Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Selmont-West Selmont, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 17Number of bridges
  • 446ft / 136mTotal length
  • $48,080,000Total costs
  • 58,727Total average daily traffic
  • 6,111Total average daily truck traffic
  • 78,796Total future (year 2031) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Selmont-West Selmont
  • No street view available for this location

New bridges in Selmont-West Selmont, AL - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 11930-1939
  • 21940-1949
  • 71970-1979
  • 11980-1989
  • 31990-1999
  • 22000-2009
Reconstructed bridges in Selmont-West Selmont, AL - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11980-1989
  • 11990-1999
Average Bridge Daily Traffic in Selmont-West Selmont, AL
Average Bridge Truck Traffic in Selmont-West Selmont, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 20.0%Very good
  • 20.0%Good
  • 40.0%Satisfactory
  • 20.0%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 10.0%Very good
  • 30.0%Good
  • 60.0%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 10.0%Very good
  • 50.0%Good
  • 30.0%Satisfactory
  • 10.0%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 5.9%Very good
  • 58.8%Good
  • 29.4%Satisfactory
  • 5.9%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 42.9%Good
  • 57.1%Satisfactory
Find on map >>   Show street view

Structure Number: 1199,  Location: 1.3 MI E INT CHEROKEE #29 (Lat: 33.987194,  Lng: -85.520469),  Route carried "on" structure: County highway 8,  Year Built: 1935,  Status: Posted for load,  Structure Length: 3.69m (12.11ft),  Average Daily Traffic: 325 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 450 (year 2040),  Design Load: H 15,  Features Intersected: HURRICANE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.5m (41.0ft),  Curb-To-Curb Width: 4.9m (16.1ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 35.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 4.61m (15.12ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: September 2020,  Other Special Inspection Date: September 2021,  Bridge Improvement Cost: $506,000,  Roadway Improvement Cost: $51,000,  Total Project Cost: $557,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2275,  Location: 0.5 MI.W.OF AL.41 (Lat: 32.379017,  Lng: -87.009817),  Route carried "on" structure: US 80,  Year Built: 1940,  Status: Open,  Structure Length: 10.06m (33.01ft),  Average Daily Traffic: 5,235 (year 2013),  Truck Traffic: 5%,  Average Future Daily Traffic: 6,845 (year 2033),  Design Load: H 20,  Features Intersected: ALABAMA RIVER RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 140.330,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 11,  Length of Maximum Span: 9.1m (29.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.0m (29.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 10.99m (36.06ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $2,185,000,  Roadway Improvement Cost: $219,000,  Total Project Cost: $2,404,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2363,  Location: 4.9 MI. N. SARDIS (Lat: 32.356525,  Lng: -87.002017),  Route carried "on" structure: State highway 41,  Year Built: 1940,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 4,830 (year 2013),  Truck Traffic: 9%,  Average Future Daily Traffic: 5,988 (year 2033),  Design Load: H 15,  Features Intersected: FOUR MILE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 196.042,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 55.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Underwater Inspection Date: October 2020,  Bridge Improvement Cost: $390,000,  Roadway Improvement Cost: $39,000,  Total Project Cost: $429,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 1034,  Location: 1.0 MI.N.OF US 80 (Lat: 32.385117,  Lng: -86.999917),  Route carried "on" structure: State highway 41,  Year Built: 1970,  Status: Open,  Structure Length: 46.15m (151.41ft),  Average Daily Traffic: 10,540 (year 2013),  Truck Traffic: 17%,  Average Future Daily Traffic: 13,066 (year 2033),  Design Load: HS 20,  Features Intersected: ALABAMA RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 199.395,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Navigation Control: Yes ( Vertical Clearance: 12.8m (42.0ft), Horizontal Clearance: 63.4m (208.0ft)),  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 11,  Length of Maximum Span: 67.1m (220.1ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 37.