Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Repton, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 10Number of bridges
  • 75ft / 23.0mTotal length
  • $8,104,000Total costs
  • 20,470Total average daily traffic
  • 3,038Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Repton
  • No street view available for this location

New bridges in Repton, AL - historical statistics
  • New bridges - historical statistics
  • 41940-1949
  • 21950-1959
  • 11980-1989
  • 11990-1999
  • 22000-2009
Average Bridge Daily Traffic in Repton, AL
Average Bridge Truck Traffic in Repton, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 20.0%Good
  • 20.0%Satisfactory
  • 40.0%Fair
  • 20.0%Critical
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 20.0%Very good
  • 20.0%Good
  • 40.0%Fair
  • 20.0%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 40.0%Good
  • 20.0%Satisfactory
  • 20.0%Fair
  • 20.0%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 12.5%Good
  • 62.5%Satisfactory
  • 12.5%Fair
  • 12.5%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 25.0%Good
  • 75.0%Satisfactory
Find on map >>   Show street view

Structure Number: 3026,  Location: 1 MI W SR 41 (Lat: 31.408667,  Lng: -87.254694),  Route carried "on" structure: US 84,  Year Built: 1947,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 5,210 (year 2019),  Truck Traffic: 13%,  Average Future Daily Traffic: 7,815 (year 2039),  Design Load: H 15,  Features Intersected: BRIDGE BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 133.774,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 64.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.62m (5.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $402,000,  Roadway Improvement Cost: $40,000,  Total Project Cost: $442,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 3027,  Location: 1.3 MI E SR 41 (Lat: 31.415308,  Lng: -87.216281),  Route carried "on" structure: US 84,  Year Built: 1947,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 3,043 (year 2019),  Truck Traffic: 16%,  Average Future Daily Traffic: 4,565 (year 2039),  Design Load: H 20,  Features Intersected: BUSHY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 137.514,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 43.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 26.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Underwater Inspection Date: November 2021,  Bridge Improvement Cost: $842,000,  Roadway Improvement Cost: $84,000,  Total Project Cost: $926,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 3033,  Location: 2 MI. W. OF REPTON (Lat: 31.419994,  Lng: -87.276253),  Route carried "on" structure: US 84,  Year Built: 1947,  Status: Open,  Structure Length: 5.18m (16.99ft),  Average Daily Traffic: 5,790 (year 2013),  Truck Traffic: 18%,  Average Future Daily Traffic: 7,768 (year 2033),  Design Load: H 20,  Features Intersected: ESCAMBIA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 131.355,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 7.8m (25.6ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 38.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 6.20m (20.34ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $1,191,000,  Roadway Improvement Cost: $119,000,  Total Project Cost: $1,310,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 6663,  Location: BUSHY CREEK (Lat: 31.402097,  Lng: -87.212669),  Route carried "on" structure: County highway 73,  Year Built: 1959,  Status: Open,  Structure Length: 1.32m (4.33ft),  Average Daily Traffic: 240 (year 1995),  Truck Traffic: 8%,  Average Future Daily Traffic: 441 (year 2034),  Design Load: H 15,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.3m (14.1ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 51.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.99m (6.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $368,000,  Roadway Improvement Cost: $37,000,  Total Project Cost: $405,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 6664,  Location: 3 MI. S.E. REPTON (Lat: 31.390614,  Lng: -87.200439),  Route carried "on" structure: County highway 73,  Year Built: 1959,  Status: Open,  Structure Length: 0.62m (2.03ft),  Average Daily Traffic: 280 (year 1995),  Truck Traffic: 8%,  Average Future Daily Traffic: 441 (year 2034),  Design Load: H 15,  Features Intersected: BUSHY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 70.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.24m (4.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $251,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $276,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 12265,  Location: 2 MI.EAST REPTON (Lat: 31.403831,  Lng: -87.196297),  Route carried "on" structure: County highway ,  Year Built: 1946,  Year Reconstructed: 1980,  Status: Closed,  Structure Length: 1.80m (5.91ft),  Average Daily Traffic: 85 (year 1995),  Average Future Daily Traffic: 148 (year 2034),  Features Intersected: BRANCH,  Facility Carried by Structure: ZACK LN.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 4.6m (15.1ft),  Curb-To-Curb Width: 3.4m (11.2ft),  Out-to-Out Width: 3.7m (12.1ft)

Condition: Deck: Critical,  Superstructure: Poor,  Substructure: Poor,  Channel: Poor,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.51m (8.23ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 1 months,  Inspection Date: September 2013,  Other Special Inspection Date: October 2013,  Bridge Improvement Cost: $206,000,  Roadway Improvement Cost: $21,000,  Total Project Cost: $227,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 12331,  Location: 3 MI W REPTON (Lat: 31.409433,  Lng: -87.279939),  Route carried "on" structure: County highway ,  Year Built: 1980,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 150 (year 1995),  Truck Traffic: 15%,  Average Future Daily Traffic: 236 (year 2034),  Design Load: HS 15,  Features Intersected: ESCAMBIA CREEK,  Facility Carried by Structure: OLD STAGE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 11.7m (38.4ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 54.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.81m (5.94ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $418,000,  Roadway Improvement Cost: $42,000,  Total Project Cost: $460,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 16727,  Location: RYLES LANE (Lat: 31.368075,  Lng: -87.198828),  Route carried "on" structure: County highway ,  Year Built: 1993,  Status: Posted for load,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 56 (year 1997),  Average Future Daily Traffic: 116 (year 2034),  Features Intersected: BUSHY CREEK,  Facility Carried by Structure: COUNTY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.3m (14.1ft),  Curb-To-Curb Width: 4.6m (15.1ft),  Out-to-Out Width: 5.1m (16.7ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 20.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 15.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.98m (6.50ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: September 2021,  Other Special Inspection Date: September 2021,  Bridge Improvement Cost: $218,000,  Roadway Improvement Cost: $22,000,  Total Project Cost: $240,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 1789,  Location: 0.1 MI W SR 41 (Lat: 31.410975,  Lng: -87.240550),  Route carried "on" structure: State highway 12,  Year Built: 2009,  Status: Open,  Structure Length: 7.56m (24.80ft),  Average Daily Traffic: 5,496 (year 2019),  Truck Traffic: 14%,  Average Future Daily Traffic: 8,244 (year 2039),  Design Load: HS 20,  Features Intersected: AL. RR * WJ NICHOLSON ST,  Facility Carried by Structure: US 84
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 135.156,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.7m (58.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 3,  Length of Maximum Span: 22.3m (73.2ft),  Curb-To-Curb Width: 17.2m (56.4ft),  Out-to-Out Width: 18.2m (59.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 65.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.58m (28.15ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $3,471,000,  Roadway Improvement Cost: $347,000,  Total Project Cost: $3,818,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1789,  Location: 0.1 MI W SR 41 (Lat: 31.410975,  Lng: -87.240550),  Route carried "under" structure: City street ,  Year Built: 2009,  Structure Length: 0. m,  Average Daily Traffic: 120 (year 2019),  Truck Traffic: 1%,  Features Intersected: AL. RR * WJ NICHOLSON ST,  Facility Carried by Structure: US 84
Minimum Vertical Clearance: 5.13m (16.83ft),  Kilometerpoint: 0.161,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 22.3m (73.2ft)

Discuss Repton, Alabama (AL) on our hugely popular Alabama forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.