Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Scotts Hill, Tennessee (TN)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 17Number of bridges
  • 59ft / 18.4mTotal length
  • $1,152,000Total costs
  • 21,414Total average daily traffic
  • 1,313Total average daily truck traffic
  • 35,728Total future (year 2038) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Scotts Hill
  • No street view available for this location

New bridges in Scotts Hill, TN - historical statistics
  • New bridges - historical statistics
  • 51930-1939
  • 11950-1959
  • 31960-1969
  • 31970-1979
  • 41980-1989
  • 12000-2009
Average Bridge Daily Traffic in Scotts Hill, TN
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 33.3%Good
  • 66.7%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 33.3%Good
  • 33.3%Satisfactory
  • 33.3%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 66.7%Satisfactory
  • 33.3%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 11.8%Good
  • 76.5%Satisfactory
  • 11.8%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 7.1%Good
  • 78.6%Satisfactory
  • 14.3%Fair
Find on map >>   Show street view

Structure Number: 200A3400001,  Location: 3.6 MI SW JCT SR69&SR202 (Lat: 35.521111,  Lng: -88.164083),  Route carried "on" structure: County highway 340,  Year Built: 1977,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 120 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 192 (year 2040),  Design Load: H 15,  Features Intersected: RUSHING CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.605,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 84.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 200A3450001,  Location: 2.9MI NW JCT SR114&SR202 (Lat: 35.508350,  Lng: -88.179236),  Route carried "on" structure: County highway 345,  Year Built: 1983,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 120 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 192 (year 2040),  Design Load: HS 20,  Features Intersected: RUSHING CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.913,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 6.9m (22.6ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 200A3450003,  Location: 3.4 MI NW JCT SR114&SR202 (Lat: 35.513167,  Lng: -88.179917),  Route carried "on" structure: County highway 345,  Year Built: 1988,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 120 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 192 (year 2040),  Design Load: HS 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.378,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 20SR1000001,  Location: 6.7 MI.SW.OF DECATURVILLE (Lat: 35.531389,  Lng: -88.236222),  Route carried "on" structure: State highway 100,  Year Built: 1930,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 2,900 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 4,640 (year 2042),  Design Load: H 15,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.692,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.85m (2.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $74,000,  Roadway Improvement Cost: $8,000,  Total Project Cost: $112,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 20SR1000003,  Location: 6.2 MI.SW.OF DECATURVILLE (Lat: 35.534194,  Lng: -88.229667),  Route carried "on" structure: State highway 100,  Year Built: 1930,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 2,900 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 4,640 (year 2042),  Design Load: H 15,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.368,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.85m (2.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $76,000,  Roadway Improvement Cost: $8,000,  Total Project Cost: $115,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 20SR1140003,  Location: 3.4 MI.SW.OF SCOTT'S HILL (Lat: 35.477278,  Lng: -88.196806),  Route carried "on" structure: State highway 114,  Year Built: 1958,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 814 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,264 (year 2040),  Design Load: HS 20,  Features Intersected: MURRHY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.342,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 54.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021
Find on map >>   Show street view