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 46.15m (151.41ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Critical Feature Inspection Date: October 2020,  Underwater Inspection Date: December 2020,  Bridge Improvement Cost: $13,291,000,  Roadway Improvement Cost: $1,329,000,  Total Project Cost: $14,620,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 11631,  Location: 3.0 MI.NORTH WETUMPKA (Lat: 32.602150,  Lng: -86.214950),  Route carried "on" structure: US 231,  Year Built: 1976,  Status: Open,  Structure Length: 1.55m (5.09ft),  Average Daily Traffic: 6,070 (year 2013),  Truck Traffic: 5%,  Average Future Daily Traffic: 7,570 (year 2033),  Design Load: HS 20,  Features Intersected: YELLOW WATER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 269.930,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 57.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.23m (7.32ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $1,367,000,  Roadway Improvement Cost: $137,000,  Total Project Cost: $1,504,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 11642,  Location: SEC 32 T19N R19E (Lat: 32.586667,  Lng: -86.195000),  Route carried "on" structure: County highway 32,  Year Built: 1976,  Status: Open,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 160 (year 1998),  Truck Traffic: 20%,  Average Future Daily Traffic: 180 (year 2031),  Design Load: H 15,  Features Intersected: TAYLOR CREEK,  Facility Carried by Structure: Williams Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 45.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.44m (8.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $451,000,  Roadway Improvement Cost: $45,000,  Total Project Cost: $496,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 11643,  Location: 7.8 MI E TALLADEGA LINE (Lat: 33.036900,  Lng: -86.124200),  Route carried "on" structure: State highway 38,  Year Built: 1976,  Status: Open,  Structure Length: 13.60m (44.62ft),  Average Daily Traffic: 5,547 (year 2018),  Truck Traffic: 17%,  Average Future Daily Traffic: 7,766 (year 2038),  Design Load: HS 20,  Features Intersected: HATCHET CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 88.728,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 62.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 36.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 14.41m (47.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $4,050,000,  Roadway Improvement Cost: $405,000,  Total Project Cost: $4,455,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 11989,  Location: 0.8 MI W SPANISH FT (Lat: 30.668481,  Lng: -87.927581),  Route carried "on" structure: US 90,  Year Built: 1978,  Status: Open,  Structure Length: 41.61m (136.52ft),  Average Daily Traffic: 10,833 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 16,249 (year 2040),  Design Load: HS 20,  Features Intersected: BLAKELEY RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 68.333,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 21,  Length of Maximum Span: 19.8m (65.0ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 41.61m (136.52ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Underwater Inspection Date: Febuary 2021,  Bridge Improvement Cost: $11,982,000,  Roadway Improvement Cost: $1,198,000,  Total Project Cost: $13,180,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 12183,  Location: 0.2 E CO ROUTE 31 (Lat: 33.233283,  Lng: -85.838356),  Route carried "on" structure: County highway 45,  Year Built: 1979,  Status: Posted for load,  Structure Length: 1.33m (4.36ft),  Average Daily Traffic: 18 (year 2016),  Average Future Daily Traffic: 27 (year 2036),  Features Intersected: METCALF CREEK,  Facility Carried by Structure: CREEK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.4m (40.7ft),  Curb-To-Curb Width: 4.6m (15.1ft),  Out-to-Out Width: 4.6m (15.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Very good,  Channel: Good,  Operating Rating: 13.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 8.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.01m (6.59ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 6 months,  Other Special Inspection Frequency: Every 6 months,  Inspection Date: March 2021,  Critical Feature Inspection Date: September 2021,  Other Special Inspection Date: September 2021,  Bridge Improvement Cost: $207,000,  Roadway Improvement Cost: $21,000,  Total Project Cost: $228,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 12248,  Location: 5.3 MI E OF AL 51 JCT (Lat: 32.085900,  Lng: -85.542400),  Route carried "on" structure: US 82,  Year Built: 1927,  Year Reconstructed: 1980,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 2,270 (year 2013),  Truck Traffic: 22%,  Average Future Daily Traffic: 2,939 (year 2033),  Design Load: H 15,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 339.195,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 80.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.68m (5.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $738,000,  Roadway Improvement Cost: $74,000,  Total Project Cost: $812,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 12512,  Location: 2 MI W SR 41 S (Lat: 32.318786,  Lng: -87.012375),  Route carried "on" structure: County highway 139,  Year Built: 1976,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 50 (year 2012),  Average Future Daily Traffic: 100 (year 2036),  Design Load: H 10,  Features Intersected: LIAS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.20m (7.