Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Red Rock, Arizona (AZ)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 22Number of bridges
  • 108ft / 32.7mTotal length
  • $30,000Total costs
  • 477,944Total average daily traffic
  • 84,238Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Red Rock
  • No street view available for this location

New bridges in Red Rock, AZ - historical statistics
  • New bridges - historical statistics
  • 151950-1959
  • 41980-1989
  • 11990-1999
  • 22000-2009
Reconstructed bridges in Red Rock, AZ - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11970-1979
  • 01980-1989
  • 01990-1999
  • 132000-2009
Average Bridge Daily Traffic in Red Rock, AZ
Average Bridge Truck Traffic in Red Rock, AZ
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 4.8%Very good
  • 81.0%Good
  • 4.8%Satisfactory
  • 4.8%Fair
  • 4.8%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 5.3%Very good
  • 89.5%Good
  • 5.3%Satisfactory
Find on map >>   Show street view

Structure Number: N262,  Location: 0.6MI W.OF BIA63 ON BIA33 (Lat: 36.607528,  Lng: -109.064611),  Route carried "on" structure: Federal lands road N33,  Year Built: 1997,  Status: Open,  Structure Length: 7.84m (25.72ft),  Average Daily Traffic: 1,000 (year 2022),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,190 (year 2040),  Design Load: HS 20,  Features Intersected: RED WASH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.952,  Lanes on structure: 2,  Owner: Bureau of Indian Affairs,  Approaching Roadway Width: 9.0m (29.5ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 19.4m (63.6ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 49.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 37.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 5486,  Location: 11.2 mi S Jct SR 84 (Lat: 32.623772,  Lng: -111.365325),  Route carried "on" structure: Interstate 10,  Year Built: 1954,  Year Reconstructed: 2008,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 21,637 (year 2018),  Truck Traffic: 16%,  Average Future Daily Traffic: 21,647 (year 2038),  Design Load: HS 20,  Features Intersected: Wash
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 357.596,  Lanes on structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 36.6m (120.1ft),  Skew: 20 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.74m (5.71ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: March 2021,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 5488,  Location: 11.4 mi S Jct SR 84 (Lat: 32.620678,  Lng: -111.362742),  Route carried "on" structure: Interstate 10,  Year Built: 1954,  Year Reconstructed: 2008,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 21,637 (year 2018),  Truck Traffic: 16%,  Average Future Daily Traffic: 21,647 (year 2038),  Design Load: HS 20,  Features Intersected: Wash
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 357.918,  Lanes on structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 36.6m (120.1ft),  Skew: 20 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.74m (5.71ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: March 2021,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 549,  Location: 12.0 mi S Jct SR 84 (Lat: 32.614872,  Lng: -111.357847),  Route carried "on" structure: Interstate 10,  Year Built: 1954,  Year Reconstructed: 2008,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 21,637 (year 2018),  Truck Traffic: 16%,  Average Future Daily Traffic: 21,647 (year 2038),  Design Load: HS 20,  Features Intersected: Wash
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 358.803,  Lanes on structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 36.6m (120.1ft),  Skew: 20 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.07m (6.79ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: March 2021,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 5492,  Location: 12.3 mi S Jct SR 84 (Lat: 32.610364,  Lng: -111.354075),  Route carried "on" structure: Interstate 10,  Year Built: 1954,  Year Reconstructed: 2008,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 21,637 (year 2018),  Truck Traffic: 16%,  Average Future Daily Traffic: 21,647 (year 2038),  Design Load: HS 20,  Features Intersected: Wash
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 359.286,  Lanes on structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 36.6m (120.1ft),  Skew: 20 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.74m (5.71ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: March 2021,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 5494,  Location: 12.5 mi S Jct SR 84 (Lat: 32.607542,  Lng: -111.351725),  Route carried "on" structure: Interstate 10,  Year Built: 1954,  Year Reconstructed: 2008,  Status: Open,  Structure Length: 1.65m (5.41ft),  Average Daily Traffic: 22,466 (year 2018),  Truck Traffic: 16%,  Average Future Daily Traffic: 22,476 (year 2038),  Design Load: HS 20,  Features Intersected: Wash
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 359.608,  Lanes on structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 36.6m (120.1ft),  Skew: 20 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.41m (7.91ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 5496,  Location: 12.9 mi S Jct SR 84 (Lat: 32.603278,  Lng: -111.348142),  Route carried "on" structure: Interstate 10,  Year Built: 1954,  Year Reconstructed: 2008,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 22,466 (year 2018),  Truck Traffic: 16%,  Average Future Daily Traffic: 22,476 (year 2038),  Design Load: HS 20,  Features Intersected: Wash
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 360.332,  Lanes on structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 36.6m (120.1ft),  Skew: 20 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.07m (6.79ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: March 2021,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 5498,  Location: 13.5 mi S Jct SR 84 (Lat: 32.596269,  Lng: -111.342261),  Route carried "on" structure: Interstate 10,  Year Built: 1954,  Year Reconstructed: 2008,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 22,466 (year 2018),  Truck Traffic: 16%,  Average Future Daily Traffic: 22,476 (year 2038),  Design Load: HS 20,  Features Intersected: Wash
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 361.298,  Lanes on structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 36.6m (120.1ft),  Skew: 20 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.74m (5.71ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: March 2021,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 55,  Location: 13.9 mi S Jct SR 84 (Lat: 32.591297,  Lng: -111.338094),  Route carried "on" structure: Interstate 10,  Year Built: 1954,  Year Reconstructed: 2008,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 22,466 (year 2018),  Truck Traffic: 16%,  Average Future Daily Traffic: 22,476 (year 2038),  Design Load: HS 20,  Features Intersected: Wash
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 361.941,  Lanes on structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 36.6m (120.1ft),  Skew: 20 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.07m (6.79ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: March 2021,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 5504,  Location: 14.9 mi S Jct SR 84 (Lat: 32.580636,  Lng: -111.329311),  Route carried "on" structure: Interstate 10,  Year Built: 1954,  Year Reconstructed: 1979,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 22,466 (year 2018),  Truck Traffic: 16%,  Average Future Daily Traffic: 22,476 (year 2038),  Design Load: HS 20,  Features Intersected: Wash
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 363.470,  Lanes on structure: 10,  Owner: State Highway Agency,  Approaching Roadway Width: 51.2m (168.0ft),  Skew: 22 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 60.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.46m (4.79ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: March 2021,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 5506,  Location: 15.8 mi South Jct SR 84 (Lat: 32.569900,  Lng: -111.320100),  Route carried "on" structure: Interstate 10,  Year Built: 1954,  Year Reconstructed: 2008,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 45,445 (year 2017),  Truck Traffic: 19%,  Average Future Daily Traffic: 45,455 (year 2038),  Design Load: HS 20,  Features Intersected: Wash
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 365.144,  Lanes on structure: 7,  Owner: State Highway Agency,  Approaching Roadway Width: 36.6m (120.1ft),  Skew: 30 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 76.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.74m (5.71ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: September 2018,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000
Find on map >>   Show street view

