good
  • 50.0%Satisfactory
  • 25.0%Fair
Find on map >>   Show street view

Structure Number: 3056,  Location: RAVINE (Lat: 40.592775,  Lng: -76.412100),  Route carried "on" structure: Interstate 81,  Year Built: 1969,  Year Reconstructed: 2000,  Status: Open,  Structure Length: 3.41m (11.19ft),  Average Daily Traffic: 13,367 (year 2021),  Truck Traffic: 30%,  Average Future Daily Traffic: 21,335 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: SR 3013 (LR 53029)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.660,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.2m (49.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 15.4m (50.5ft),  Out-to-Out Width: 16.8m (55.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.00m (13.12ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $77,000,  Roadway Improvement Cost: $226,000,  Total Project Cost: $1,036,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 30561,  Location: RAVINE (Lat: 40.592614,  Lng: -76.412764),  Route carried "on" structure: Interstate 81,  Year Built: 1969,  Year Reconstructed: 2000,  Status: Open,  Structure Length: 3.63m (11.91ft),  Average Daily Traffic: 13,829 (year 2021),  Truck Traffic: 30%,  Average Future Daily Traffic: 17,705 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: SR 3013 (LR 53029)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.526,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 11 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 16.5m (54.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 15.4m (50.5ft),  Out-to-Out Width: 16.6m (54.5ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.50m (14.76ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $18,000,  Roadway Improvement Cost: $52,000,  Total Project Cost: $241,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 30562,  Location: 0.25 MI.N.OF EXIT 104(32) (Lat: 40.596219,  Lng: -76.412231),  Route carried "on" structure: Interstate 81,  Year Built: 1969,  Status: Open,  Structure Length: 0.61m (2.00ft),  Average Daily Traffic: 13,367 (year 2021),  Truck Traffic: 30%,  Average Future Daily Traffic: 21,335 (year 2032),  Design Load: HS 20,  Features Intersected: RAUSCH CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.464,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft)

Condition: Channel: Poor,  Culverts: Satisfactory,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 89.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.20m (3.94ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020
Find on map >>   Show street view

Structure Number: 30563,  Location: 0.50 MI.N.OF EXIT 104(32) (Lat: 40.600547,  Lng: -76.417078),  Route carried "on" structure: Interstate 81,  Year Built: 1969,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 13,367 (year 2021),  Truck Traffic: 30%,  Average Future Daily Traffic: 21,335 (year 2032),  Design Load: HS 20,  Features Intersected: RAUSCH CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.245,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.5m (41.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020
Find on map >>   Show street view

Structure Number: 30564,  Location: 1.1 M.N.OF EXIT 104(32) (Lat: 40.605644,  Lng: -76.422975),  Route carried "on" structure: Interstate 81,  Year Built: 1969,  Status: Open,  Structure Length: 0.61m (2.00ft),  Average Daily Traffic: 13,367 (year 2021),  Truck Traffic: 30%,  Average Future Daily Traffic: 21,335 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: RAUSCH CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.050,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 78.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Structural Evaluation: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.20m (3.94ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Bridge Improvement Cost: $11,000,  Roadway Improvement Cost: $32,000,  Total Project Cost: $146,000
Find on map >>   Show street view

