Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Russell, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 12Number of bridges
  • 75ft / 23.3mTotal length
  • $7,439,000Total costs
  • 3,486Total average daily traffic
  • 221Total average daily truck traffic
  • 4,488Total future (year 2035) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Russell
  • No street view available for this location

New bridges in Russell, NY - historical statistics
  • New bridges - historical statistics
  • 11900-1909
  • 11910-1919
  • 11920-1929
  • 11950-1959
  • 11960-1969
  • 21970-1979
  • 21980-1989
  • 22000-2009
  • 12010-2019
Reconstructed bridges in Russell, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11970-1979
  • 01980-1989
  • 01990-1999
  • 12000-2009
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 22.2%Excellent
  • 11.1%Very good
  • 33.3%Good
  • 22.2%Satisfactory
  • 11.1%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 22.2%Excellent
  • 22.2%Very good
  • 44.4%Good
  • 11.1%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 22.2%Excellent
  • 22.2%Very good
  • 11.1%Good
  • 22.2%Satisfactory
  • 22.2%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 25.0%Very good
  • 33.3%Good
  • 16.7%Satisfactory
  • 25.0%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 33.3%Satisfactory
  • 33.3%Fair
  • 33.3%Poor
Find on map >>   Show street view

Structure Number: 222176,  Location: 2.4 MI SW OF DEGRASSE (Lat: 44.327536,  Lng: -75.088686),  Route carried "on" structure: Other road ,  Year Built: 1911,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 15 (year 2016),  Average Future Daily Traffic: 21 (year 2036),  Features Intersected: PLUMB BROOK,  Facility Carried by Structure: SPICER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.676,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.1m (6.9ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 48.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $68,000,  Roadway Improvement Cost: $40,000,  Total Project Cost: $108,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 222178,  Location: 1.2 MI NW OF S RUSSELL (Lat: 44.383650,  Lng: -75.136756),  Route carried "on" structure: Other road ,  Year Built: 1903,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 145 (year 2016),  Truck Traffic: 1%,  Average Future Daily Traffic: 203 (year 2036),  Features Intersected: PLUMB BROOK,  Facility Carried by Structure: BLANCHARD HILL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.274,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Channel: Fair,  Culverts: Poor,  Operating Rating: 48.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 14.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $131,000,  Roadway Improvement Cost: $76,000,  Total Project Cost: $207,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 225942,  Location: 1 M SE VILLAGE OF RUSSELL (Lat: 44.419517,  Lng: -75.134567),  Route carried "on" structure: Other road ,  Year Built: 2001,  Status: Open,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 81 (year 2016),  Average Future Daily Traffic: 113 (year 2036),  Design Load: HS 20,  Features Intersected: PLUMB BROOK,  Facility Carried by Structure: BURNELL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.979,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.0m (49.2ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 72.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.58m (5.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $203,000,  Roadway Improvement Cost: $119,000,  Total Project Cost: $322,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 322173,  Location: 2.3 MI W OF DEGRASSE (Lat: 44.347664,  Lng: -75.110194),  Route carried "on" structure: Other road ,  Year Built: 1985,  Year Reconstructed: 2005,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 4 (year 2015),  Average Future Daily Traffic: 6 (year 2035),  Features Intersected: PLUMB BROOK,  Facility Carried by Structure: MCCARTHY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.241,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 3.0m (9.8ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 4.5m (14.8ft),  Out-to-Out Width: 4.6m (15.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 50.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 38.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: High priority of replacement,  Length Of Structure Improvement: 0.97m (3.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $180,000,  Roadway Improvement Cost: $105,000,  Total Project Cost: $286,000 ( Estimate for 2021),  Deck Structure Type: Open Grating,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 322174,  Location: 2.2 MI SW OF DEGRASSE (Lat: 44.343378,  Lng: -75.107542),  Route carried "on" structure: Other road ,  Year Built: 1985,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 3 (year 2015),  Average Future Daily Traffic: 4 (year 2035),  Features Intersected: PLUMB BROOK,  Facility Carried by Structure: SILVER HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.496,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 3.0m (9.8ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.6m (34.8ft),  Curb-To-Curb Width: 4.5m (14.8ft),  Out-to-Out Width: 4.6m (15.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.09m (3.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $104,000,  Roadway Improvement Cost: $61,000,  Total Project Cost: $165,000 ( Estimate for 2021),  Deck Structure Type: Closed Grating,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 334177,  Location: 4 MILES SOUTH OF HERMON (Lat: 44.437878,  Lng: -75.213028),  Route carried "on" structure: County highway ,  Year Built: 1924,  Year Reconstructed: 1984,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 270 (year 2019),  Truck Traffic: 13%,  Average Future Daily Traffic: 378 (year 2039),  Features Intersected: ELM CREEK,  Facility Carried by Structure: COUNTY ROAD 21
