Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for St. Peter, Minnesota (MN)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 14Number of bridges
  • 184ft / 56.1mTotal length
  • $1,405,999,000Total costs
  • 73,594Total average daily traffic
  • 4,800Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for St. Peter
  • No street view available for this location

New bridges in St. Peter, MN - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 11930-1939
  • 11960-1969
  • 31980-1989
  • 41990-1999
  • 22000-2009
  • 22010-2019
Average Bridge Daily Traffic in St. Peter, MN
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 22.2%Very good
  • 44.4%Good
  • 22.2%Satisfactory
  • 11.1%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 33.3%Very good
  • 44.4%Good
  • 11.1%Satisfactory
  • 11.1%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 33.3%Very good
  • 44.4%Good
  • 22.2%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 12.5%Very good
  • 62.5%Satisfactory
  • 25.0%Fair
Find on map >>   Show street view

Structure Number: 40002,  Location: 0.5 MI SE OF S JCT TH 16 (Lat: 44.307458,  Lng: -93.960044),  Route carried "on" structure: State highway 22,  Year Built: 1998,  Status: Open,  Structure Length: 19.60m (64.30ft),  Average Daily Traffic: 11,000 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 8,300 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: MINNESOTA RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.1m (43.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 35.4m (116.1ft),  Curb or Sidewalk Widths: Left: 3.0m (9.8ft),  Right: 0.0m,  Curb-To-Curb Width: 14.4m (47.2ft),  Out-to-Out Width: 18.7m (61.4ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 61.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: May 2021,  Underwater Inspection Date: October 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 40003,  Location: 0.6 MI SE OF S JCT TH 16 (Lat: 44.306531,  Lng: -93.958969),  Route carried "on" structure: County highway 45,  Year Built: 1984,  Status: Open,  Structure Length: 3.36m (11.02ft),  Average Daily Traffic: 1,700 (year 2013),  Average Future Daily Traffic: 1,700 (year 2039),  Design Load: HS 20,  Features Intersected: MN 22
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 31.9m (104.7ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 97.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 58.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 40004,  Location: 0.7 MI SE OF S JCT TH 16 (Lat: 44.305569,  Lng: -93.958069),  Route carried "on" structure: ,  Year Built: 1999,  Status: Open,  Structure Length: 3.31m (10.86ft),  Features Intersected: MN 22,  Facility Carried by Structure: RAILROAD
Lanes under structure: 3,  Owner: State Highway Agency,  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 30.5m (100.1ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Underclear: High priority of corrective action,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Designated Inspection Frequency: Every 12 months,  Inspection Date: April 2021,  Deck Structure Type: Other
Find on map >>   Show street view

Structure Number: 40005,  Location: 0.1 MILE SE OF JCT 169 (Lat: 44.312397,  Lng: -93.964142),  Route carried "on" structure: State highway 22,  Year Built: 2015,  Status: Open,  Structure Length: 3.22m (10.56ft),  Average Daily Traffic: 11,000 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 8,300 (year 2039),  Design Load: HL 93,  Features Intersected: MINNESOTA RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.2m (53.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 31.5m (103.3ft),  Curb-To-Curb Width: 16.2m (53.1ft),  Out-to-Out Width: 17.2m (56.4ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 55.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 37.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 4014,  Location: 4.4 MI NW OF ST PETER (Lat: 44.372397,  Lng: -94.003417),  Route carried "on" structure: State highway 22,  Year Built: 1923,  Status: Open,  Structure Length: 0.69m (2.26ft),  Average Daily Traffic: 900 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 980 (year 2039),  Features Intersected: ROBARTS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 39.2 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons,  Inventory Rating: 26.1 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.34m (1.12ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $97,000,000,  Roadway Improvement Cost: $6,000,000,  Total Project Cost: $102,000,000
Find on map >>   Show street view

