Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Ryan, Oklahoma (OK)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 14Number of bridges
  • 121ft / 37.3mTotal length
  • $6,610,000Total costs
  • 42,255Total average daily traffic
  • 5,554Total average daily truck traffic
  • 67,320Total future (year 2040) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Ryan
  • No street view available for this location

New bridges in Ryan, OK - historical statistics
  • New bridges - historical statistics
  • 31930-1939
  • 31950-1959
  • 11970-1979
  • 21980-1989
  • 11990-1999
  • 32010-2019
  • 12020-2022
Reconstructed bridges in Ryan, OK - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11960-1969
  • 11970-1979
Average Bridge Daily Traffic in Ryan, OK
Average Bridge Truck Traffic in Ryan, OK
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 83.3%Good
  • 16.7%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 83.3%Very good
  • 16.7%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 33.3%Very good
  • 16.7%Good
  • 33.3%Satisfactory
  • 16.7%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 42.9%Very good
  • 28.6%Good
  • 14.3%Satisfactory
  • 7.1%Fair
  • 7.1%Serious
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 25.0%Very good
  • 37.5%Good
  • 25.0%Satisfactory
  • 12.5%Critical
Find on map >>   Show street view

Structure Number: 3535,  Location: 1.0 MI S JCT SH32 (Lat: 34.009061,  Lng: -97.946092),  Route carried "on" structure: US 81,  Year Built: 1932,  Year Reconstructed: 1965,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 1,600 (year 2020),  Truck Traffic: 25%,  Average Future Daily Traffic: 2,560 (year 2040),  Design Load: H 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 24.547,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.4m (11.2ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 41.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.85m (2.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $230,000,  Roadway Improvement Cost: $380,000,  Total Project Cost: $644,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 5336,  Location: .6W OF US75 (Lat: 35.609972,  Lng: -95.971819),  Route carried "on" structure: City street 4340,  Year Built: 1937,  Year Reconstructed: 1976,  Status: Posted for load,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 1,500 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 2,400 (year 2040),  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.655,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.0m (36.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 20.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 12.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 3.63m (11.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5773,  Location: .2W OF US81 (Lat: 34.000372,  Lng: -97.944386),  Route carried "on" structure: County highway N2830,  Year Built: 1938,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 75 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 120 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.287,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 37.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.72m (8.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 12968,  Location: 8 N OF JCT SH 152 (Lat: 35.404633,  Lng: -99.717528),  Route carried "on" structure: County highway 505,  Year Built: 1953,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 160 (year 2040),  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.872,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.52m (11.55ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 13215,  Location: 7.9 MI E JCT SH18 (Lat: 36.458611,  Lng: -96.593769),  Route carried "on" structure: State highway 20,  Year Built: 1954,  Status: Open,  Structure Length: 4.15m (13.62ft),  Average Daily Traffic: 820 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 1,312 (year 2040),  Design Load: H 20,  Features Intersected: SYCAMORE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.646,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.7m (44.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Fair,  Channel: Good,  Operating Rating: 47.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.34m (24.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $613,000,  Roadway Improvement Cost: $1,012,000,  Total Project Cost: $1,717,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 13454,  Location: .4 W OF CENTER VIEW (Lat: 35.433731,  Lng: -96.673114),  Route carried "on" structure: County highway 6306C,  Year Built: 1955,  Status: Open,  Structure Length: 1.61m (5.28ft),  Average Daily Traffic: 880 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 1,408 (year 2040),  Design Load: HS 20,  Features Intersected: SHAN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.618,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Serious,  Culverts: Critical,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 19.1 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.46m (14.63ft),  Designated Inspection Frequency: Every 6 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 19155,  Location: 4400 S. MEMORIAL DR. (Lat: 36.099950,  Lng: -95.886689),  Route carried "on" structure: City street N4000,  Year Built: 1976,  Status: Open,  Structure Length: 0.99m (3.25ft),  Average Daily Traffic: 24,000 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 38,400 (year 2040),  Design Load: HS 20,  Features Intersected: BELL CREEK TRIB.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.644,  Lanes on structure: 5,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 20.7m (67.9ft),  Skew: 23 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 20.7m (67.9ft),  Out-to-Out Width: 26.8m (87.9ft)