Structure Number: 30613,  Location: RAVINE (Lat: 40.582642,  Lng: -76.406381),  Route carried "on" structure: State highway 125,  Year Built: 1988,  Status: Open,  Structure Length: 2.56m (8.40ft),  Average Daily Traffic: 6,506 (year 2022),  Truck Traffic: 9%,  Average Future Daily Traffic: 6,839 (year 2032),  Design Load: HS 25 or greater,  Features Intersected: SWATARA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.909,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.0m (82.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 96.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.30m (10.83ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 30614,  Location: 3 MI. S. OF TREMONT (Lat: 40.597192,  Lng: -76.393158),  Route carried "on" structure: State highway 125,  Year Built: 1930,  Status: Posted for load-capacity,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 3,473 (year 2022),  Truck Traffic: 6%,  Average Future Daily Traffic: 3,961 (year 2032),  Design Load: HS 20,  Features Intersected: BLACK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.204,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Poor,  Channel: Poor,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.70m (5.58ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: August 2021,  Other Special Inspection Date: August 2021,  Bridge Improvement Cost: $5,000,  Roadway Improvement Cost: $16,000,  Total Project Cost: $72,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 30685,  Location: 1 MI.EAST OF PINE GROVE (Lat: 40.564953,  Lng: -76.368181),  Route carried "on" structure: State highway 443,  Year Built: 1920,  Year Reconstructed: 1956,  Status: Open,  Structure Length: 3.14m (10.30ft),  Average Daily Traffic: 4,429 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 6,030 (year 2032),  Design Load: HS 20,  Features Intersected: SO. BR. SWATARA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.254,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 29.9m (98.1ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Poor,  Operating Rating: 46.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.80m (12.47ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $92,000,  Roadway Improvement Cost: $271,000,  Total Project Cost: $1,243,000,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 30798,  Location: NORTH OF PINE GROVE BORO (Lat: 40.561561,  Lng: -76.395433),  Route carried "on" structure: State highway ,  Year Built: 1933,  Status: Open,  Structure Length: 2.83m (9.28ft),  Average Daily Traffic: 1,770 (year 2022),  Truck Traffic: 4%,  Average Future Daily Traffic: 2,285 (year 2032),  Design Load: HS 20,  Features Intersected: SWATARA CREEK,  Facility Carried by Structure: SWEET ARROW LAKE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 6.9m (22.6ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Poor,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.60m (11.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2019,  Bridge Improvement Cost: $18,000,  Roadway Improvement Cost: $53,000,  Total Project Cost: $243,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 30801,  Location: 1 M. E. OF PINE GROVE (Lat: 40.578078,  Lng: -76.345161),  Route carried "on" structure: State highway ,  Year Built: 1940,  Status: Posted for load,  Structure Length: 1.80m (5.91ft),  Average Daily Traffic: 988 (year 2022),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,280 (year 2032),  Design Load: HS 20,  Features Intersected: UPPER LITTLE SWATARA CR,  Facility Carried by Structure: SR 3002
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.580,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.4m (57.1ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 39.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.50m (8.20ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: August 2021,  Other Special Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 30809,  Location: VILLAGE OF RAVINE (Lat: 40.590139,  Lng: -76.407486),  Route carried "on" structure: State highway ,  Year Built: 1969,  Status: Open,  Structure Length: 2.35m (7.71ft),  Average Daily Traffic: 6,338 (year 2022),  Truck Traffic: 12%,  Average Future Daily Traffic: 8,274 (year 2032),  Design Load: HS 20,  Features Intersected: SWATARA CREEK,  Facility Carried by Structure: SR 3013
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.2m (76.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Poor,  Operating Rating: 75.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.10m (10.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 30923,  Location: EAST OF SR 125 AT RAVINE (Lat: 40.574800,  Lng: -76.402600),  Route carried "on" structure: City street ,  Year Built: 1970,  Year Reconstructed: 2015,  Status: Open,  Structure Length: 2.16m (7.09ft),  Average Daily Traffic: 200 (year 2015),  Truck Traffic: 2%,  Average Future Daily Traffic: 600 (year 2035),  Design Load: HL 93,  Features Intersected: SWATARA CREEK,  Facility Carried by Structure: T-410 SPITTLER RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.0m (68.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Fair,  Operating Rating: 56.1 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 40.5 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.80m (9.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $7,000,  Roadway Improvement Cost: $22,000,  Total Project Cost: $99,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 30954,  Location: 0.1 MI NORTH OF SR 3002 (Lat: 40.584344,  Lng: -76.334381),  Route carried "on" structure: City street ,  Year Built: 1961,  Status: Posted for load,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 50 (year 1981),  Average Future Daily Traffic: 70 (year 2001),  Design Load: HS 20,  Features Intersected: UPPER SWATARA CR,  Facility Carried by Structure: KUTZ ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 9.0m (29.5ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Poor,  Operating Rating: 36.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 1.60m (5.25ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: August 2020,  Other Special Inspection Date: August 2021,  Bridge Improvement Cost: $6,000,  Roadway Improvement Cost: $18,000,  Total Project Cost: $82,000,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 30955,  Location: 0.20 MI NORTH OF SR 3002 (Lat: 40.588078,  Lng: -76.324078),  Route carried "on" structure: City street ,  Year Built: 1962,  Status: Posted for load,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 50 (year 1981),  Average Future Daily Traffic: 70 (year 2001),  Design Load: HS 20,  Features Intersected: UPPER SWATARA CR,  Facility Carried by Structure: T-536 Roedersville
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft),  Curb-To-Curb Width: 5.4m (17.7ft),  Out-to-Out Width: 5.5m (18.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Poor,  Channel: Poor,  Operating Rating: 28.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 16.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.80m (5.91ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: August 2020,  Other Special Inspection Date: August 2021,  Bridge Improvement Cost: $2,000,  Roadway Improvement Cost: $5,000,  Total Project Cost: $24,000,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 42282,  Location: 1 MI N OF EXIST 100 (31) (Lat: 40.550792,  Lng: -76.430556),  Route carried "on" structure: Interstate 81,  Year Built: 2004,  Status: Open,  Structure Length: 1.98m (6.50ft),  Average Daily Traffic: 12,745 (year 2021),  Truck Traffic: 37%,  Average Future Daily Traffic: 21,335 (year 2032),  Design Load: HS 25 or greater,  Features Intersected: OAK GROVE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.008,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.2m (63.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: July 2018,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 42284,  Location: 1 MI. N. OF EXIT 100 (31) (Lat: 40.550608,  Lng: -76.430939),  Route carried "on" structure: Interstate 81,  Year Built: 2004,  Status: Open,  Structure Length: 1.98m (6.50ft),  Average Daily Traffic: 12,421 (year 2021),  Truck Traffic: 35%,  Average Future Daily Traffic: 17,705 (year 2032),  Design Load: HS 25 or greater,  Features Intersected: OAK GROVE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.919,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.2m (63.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: July 2018,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 5693,  Location: 0.1 MI E OF PA125 (Lat: 40.597861,  Lng: -76.391028),  Route carried "on" structure: City street ,  Year Built: 2019,  Status: Open,  Structure Length: 0.61m (2.00ft),  Average Daily Traffic: 150 (year 2020),  Average Future Daily Traffic: 250 (year 2040),  Features Intersected: Black Creek,  Facility Carried by Structure: Camp Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 7 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 81.6 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020
Find on map >>   Show street view