Structure Number: 5508,  Location: 16.1 mi South Jct SR 84 (Lat: 32.565600,  Lng: -111.316500),  Route carried "on" structure: Interstate 10,  Year Built: 1954,  Year Reconstructed: 2008,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 45,445 (year 2017),  Truck Traffic: 19%,  Average Future Daily Traffic: 45,455 (year 2038),  Design Load: HS 20,  Features Intersected: Wash
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 365.627,  Lanes on structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 36.6m (120.1ft),  Skew: 30 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 75.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.74m (5.71ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: September 2018,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000
Find on map >>   Show street view

Structure Number: 5512,  Location: 17.5 mi South Jct SR 84 (Lat: 32.549000,  Lng: -111.302600),  Route carried "on" structure: Interstate 10,  Year Built: 1954,  Year Reconstructed: 2008,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 45,445 (year 2017),  Truck Traffic: 19%,  Average Future Daily Traffic: 45,455 (year 2038),  Design Load: HS 20,  Features Intersected: Wash
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 367.799,  Lanes on structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 36.6m (120.1ft),  Skew: 39 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft),  Out-to-Out Width: 69.8m (229.0ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.31m (4.30ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: September 2018,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2014)
Find on map >>   Show street view

Structure Number: 5514,  Location: 18.0 mi South Jct 84 (Lat: 32.542500,  Lng: -111.297200),  Route carried "on" structure: Interstate 10,  Year Built: 1954,  Year Reconstructed: 2008,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 45,445 (year 2017),  Truck Traffic: 19%,  Average Future Daily Traffic: 45,455 (year 2038),  Design Load: HS 20,  Features Intersected: Wash
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 368.701,  Lanes on structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 36.6m (120.1ft),  Skew: 30 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Poor,  Culverts: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 78.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.37m (4.49ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: September 2018,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000
Find on map >>   Show street view

Structure Number: 5516,  Location: 18.5 mi South Jct SR 84 (Lat: 32.537300,  Lng: -111.292800),  Route carried "on" structure: Interstate 10,  Year Built: 1954,  Year Reconstructed: 2008,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 45,445 (year 2017),  Truck Traffic: 19%,  Average Future Daily Traffic: 45,455 (year 2038),  Design Load: HS 20,  Features Intersected: Wash
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 369.489,  Lanes on structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 36.6m (120.1ft),  Skew: 30 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 76.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.37m (4.49ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: September 2018,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000
Find on map >>   Show street view