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.930,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.1m (39.7ft),  Curb-To-Curb Width: 9.6m (31.5ft),  Out-to-Out Width: 10.3m (33.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 51.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.31m (4.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $396,000,  Roadway Improvement Cost: $232,000,  Total Project Cost: $628,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 334178,  Location: LOCATED IN DE GRASSE (Lat: 44.350306,  Lng: -75.074244),  Route carried "on" structure: County highway ,  Year Built: 1952,  Year Reconstructed: 2021,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 497 (year 2015),  Truck Traffic: 8%,  Average Future Daily Traffic: 518 (year 2040),  Design Load: HL 93,  Features Intersected: S BR GRASSE RIVER,  Facility Carried by Structure: COUNTY ROAD 27
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.465,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.8m (42.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Very good,  Channel: Good,  Operating Rating: 68.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.31m (4.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $470,000,  Roadway Improvement Cost: $275,000,  Total Project Cost: $745,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 334179,  Location: 2.4 MI SOUTH OF DEGRASSE (Lat: 44.318703,  Lng: -75.084394),  Route carried "on" structure: County highway ,  Year Built: 1975,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 600 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 625 (year 2040),  Features Intersected: PLUMB BROOK,  Facility Carried by Structure: COUNTY ROAD 27
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.442,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.3m (10.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 74.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.31m (4.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $176,000,  Roadway Improvement Cost: $103,000,  Total Project Cost: $279,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 33418,  Location: 1.2 MI N OF N RUSSELL (Lat: 44.516931,  Lng: -75.119231),  Route carried "on" structure: Other road ,  Year Built: 1963,  Status: Closed,  Structure Length: 2.59m (8.50ft),  Average Daily Traffic: 57 (year 2015),  Truck Traffic: 7%,  Average Future Daily Traffic: 80 (year 2035),  Features Intersected: LITTLE RIVER,  Facility Carried by Structure: DUTTON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.981,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.6m (80.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Poor,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.59m (8.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $501,000,  Roadway Improvement Cost: $293,000,  Total Project Cost: $794,000 ( Estimate for 2021),  Deck Structure Type: Open Grating,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 334181,  Location: 3.6 MI SW OF RUSSELL (Lat: 44.400439,  Lng: -75.201722),  Route carried "on" structure: Other road ,  Year Built: 2006,  Status: Open,  Structure Length: 1.89m (6.20ft),  Average Daily Traffic: 59 (year 2015),  Truck Traffic: 4%,  Average Future Daily Traffic: 83 (year 2035),  Design Load: HS 25 or greater,  Features Intersected: ELM CREEK,  Facility Carried by Structure: FORDHAM HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.386,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Excellent,  Channel: Very good,  Operating Rating: 97.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 58.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.88m (6.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $403,000,  Roadway Improvement Cost: $236,000,  Total Project Cost: $639,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 334182,  Location: 2.4 MI E OF HERMON (Lat: 44.466761,  Lng: -75.184017),  Route carried "on" structure: Other road ,  Year Built: 1978,  Status: Open,  Structure Length: 4.11m (13.48ft),  Average Daily Traffic: 166 (year 2015),  Truck Traffic: 3%,  Average Future Daily Traffic: 232 (year 2035),  Features Intersected: GRASSE RIVER,  Facility Carried by Structure: LAZY RIVER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.089,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.4m (44.0ft),  Curb or Sidewalk Widths: Left: 1.3m (4.3ft),  Right: 1.3m (4.3ft),  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Poor,  Channel: Good,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.11m (13.48ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: June 2021,  Underwater Inspection Date: June 2020,  Bridge Improvement Cost: $811,000,  Roadway Improvement Cost: $475,000,  Total Project Cost: $1,286,000 ( Estimate for 2021),  Deck Structure Type: Open Grating,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 336352,  Location: LOCATED IN RUSSELL (Lat: 44.427256,  Lng: -75.149456),  Route carried "on" structure: County highway ,  Year Built: 2018,  Status: Open,  Structure Length: 5.58m (18.31ft),  Average Daily Traffic: 1,589 (year 2015),  Truck Traffic: 6%,  Average Future Daily Traffic: 2,225 (year 2035),  Features Intersected: GRASSE RIVER,  Facility Carried by Structure: CR 24, JEF CO LIN
Minimum Vertical Clearance: 32.69m (107.25ft),  Kilometerpoint: 13.660,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 54.6m (179.1ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Very good,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 48.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 5.57m (18.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $1,249,000,  Roadway Improvement Cost: $731,000,  Total Project Cost: $1,980,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Discuss Russell, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.