Structure Number: 39003070011,  Location: 2.5 MI NW OF SCOTTS HILL (Lat: 35.556111,  Lng: -88.283278),  Route carried "on" structure: County highway 1022,  Year Built: 1984,  Status: Open,  Structure Length: 1.49m (4.89ft),  Average Daily Traffic: 221 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 400 (year 2040),  Design Load: HS 20,  Features Intersected: CANE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.056,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.6m (15.1ft),  Curb-To-Curb Width: 6.9m (22.6ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 77.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 39003070013,  Location: 2.7 MI N OF SCOTTS HILL (Lat: 35.557611,  Lng: -88.285694),  Route carried "on" structure: County highway 1022,  Year Built: 1979,  Status: Posted for load,  Structure Length: 2.04m (6.69ft),  Average Daily Traffic: 221 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 400 (year 2040),  Design Load: H 15,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.329,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 36.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 39016870001,  Location: 2.5 MI N OF SR100 (Lat: 35.545333,  Lng: -88.290611),  Route carried "on" structure: County highway 1687,  Year Built: 1987,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 208 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 320 (year 2040),  Design Load: HS 20,  Features Intersected: CANE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.798,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.5m (18.0ft),  Curb-To-Curb Width: 6.9m (22.6ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 89.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 390A2490001,  Location: 2.5 MI N OF SR100 (Lat: 35.536833,  Lng: -88.280167),  Route carried "on" structure: County highway 249,  Year Built: 1965,  Status: Posted for load,  Structure Length: 2.04m (6.69ft),  Average Daily Traffic: 100 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 160 (year 2040),  Design Load: H 15,  Features Intersected: CANE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.151,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 4.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 4.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 2.80m (9.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $478,000,  Roadway Improvement Cost: $48,000,  Total Project Cost: $718,000 ( Estimate for 2020),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 390A3010001,  Location: 2.5 MI E OF SR104 (Lat: 35.488972,  Lng: -88.292583),  Route carried "on" structure: County highway 301,  Year Built: 1975,  Status: Posted for load,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 100 (year 2022),  Truck Traffic: 6%,  Average Future Daily Traffic: 160 (year 2040),  Features Intersected: WEST PRONG DOE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.271,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 2 degrees,  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb-To-Curb Width: 6.0m (19.7ft),  Out-to-Out Width: 6.2m (20.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 25.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 20.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $52,000,  Roadway Improvement Cost: $6,000,  Total Project Cost: $79,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 390A3700001,  Location: 0.5 MI W OF DECATUR CO. (Lat: 35.561083,  Lng: -88.229028),  Route carried "on" structure: County highway 370,  Year Built: 2001,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 100 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 160 (year 2038),  Design Load: HS 20,  Features Intersected: FLAT CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.289,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.5m (18.0ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 39S80670017,  Location: .81 M SE JCT SR100&SR114 (Lat: 35.523861,  Lng: -88.251444),  Route carried "on" structure: State highway 114,  Year Built: 1965,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 3,377 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 5,728 (year 2040),  Design Load: HS 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.304,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 89.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020
Find on map >>   Show street view

Structure Number: 39S81350009,  Location: 6.4 M S OF SR104 (Lat: 35.484472,  Lng: -88.262806),  Route carried "on" structure: State highway 201,  Year Built: 1961,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 591 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 864 (year 2040),  Design Load: HS 20,  Features Intersected: MIDDLE FORK DOE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.406,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 58.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020
Find on map >>   Show street view

Structure Number: 39SR1000007,  Location: 1 MI S OF SR104 (Lat: 35.514056,  Lng: -88.299417),  Route carried "on" structure: State highway 100,  Year Built: 1931,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 3,311 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 5,968 (year 2040),  Design Load: H 15,  Features Intersected: EAST FORK CANE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.652,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 11.7m (38.4ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 48.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.82m (2.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $45,000,  Roadway Improvement Cost: $5,000,  Total Project Cost: $68,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 39SR1000009,  Location: .1 MI S OF HILL RD (Lat: 35.517472,  Lng: -88.284444),  Route carried "on" structure: State highway 100,  Year Built: 1931,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 3,311 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 5,968 (year 2040),  Design Load: H 15,  Features Intersected: EAST FORK CANE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.052,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.7m (31.8ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 42.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.31m (4.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $38,000,  Roadway Improvement Cost: $4,000,  Total Project Cost: $58,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 39SR1000011,  Location: 1 MI S OF SR114 (Lat: 35.527778,  Lng: -88.244917),  Route carried "on" structure: State highway 100,  Year Built: 1931,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 2,900 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 4,480 (year 2040),  Design Load: HS 20,  Features Intersected: FLAT CREEK,  Facility Carried by Structure: FAP 22
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.834,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 9.3m (30.5ft),  Out-to-Out Width: 14.5m (47.6ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 48.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.98m (3.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Discuss Scotts Hill, Tennessee (TN) on our hugely popular Tennessee forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.