  • National Bridge Inventory (NBI) Statistics
  • 17Number of bridges
  • 256ft / 77.7mTotal length
  • $64,347,000Total costs
  • 67,015Total average daily traffic
  • 5,647Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Sidney
  • No street view available for this location

New bridges in Sidney, NY - historical statistics
  • New bridges - historical statistics
  • 31930-1939
  • 11940-1949
  • 11950-1959
  • 101970-1979
  • 22000-2009
Reconstructed bridges in Sidney, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11970-1979
  • 01980-1989
  • 11990-1999
  • 12000-2009
Average Bridge Daily Traffic in Sidney, NY
Average Bridge Truck Traffic in Sidney, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 15.4%Very good
  • 30.8%Good
  • 38.5%Satisfactory
  • 15.4%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 23.1%Very good
  • 38.5%Good
  • 38.5%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 7.7%Very good
  • 38.5%Good
  • 23.1%Satisfactory
  • 23.1%Fair
  • 7.7%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 28.6%Good
  • 28.6%Satisfactory
  • 28.6%Fair
  • 14.3%Poor
Find on map >>   Show street view

Structure Number: 100385,  Location: 2.7 MI NE JCT SH7 & SH206 (Lat: 42.300042,  Lng: -75.433422),  Route carried "on" structure: State highway 7,  Year Built: 1936,  Status: Open,  Structure Length: 2.68m (8.79ft),  Average Daily Traffic: 3,094 (year 2015),  Truck Traffic: 7%,  Average Future Daily Traffic: 3,227 (year 2040),  Features Intersected: D&H RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.027,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 26.2m (86.0ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 9.9m (32.5ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 48.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 36.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 2.68m (8.79ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Critical Feature Inspection Date: September 2021,  Bridge Improvement Cost: $1,714,000,  Roadway Improvement Cost: $1,003,000,  Total Project Cost: $2,717,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 100386,  Location: JCT SH 7 & UNADILLA RIVER (Lat: 42.317442,  Lng: -75.409833),  Route carried "on" structure: State highway 7,  Year Built: 2002,  Status: Open,  Structure Length: 9.02m (29.59ft),  Average Daily Traffic: 3,179 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 3,933 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: UNADILLA RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.499,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 46.3m (151.9ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.02m (29.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $2,533,000,  Roadway Improvement Cost: $1,483,000,  Total Project Cost: $4,016,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 100447,  Location: JCT RTE 8 + SUSQUEHANNA R (Lat: 42.317853,  Lng: -75.394447),  Route carried "on" structure: County highway ,  Year Built: 1936,  Year Reconstructed: 1979,  Status: Open,  Structure Length: 11.73m (38.48ft),  Average Daily Traffic: 4,712 (year 2017),  Truck Traffic: 4%,  Average Future Daily Traffic: 5,830 (year 2040),  Features Intersected: SUSQUEHANNA RIVER,  Facility Carried by Structure: MAIN STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.451,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 38.1m (125.0ft),  Curb or Sidewalk Widths: Left: 1.9m (6.2ft),  Right: 1.9m (6.2ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Poor,  Channel: Poor,  Operating Rating: 50.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.73m (38.48ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: September 2020,  Critical Feature Inspection Date: September 2020,  Underwater Inspection Date: April 2021,  Bridge Improvement Cost: $11,404,000,  Roadway Improvement Cost: $6,678,000,  Total Project Cost: $18,082,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 104041,  Location: 1.2 MI SE JCT SH 206 & SH (Lat: 42.249608,  Lng: -75.430339),  Route carried "on" structure: State highway 206,  Year Built: 1959,  Year Reconstructed: 2012,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 1,297 (year 2016),  Truck Traffic: 9%,  Average Future Daily Traffic: 1,305 (year 2040),  Design Load: H 20,  Features Intersected: UNNAMED CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 40.450,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 70.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 27.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.82m (2.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $1,475,000,  Roadway Improvement Cost: $864,000,  Total Project Cost: $2,338,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1094999,  Location: JCT RTS 8 & I-88 (Lat: 42.293458,  Lng: -75.406358),  Route carried "on" structure: State highway 8,  Year Built: 1977,  Status: Open,  Structure Length: 7.19m (23.59ft),  Average Daily Traffic: 7,084 (year 2020),  Truck Traffic: 13%,  Average Future Daily Traffic: 7,225 (year 2040),  Design Load: HS 20,  Features Intersected: 88I 88I93031005 WB, RTE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 31.874,  Lanes on structure: 5,  Lanes under structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.2m (76.1ft),  Skew: 21 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 35.6m (116.8ft),  Curb-To-Curb Width: 23.6m (77.4ft),  Out-to-Out Width: 25.0m (82.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 79.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.19m (23.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $4,380,000,  Roadway Improvement Cost: $2,565,000,  Total Project Cost: $6,946,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 1095,  Location: JCT SH 8 & SUSQUEHANNA RV (Lat: 42.315853,  Lng: -75.412308),  Route carried "on" structure: State highway 8,  Year Built: 1977,  Status: Open,  Structure Length: 15.39m (50.49ft),  Average Daily Traffic: 6,353 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 6,480 (year 2040),  Design Load: HS 20,  Features Intersected: SUSQUEHANNA RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 45.1m (148.0ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Inventory Rating: 60.