Structure Number: 8971,  Location: 0.2 mi NE Jct I-10 (Lat: 32.595900,  Lng: -111.333100),  Route carried "on" structure: County highway ,  Year Built: 1987,  Status: Open,  Structure Length: 1.55m (5.09ft),  Average Daily Traffic: 847 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 857 (year 2039),  Design Load: HS 20,  Features Intersected: CAP Canal,  Facility Carried by Structure: Park Link Dr
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 2 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.6m (15.1ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 89.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: Febuary 2020,  Underwater Inspection Date: November 2020
Find on map >>   Show street view

Structure Number: 10239,  Location: 0.5 mi S/ Broadway Rd (Lat: 33.398889,  Lng: -112.305950),  Route carried "on" structure: County highway ,  Year Built: 2000,  Status: Open,  Structure Length: 0.96m (3.15ft),  Average Daily Traffic: 100 (year 2020),  Average Future Daily Traffic: 110 (year 2040),  Design Load: HS 20,  Features Intersected: Buckeye Feeder Ditch,  Facility Carried by Structure: Roeser Rd
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 12.4m (40.7ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 52.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 11429,  Location: 0.1 mi E Jct Red Rock Dr (Lat: 32.570989,  Lng: -111.334544),  Route carried "on" structure: County highway ,  Year Built: 2007,  Status: Open,  Structure Length: 2.59m (8.50ft),  Average Daily Traffic: 1,830 (year 2019),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,840 (year 2039),  Design Load: HS 20,  Features Intersected: Wash,  Facility Carried by Structure: Sasco Rd
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Owner: County Highway Agency,  Approaching Roadway Width: 22.6m (74.1ft),  Skew: 22 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 3.7m (12.1ft),  Curb or Sidewalk Widths: Left: 2.6m (8.5ft),  Right: 2.6m (8.5ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 51.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.38m (11.09ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: November 2019,  Bridge Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2020)
Find on map >>   Show street view

Structure Number: 1156,  Location: @ CAP MILEPOST 271.95 (Lat: 32.632500,  Lng: -111.337000),  Route carried "on" structure: Federal lands road ,  Year Built: 1987,  Status: Open,  Structure Length: 1.65m (5.41ft),  Average Daily Traffic: 20 (year 2020),  Average Future Daily Traffic: 30 (year 2040),  Design Load: HS 20,  Features Intersected: CAP Canal,  Facility Carried by Structure: Farm Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Agenciy,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 6.1m (20.0ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: Febuary 2020,  Underwater Inspection Date: November 2020
Find on map >>   Show street view

Structure Number: 11561,  Location: @ CAP MILEPOST 272.44 (Lat: 32.625300,  Lng: -111.336900),  Route carried "on" structure: Federal lands road ,  Year Built: 1987,  Status: Open,  Structure Length: 1.65m (5.41ft),  Average Daily Traffic: 20 (year 2020),  Average Future Daily Traffic: 30 (year 2040),  Design Load: HS 20,  Features Intersected: CAP Canal,  Facility Carried by Structure: Farm Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Agenciy,  Approaching Roadway Width: 18.3m (60.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 6.1m (20.0ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: Febuary 2020,  Underwater Inspection Date: November 2020
Find on map >>   Show street view

Structure Number: 11562,  Location: @ CAP MILEPOST 273.20 (Lat: 32.614300,  Lng: -111.336900),  Route carried "on" structure: Federal lands road ,  Year Built: 1987,  Status: Open,  Structure Length: 1.65m (5.41ft),  Average Daily Traffic: 20 (year 2020),  Average Future Daily Traffic: 30 (year 2040),  Design Load: HS 20,  Features Intersected: CAP Canal,  Facility Carried by Structure: Farm Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Agenciy,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 6.1m (20.0ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: Febuary 2020,  Underwater Inspection Date: November 2020
Find on map >>   Show street view

Structure Number: 592,  Location: 15.5 mi S Jct SR 84 (Lat: 32.572800,  Lng: -111.323000),  Route carried "under" structure: Interstate 10,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 48,004 (year 2018),  Truck Traffic: 19%,  Features Intersected: I 10; EB & WB,  Facility Carried by Structure: Redrock Rd
Minimum Vertical Clearance: 5.15m (16.90ft),  Kilometerpoint: 364.436,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 24.1m (79.1ft)

Discuss Red Rock, Arizona (AZ) on our hugely popular Arizona forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.