Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Salome, Arizona (AZ)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 11Number of bridges
  • 52ft / 16.1mTotal length
  • 22,726Total average daily traffic
  • 3,360Total average daily truck traffic
  • 23,881Total future (year 2037) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Salome
  • No street view available for this location

New bridges in Salome, AZ - historical statistics
  • New bridges - historical statistics
  • 51930-1939
  • 41950-1959
  • 22000-2009
Average Bridge Truck Traffic in Salome, AZ
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 50.0%Good
  • 50.0%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 54.5%Good
  • 27.3%Satisfactory
  • 18.2%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 22.2%Very good
  • 55.6%Good
  • 22.2%Satisfactory
Find on map >>   Show street view

Structure Number: 426,  Location: 8.0 mi East Jct SR 72 (Lat: 33.791400,  Lng: -113.597300),  Route carried "on" structure: US 60,  Year Built: 1954,  Status: Open,  Structure Length: 2.96m (9.71ft),  Average Daily Traffic: 1,935 (year 2020),  Truck Traffic: 20%,  Average Future Daily Traffic: 1,945 (year 2040),  Design Load: HS 20,  Features Intersected: Dry Wash
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 92.666,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 5.8m (19.0ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Fair,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 427,  Location: 8.7 mi E Jct SR 72 (Lat: 33.795919,  Lng: -113.589133),  Route carried "on" structure: US 60,  Year Built: 1954,  Status: Open,  Structure Length: 1.80m (5.91ft),  Average Daily Traffic: 2,175 (year 2017),  Truck Traffic: 15%,  Average Future Daily Traffic: 3,230 (year 2037),  Design Load: HS 20,  Features Intersected: Dry Wash
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 93.780,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.8m (19.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Fair,  Channel: Good,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.53m (27.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 4023,  Location: 7.3 mi E Jct SR 72 (Lat: 33.784900,  Lng: -113.609100),  Route carried "on" structure: US 60,  Year Built: 1958,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 2,281 (year 2019),  Truck Traffic: 16%,  Average Future Daily Traffic: 2,291 (year 2039),  Design Load: HS 20,  Features Intersected: Wash
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 91.530,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.7m (41.7ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: April 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 4024,  Location: 9.0 mi E Jct SR 72 (Lat: 33.799600,  Lng: -113.582500),  Route carried "on" structure: US 60,  Year Built: 1934,  Year Reconstructed: 1958,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 2,281 (year 2019),  Truck Traffic: 16%,  Average Future Daily Traffic: 2,291 (year 2039),  Design Load: HS 20,  Features Intersected: Wash
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 94.470,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.7m (41.7ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: April 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 4025,  Location: 9.4 mi E Jct SR 72 (Lat: 33.801500,  Lng: -113.579100),  Route carried "on" structure: US 60,  Year Built: 1958,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 2,281 (year 2019),  Truck Traffic: 16%,  Average Future Daily Traffic: 2,291 (year 2039),  Design Load: HS 20,  Features Intersected: Wash
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 94.850,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 70.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: April 2021
Find on map >>   Show street view

Structure Number: 4026,  Location: 9.8 mi E Jct SR 72 (Lat: 33.805300,  Lng: -113.572200),  Route carried "on" structure: US 60,  Year Built: 1934,  Year Reconstructed: 1958,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 2,281 (year 2019),  Truck Traffic: 16%,  Average Future Daily Traffic: 2,291 (year 2039),  Design Load: HS 20,  Features Intersected: Wash
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 95.600,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.7m (41.7ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: April 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 4027,  Location: 10.1 mi E Jct SR 72 (Lat: 33.807500,  Lng: -113.568200),  Route carried "on" structure: US 60,  Year Built: 1934,  Year Reconstructed: 1958,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 2,281 (year 2019),  Truck Traffic: 16%,  Average Future Daily Traffic: 2,291 (year 2039),  Design Load: HS 20,  Features Intersected: Wash
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 96.070,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.7m (41.7ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: May 2017,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 4028,  Location: 10.4 mi E Jct SR 72 (Lat: 33.809900,  Lng: -113.563800),  Route carried "on" structure: US 60,  Year Built: 1934,  Year Reconstructed: 1958,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 2,281 (year 2019),  Truck Traffic: 16%,  Average Future Daily Traffic: 2,291 (year 2039),  Design Load: HS 20,  Features Intersected: Wash
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 96.550,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: April 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 4029,  Location: 10.6 mi E Jct SR 72 (Lat: 33.811400,  Lng: -113.561100),  Route carried "on" structure: US 60,  Year Built: 1934,  Year Reconstructed: 1958,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 2,281 (year 2019),  Truck Traffic: 16%,  Average Future Daily Traffic: 2,291 (year 2039),  Design Load: HS 20,  Features Intersected: Wash
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 96.860,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: April 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 10301,  Location: 1 mile S US 60 (Lat: 33.767700,  Lng: -113.610300),  Route carried "on" structure: County highway ,  Year Built: 2001,  Status: Open,  Structure Length: 4.05m (13.29ft),  Average Daily Traffic: 1,576 (year 2022),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,586 (year 2042),  Design Load: HS 20,  Features Intersected: Salome Wash,  Facility Carried by Structure: Harquahala Rd
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 10,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Channel: Fair,  Culverts: Very good,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: January 2022,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 10374,  Location: 2 mi SE of US 60 (Lat: 33.768500,  Lng: -113.583700),  Route carried "on" structure: County highway ,  Year Built: 2001,  Status: Open,  Structure Length: 2.01m (6.59ft),  Average Daily Traffic: 1,073 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,083 (year 2042),  Design Load: HS 20,  Features Intersected: Centennial Wash,  Facility Carried by Structure: Salome Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: January 2022
Discuss Salome, Arizona (AZ) on our hugely popular Arizona forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.