  • National Bridge Inventory (NBI) Statistics
  • 11Number of bridges
  • 62ft / 18.8mTotal length
  • $3,621,000Total costs
  • 7,452Total average daily traffic
  • 401Total average daily truck traffic
  • 11,178Total future (year 2031) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Sale City
  • No street view available for this location

New bridges in Sale City, GA - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 11940-1949
  • 11950-1959
  • 11970-1979
  • 51980-1989
  • 21990-1999
Average Bridge Truck Traffic in Sale City, GA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 50.0%Good
  • 50.0%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 25.0%Very good
  • 25.0%Good
  • 50.0%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 50.0%Good
  • 50.0%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 18.2%Very good
  • 54.5%Good
  • 18.2%Satisfactory
  • 9.1%Fair
Find on map >>   Show street view

Structure Number: 710085,  Location: APP 7 MI W OF FUNSTON (Lat: 31.221561,  Lng: -83.991175),  Route carried "on" structure: State highway 37,  Year Built: 1987,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 1,500 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,250 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: SLOCUMB BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 2.7m (8.9ft)

Condition: Channel: Very good,  Culverts: Good,  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $195,000,  Roadway Improvement Cost: $20,000,  Total Project Cost: $293,000
Find on map >>   Show street view

Structure Number: 710088,  Location: APP 7.5 MI W OF FUNSTON (Lat: 31.221558,  Lng: -83.993969),  Route carried "on" structure: State highway 37,  Year Built: 1988,  Status: Open,  Structure Length: 5.97m (19.59ft),  Average Daily Traffic: 1,500 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,250 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: LITTLE OCHLOCKONEE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 14.0m (45.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: December 2020,  Underwater Inspection Date: March 2018,  Bridge Improvement Cost: $766,000,  Roadway Improvement Cost: $77,000,  Total Project Cost: $1,149,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2050013,  Location: 2.5 MILES SOUTH OF SALE (Lat: 31.235439,  Lng: -84.047058),  Route carried "on" structure: State highway 37,  Year Built: 1923,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 1,340 (year 2011),  Truck Traffic: 21%,  Average Future Daily Traffic: 2,010 (year 2031),  Design Load: H 15,  Features Intersected: LOST CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 32.187,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.2m (36.7ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 59.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 41.24m (135.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $129,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $193,000
Find on map >>   Show street view

Structure Number: 2050026,  Location: 1 MILES SOUTH OF SALE CIT (Lat: 31.244947,  Lng: -84.027000),  Route carried "on" structure: State highway 93,  Year Built: 1943,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 540 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 810 (year 2031),  Design Load: H 15,  Features Intersected: SALLY'S BRANCH TRIB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 28.968,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $129,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $193,000
Find on map >>   Show street view

Structure Number: 2050027,  Location: 3.7 MI N OF SALE CITY (Lat: 31.312869,  Lng: -84.020839),  Route carried "on" structure: State highway 93,  Year Built: 1953,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 660 (year 2011),  Truck Traffic: 10%,  Average Future Daily Traffic: 990 (year 2031),  Design Load: H 15,  Features Intersected: RACCOON CREEK TRIB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 37.015,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $176,000,  Roadway Improvement Cost: $18,000,  Total Project Cost: $264,000
Find on map >>   Show street view

Structure Number: 2055015,  Location: APP 4 MI N OF COTTON (Lat: 31.217428,  Lng: -84.048058),  Route carried "on" structure: County highway 105,  Year Built: 1979,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 600 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 900 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: LOST CREEK,  Facility Carried by Structure: MT. ZION ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.875,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $82,000,  Roadway Improvement Cost: $8,000,  Total Project Cost: $123,000
Find on map >>   Show street view

Structure Number: 2055017,  Location: APP 1 MI E OF SALE CITY (Lat: 31.259439,  Lng: -84.005547),  Route carried "on" structure: County highway 106,  Year Built: 1989,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 600 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 900 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: SALLY'S BRANCH,  Facility Carried by Structure: EAST BROAD STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.875,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 2.7m (8.9ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: August 2020,  Underwater Inspection Date: September 2020,  Bridge Improvement Cost: $164,000,  Roadway Improvement Cost: $16,000,  Total Project Cost: $246,000
Find on map >>   Show street view

Structure Number: 205503,  Location: APP 3 MI NNE OF COTTON (Lat: 31.206589,  Lng: -84.043758),  Route carried "on" structure: County highway 128,  Year Built: 1992,  Status: Posted for load,  Structure Length: 1.92m (6.30ft),  Average Daily Traffic: 104 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 156 (year 2031),  Design Load: H 15,  Features Intersected: LOST CREEK,  Facility Carried by Structure: LAKE PLEASANT CH R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.828,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 2.7m (8.9ft),  Curb-To-Curb Width: 5.9m (19.4ft),  Out-to-Out Width: 6.2m (20.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 16.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 11.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $246,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $369,000,  Deck Structure Type: Wood or Timber
Find on map >>   Show street view

Structure Number: 2055055,  Location: APP 3.5 MI N OF SALE CITY (Lat: 31.312797,  Lng: -84.013808),  Route carried "on" structure: County highway 195,  Year Built: 1986,  Status: Posted for load,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 104 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 156 (year 2031),  Features Intersected: RACCOON CREEK TRIB,  Facility Carried by Structure: COOL SPRINGS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 5.9m (19.4ft),  Out-to-Out Width: 6.2m (20.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 9.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 5.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 41.39m (135.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $156,000,  Roadway Improvement Cost: $16,000,  Total Project Cost: $234,000,  Deck Structure Type: Wood or Timber
Find on map >>   Show street view

Structure Number: 2055065,  Location: APP 1.5 M SE OF SALE CITY (Lat: 31.241758,  Lng: -84.011519),  Route carried "on" structure: County highway 225,  Year Built: 1991,  Status: Posted for load,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 104 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 156 (year 2031),  Features Intersected: SALLY'S BRANCH TRIB,  Facility Carried by Structure: CHERRY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 4.9m (16.1ft),  Out-to-Out Width: 5.1m (16.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 11.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 7.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: August 2020,  Underwater Inspection Date: September 2020,  Bridge Improvement Cost: $234,000,  Roadway Improvement Cost: $23,000,  Total Project Cost: $352,000,  Deck Structure Type: Wood or Timber
Find on map >>   Show street view

Structure Number: 2055071,  Location: APP 3.7 MI NW OF SALE CTY (Lat: 31.311839,  Lng: -84.038689),  Route carried "on" structure: County highway 275,  Year Built: 1982,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 400 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 600 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: RACCOON CREEK TRIB,  Facility Carried by Structure: GREENOUGH ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.828,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 2.1m (6.9ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $137,000,  Roadway Improvement Cost: $14,000,  Total Project Cost: $205,000