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,131,000,  Roadway Improvement Cost: $113,000,  Total Project Cost: $1,244,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 13443,  Location: 3.5 MI W JCT SR 25 * 68 (Lat: 34.158019,  Lng: -85.813747),  Route carried "on" structure: US 411,  Year Built: 1985,  Year Reconstructed: 1998,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 8,329 (year 2019),  Truck Traffic: 12%,  Average Future Daily Traffic: 11,661 (year 2039),  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 374.485,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 57.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.26m (4.13ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,907,000,  Roadway Improvement Cost: $191,000,  Total Project Cost: $2,098,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1535,  Location: 0.7 MI N OF CR 139 (Lat: 32.328881,  Lng: -87.008319),  Route carried "on" structure: County highway 77,  Year Built: 1991,  Status: Open,  Structure Length: 6.22m (20.41ft),  Average Daily Traffic: 200 (year 2012),  Truck Traffic: 5%,  Average Future Daily Traffic: 250 (year 2040),  Design Load: HS 15,  Features Intersected: SIX MILE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 87.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 7.26m (23.82ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $1,194,000,  Roadway Improvement Cost: $119,000,  Total Project Cost: $1,313,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 16827,  Location: 0.2 MI S CR 139 (Lat: 32.307483,  Lng: -86.992083),  Route carried "on" structure: County highway 142,  Year Built: 1996,  Status: Posted for load,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 30 (year 2011),  Average Future Daily Traffic: 60 (year 2040),  Design Load: H 15,  Features Intersected: LIAS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 6.1m (20.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 5.8m (19.0ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 16.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 11.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.89m (6.20ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: April 2020,  Other Special Inspection Date: April 2021,  Bridge Improvement Cost: $259,000,  Roadway Improvement Cost: $26,000,  Total Project Cost: $285,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 1731,  Location: 0.3 MI E CR 56 (Lat: 32.364167,  Lng: -86.979094),  Route carried "on" structure: County highway 74,  Year Built: 1998,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 350 (year 2010),  Truck Traffic: 5%,  Average Future Daily Traffic: 500 (year 2040),  Design Load: H 15,  Features Intersected: TARVER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.999,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 87.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.71m (5.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $351,000,  Roadway Improvement Cost: $35,000,  Total Project Cost: $386,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 18344,  Location: 2.5 MI. N. SARDIS (Lat: 32.321667,  Lng: -86.993333),  Route carried "on" structure: State highway 41,  Year Built: 2004,  Status: Open,  Structure Length: 2.13m (6.99ft),  Average Daily Traffic: 2,940 (year 2013),  Truck Traffic: 10%,  Average Future Daily Traffic: 3,645 (year 2033),  Design Load: HS 20,  Features Intersected: PINE FLAT CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 191.832,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 12 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 4.9m (16.1ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.91m (9.55ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $2,844,000,  Roadway Improvement Cost: $284,000,  Total Project Cost: $3,128,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 19822,  Location: 0.5 MI E SR 41 S (Lat: 32.322014,  Lng: -86.979867),  Route carried "on" structure: County highway ,  Year Built: 2005,  Status: Open,  Structure Length: 1.87m (6.14ft),  Average Daily Traffic: 1,000 (year 2012),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,500 (year 2040),  Features Intersected: SIX MILE CREEK,  Facility Carried by Structure: IND ACCESS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.5m (24.6ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 59.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.60m (8.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $855,000,  Roadway Improvement Cost: $86,000,  Total Project Cost: $941,000 ( Estimate for 2022)
Discuss Selmont-West Selmont, Alabama (AL) on our hugely popular Alabama forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.