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 15.39m (50.49ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: July 2020,  Underwater Inspection Date: September 2018,  Bridge Improvement Cost: $5,099,000,  Roadway Improvement Cost: $2,986,000,  Total Project Cost: $8,085,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 1095019,  Location: .8 MI N JCT RTS 8 & I-88 (Lat: 42.306614,  Lng: -75.403178),  Route carried "on" structure: State highway 8,  Year Built: 1977,  Status: Open,  Structure Length: 7.10m (23.29ft),  Average Daily Traffic: 7,084 (year 2018),  Truck Traffic: 11%,  Average Future Daily Traffic: 7,225 (year 2040),  Design Load: HS 20,  Features Intersected: NORFOLK SOUTHERN RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 33.338,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 26.8m (87.9ft),  Skew: 33 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 28.9m (94.8ft),  Curb-To-Curb Width: 26.6m (87.3ft),  Out-to-Out Width: 27.5m (90.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 62.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.10m (23.29ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $4,058,000,  Roadway Improvement Cost: $2,376,000,  Total Project Cost: $6,434,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 1095121,  Location: .8 MILE E JCT I88 & SH 8 (Lat: 42.294789,  Lng: -75.388628),  Route carried "on" structure: Interstate 88,  Year Built: 1974,  Status: Open,  Structure Length: 3.38m (11.09ft),  Average Daily Traffic: 5,395 (year 2009),  Truck Traffic: 27%,  Average Future Daily Traffic: 7,552 (year 2029),  Design Load: HS 20,  Features Intersected: West Main Street / Co. R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.253,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 32.6m (107.0ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 78.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.38m (11.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $1,326,000,  Roadway Improvement Cost: $777,000,  Total Project Cost: $2,103,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 1095122,  Location: .8 MILE E JCT I88 & SH 8 (Lat: 42.294406,  Lng: -75.388603),  Route carried "on" structure: Interstate 88,  Year Built: 1974,  Status: Open,  Structure Length: 3.38m (11.09ft),  Average Daily Traffic: 4,545 (year 2019),  Truck Traffic: 23%,  Average Future Daily Traffic: 5,978 (year 2040),  Design Load: HS 20,  Features Intersected: West Main Street / Co. R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.253,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 32.6m (107.0ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 78.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.38m (11.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $1,326,000,  Roadway Improvement Cost: $777,000,  Total Project Cost: $2,103,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 109513,  Location: 26 MI E JCT RTS I-88 + 8 (Lat: 42.311092,  Lng: -75.362597),  Route carried "on" structure: City street ,  Year Built: 1974,  Status: Open,  Structure Length: 8.72m (28.61ft),  Average Daily Traffic: 149 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 209 (year 2039),  Design Load: HS 20,  Features Intersected: 88I 88I93031032, RTE I88,  Facility Carried by Structure: PINE HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.475,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 45.1m (148.0ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.71m (28.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $2,361,000,  Roadway Improvement Cost: $1,382,000,  Total Project Cost: $3,743,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 335017,  Location: 4.6 MI OF BAINBRIDGE (Lat: 42.253247,  Lng: -75.423247),  Route carried "on" structure: Other road ,  Year Built: 2000,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 157 (year 2016),  Truck Traffic: 6%,  Average Future Daily Traffic: 220 (year 2036),  Design Load: HS 25 or greater,  Features Intersected: BIG BROOK,  Facility Carried by Structure: BUTTS ROAD TR11
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.644,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.7m (35.1ft),  Curb-To-Curb Width: 6.9m (22.6ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Fair,  Operating Rating: 77.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.12m (3.67ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $336,000,  Roadway Improvement Cost: $197,000,  Total Project Cost: $532,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 335364,  Location: .5 MI E OF EAST GUILFORD (Lat: 42.341842,  Lng: -75.393803),  Route carried "on" structure: County highway ,  Year Built: 1948,  Status: Open,  Structure Length: 1.68m (5.51ft),  Average Daily Traffic: 925 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,295 (year 2038),  Features Intersected: ROGERS HOLLOW BRK,  Facility Carried by Structure: COUNTY ROAD 1
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.397,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.5m (54.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.67m (5.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $441,000,  Roadway Improvement Cost: $258,000,  Total Project Cost: $699,000 ( Estimate for 2021),  Deck Structure Type: Open Grating,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 335365,  Location: .5 MI E OF EAST GUILFORD (Lat: 42.341131,  Lng: -75.398478),  Route carried "on" structure: County highway ,  Year Built: 1935,  Year Reconstructed: 1995,  Status: Open,  Structure Length: 5.43m (17.81ft),  Average Daily Traffic: 956 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 1,338 (year 2039),  Features Intersected: UNADILLA RIVER,  Facility Carried by Structure: COUNTY ROAD 1
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 22.767,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 53.3m (174.9ft),  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 9.6m (31.5ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.42m (17.78ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Critical Feature Inspection Date: June 2021,  Bridge Improvement Cost: $4,131,000,  Roadway Improvement Cost: $2,419,000,  Total Project Cost: $6,549,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 1094999,  Location: JCT RTS 8 & I-88 (Lat: 42.293458,  Lng: -75.406358),  Route carried "under" structure: Interstate 88,  Year Built: 1977,  Structure Length: 0. m,  Average Daily Traffic: 10,596 (year 1999),  Features Intersected: 88I 88I93031005 WB, RTE,  Facility Carried by Structure: RTE 8
Minimum Vertical Clearance: 5.31m (17.42ft),  Kilometerpoint: 0.772,  Lanes on structure: 5,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 35.6m (116.8ft)