Condition: Channel: Very good,  Culverts: Satisfactory,  Operating Rating: 42.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.47m (11.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 19787,  Location: 7.49 N BRYAN C/L (Lat: 34.257933,  Lng: -96.212356),  Route carried "on" structure: US 69,  Year Built: 1980,  Status: Open,  Structure Length: 3.84m (12.60ft),  Average Daily Traffic: 8,900 (year 2020),  Truck Traffic: 29%,  Average Future Daily Traffic: 14,240 (year 2040),  Design Load: HS 20,  Features Intersected: CLEAR BOGGY CREEK O'FLOW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.051,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.5m (64.0ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.8m (42.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 12.4m (40.7ft),  Out-to-Out Width: 13.3m (43.6ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 59.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.04m (23.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $592,000,  Roadway Improvement Cost: $976,000,  Total Project Cost: $1,657,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete
Find on map >>   Show street view

Structure Number: 22061,  Location: 1.0 MI SW OF RYAN (Lat: 34.013236,  Lng: -97.970911),  Route carried "on" structure: County highway 3411,  Year Built: 1988,  Status: Open,  Structure Length: 6.49m (21.29ft),  Average Daily Traffic: 275 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 440 (year 2040),  Design Load: HS 20,  Features Intersected: BEAVER CREEK,  Facility Carried by Structure: 3428AC MAJOR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.30m (30.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $475,000,  Roadway Improvement Cost: $261,000,  Total Project Cost: $740,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 24654,  Location: 0.8W OF US81/SH32 JCT. (Lat: 34.020267,  Lng: -97.971694),  Route carried "on" structure: County highway E2065,  Year Built: 1999,  Status: Open,  Structure Length: 6.28m (20.60ft),  Average Daily Traffic: 200 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 320 (year 2040),  Design Load: HS 20,  Features Intersected: BEAVER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.644,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.8m (25.6ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 29.9m (98.1ft),  Curb-To-Curb Width: 7.8m (25.6ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.14m (29.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $467,000,  Roadway Improvement Cost: $257,000,  Total Project Cost: $727,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 30486,  Location: .5S 2.1E OF RYAN (Lat: 34.013056,  Lng: -97.919722),  Route carried "on" structure: County highway E2070,  Year Built: 2013,  Status: Open,  Structure Length: 2.59m (8.50ft),  Average Daily Traffic: 75 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 120 (year 2040),  Design Load: HL 93,  Features Intersected: FROG CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.644,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.9m (85.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 62.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 3087,  Location: 8.2 N OF TX S/L (Lat: 33.988594,  Lng: -97.940900),  Route carried "on" structure: US 81,  Year Built: 2016,  Status: Open,  Structure Length: 6.11m (20.05ft),  Average Daily Traffic: 1,600 (year 2020),  Truck Traffic: 25%,  Average Future Daily Traffic: 2,560 (year 2040),  Design Load: HL 93,  Features Intersected: FLAT CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.767,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.4m (70.2ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.1m (46.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 31255,  Location: 1.7 N JCT S.H. 32 (Lat: 34.045233,  Lng: -97.959167),  Route carried "on" structure: US 81,  Year Built: 2018,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 2,200 (year 2020),  Truck Traffic: 25%,  Average Future Daily Traffic: 3,200 (year 2040),  Design Load: HL 93,  Features Intersected: CREEK
Minimum Vertical Clearance: 30.45m (99.90ft),  Kilometerpoint: 31.643,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.5m (18.0ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 90.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 71.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020
Find on map >>   Show street view

Structure Number: 32074,  Location: .5S 3.1W of RYAN (Lat: 34.012778,  Lng: -98.011944),  Route carried "on" structure: County highway E2070,  Year Built: 2020,  Status: Open,  Structure Length: 0.81m (2.66ft),  Average Daily Traffic: 30 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 80 (year 2040),  Design Load: HS 20,  Features Intersected: RED RIVER TRIB.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.777,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 14.5m (47.6ft),  Out-to-Out Width: 15.1m (49.5ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021
Discuss Ryan, Oklahoma (OK) on our hugely popular Oklahoma forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.