Structure Number: 3056,  Location: RAVINE (Lat: 40.592775,  Lng: -76.412100),  Route carried "under" structure: State highway ,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 6,338 (year 2022),  Truck Traffic: 12%,  Features Intersected: SR 3013 (LR 53029),  Facility Carried by Structure: I-81 NB (LR 1005)
Minimum Vertical Clearance: 4.63m (15.19ft),  Kilometerpoint: 0.546,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 15.2m (49.9ft)

Find on map >>   Show street view

Structure Number: 30561,  Location: RAVINE (Lat: 40.592614,  Lng: -76.412764),  Route carried "under" structure: State highway ,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 6,338 (year 2022),  Truck Traffic: 12%,  Features Intersected: SR 3013 (LR 53029),  Facility Carried by Structure: I-81 SB (LR 1005)
Minimum Vertical Clearance: 4.79m (15.72ft),  Kilometerpoint: 0.546,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 16.5m (54.1ft)

Find on map >>   Show street view

Structure Number: 42282,  Location: 1 MI N OF EXIST 100 (31) (Lat: 40.550792,  Lng: -76.430556),  Route carried "under" structure: City street ,  Year Built: 2004,  Structure Length: 0. m,  Average Daily Traffic: 460 (year 1992),  Truck Traffic: 1%,  Features Intersected: OAK GROVE ROAD,  Facility Carried by Structure: I-81 NB (LR 1005)
Minimum Vertical Clearance: 4.54m (14.90ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 19.2m (63.0ft)

Find on map >>   Show street view

Structure Number: 42284,  Location: 1 MI. N. OF EXIT 100 (31) (Lat: 40.550608,  Lng: -76.430939),  Route carried "under" structure: City street ,  Year Built: 2004,  Structure Length: 0. m,  Average Daily Traffic: 460 (year 1992),  Truck Traffic: 1%,  Features Intersected: OAK GROVE ROAD,  Facility Carried by Structure: I-81 SB (LR 1005)
Minimum Vertical Clearance: 4.51m (14.80ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 19.2m (63.0ft)