Find on map >>   Show street view

Structure Number: 1095121,  Location: .8 MILE E JCT I88 & SH 8 (Lat: 42.294789,  Lng: -75.388628),  Route carried "under" structure: Other road ,  Year Built: 1974,  Structure Length: 0. m,  Average Daily Traffic: 172 (year 2020),  Truck Traffic: 2%,  Features Intersected: West Main Street / Co. R,  Facility Carried by Structure: RTE I88
Minimum Vertical Clearance: 4.95m (16.24ft),  Kilometerpoint: 3.009,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.6m (107.0ft)

Find on map >>   Show street view

Structure Number: 1095122,  Location: .8 MILE E JCT I88 & SH 8 (Lat: 42.294406,  Lng: -75.388603),  Route carried "under" structure: Other road ,  Year Built: 1974,  Structure Length: 0. m,  Average Daily Traffic: 172 (year 2020),  Truck Traffic: 2%,  Features Intersected: West Main Street / Co. R,  Facility Carried by Structure: RTE I88
Minimum Vertical Clearance: 4.69m (15.39ft),  Kilometerpoint: 2.977,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.6m (107.0ft)

Find on map >>   Show street view

Structure Number: 109513,  Location: 26 MI E JCT RTS I-88 + 8 (Lat: 42.311092,  Lng: -75.362597),  Route carried "under" structure: Interstate 88,  Year Built: 1974,  Structure Length: 0. m,  Average Daily Traffic: 11,145 (year 2000),  Features Intersected: 88I 88I93031032, RTE I88,  Facility Carried by Structure: PINE HILL ROAD
Minimum Vertical Clearance: 7.01m (23.00ft),  Kilometerpoint: 5.197,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 45.1m (148.0ft)

Discuss Sidney, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.