Structure Number: 493,  Location: IN ST PETER (Lat: 44.324786,  Lng: -93.953139),  Route carried "on" structure: State highway 99,  Year Built: 1931,  Status: Open,  Structure Length: 12.26m (40.22ft),  Average Daily Traffic: 6,200 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 6,700 (year 2039),  Design Load: H 15,  Features Intersected: MINNESOTA RIVER
Minimum Vertical Clearance: 4.72m (15.49ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel continuous,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 59.8m (196.2ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 2.0m (6.6ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Very good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 35.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 26.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.75m (12.30ft),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: May 2021,  Critical Feature Inspection Date: August 2020,  Underwater Inspection Date: October 2020,  Bridge Improvement Cost: $999,999,000,  Roadway Improvement Cost: $86,000,000,  Total Project Cost: $999,999,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 52001,  Location: 3.0 MI N OF JCT TH 99 (Lat: 44.365642,  Lng: -93.963753),  Route carried "on" structure: US 169,  Year Built: 1965,  Status: Open,  Structure Length: 3.06m (10.04ft),  Average Daily Traffic: 8,200 (year 2017),  Truck Traffic: 17%,  Average Future Daily Traffic: 8,200 (year 2039),  Design Load: HS 20,  Features Intersected: ROBARTS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.4m (37.4ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.9m (35.8ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 46.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 35.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.13m (3.71ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $506,000,000,  Roadway Improvement Cost: $20,000,000,  Total Project Cost: $304,000,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete
Find on map >>   Show street view

Structure Number: 52013,  Location: 0.5 mi W of jct TH 169 (Lat: 44.311558,  Lng: -93.972619),  Route carried "on" structure: State highway 99,  Year Built: 2001,  Status: Open,  Structure Length: 3.90m (12.80ft),  Average Daily Traffic: 3,550 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 3,300 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: Washington Ave
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 37.2m (122.0ft),  Curb or Sidewalk Widths: Left: 3.0m (9.8ft),  Right: 0.0m,  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 17.8m (58.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 76.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 52018,  Location: 3.0 MI N OF JCT TH 99 (Lat: 44.365739,  Lng: -93.963456),  Route carried "on" structure: US 169,  Year Built: 2018,  Status: Open,  Structure Length: 3.43m (11.25ft),  Average Daily Traffic: 8,352 (year 2019),  Truck Traffic: 11%,  Average Future Daily Traffic: 8,200 (year 2039),  Design Load: HL 93,  Features Intersected: ROBARTS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.4m (44.0ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 82.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 50.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 52507,  Location: 1.0 MI N OF JCT CR 15 (Lat: 44.362428,  Lng: -94.029608),  Route carried "on" structure: County highway 19,  Year Built: 1999,  Status: Open,  Structure Length: 2.43m (7.97ft),  Average Daily Traffic: 105 (year 2015),  Average Future Daily Traffic: 105 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: ROBARTS CREEK (CD #78)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.8m (78.1ft),  Curb-To-Curb Width: 10.8m (35.4ft),  Out-to-Out Width: 11.8m (38.7ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 67.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 959,  Location: 0.6 MI S OF JCT TH 22 (Lat: 44.370817,  Lng: -94.019439),  Route carried "on" structure: County highway 213,  Year Built: 1985,  Status: Open,  Structure Length: 0.84m (2.76ft),  Average Daily Traffic: 57 (year 1971),  Average Future Daily Traffic: 57 (year 2029),  Design Load: HS 20,  Features Intersected: ROBARTS CREEK (CD # 78)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.5m (11.5ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 39.2 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 29.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020
Find on map >>   Show street view

Structure Number: 40003,  Location: 0.6 MI SE OF S JCT TH 16 (Lat: 44.306531,  Lng: -93.958969),  Route carried "under" structure: State highway 22,  Year Built: 1984,  Structure Length: 0. m,  Average Daily Traffic: 11,000 (year 2019),  Truck Traffic: 4%,  Features Intersected: MN 22,  Facility Carried by Structure: CSAH 45
Minimum Vertical Clearance: 4.94m (16.21ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 31.9m (104.7ft)

Find on map >>   Show street view

Structure Number: 40004,  Location: 0.7 MI SE OF S JCT TH 16 (Lat: 44.305569,  Lng: -93.958069),  Route carried "under" structure: State highway 22,  Year Built: 1999,  Structure Length: 0. m,  Average Daily Traffic: 11,000 (year 2019),  Truck Traffic: 4%,  Features Intersected: MN 22,  Facility Carried by Structure: RAILROAD
Minimum Vertical Clearance: 4.94m (16.21ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 30.5m (100.1ft)

Find on map >>   Show street view

Structure Number: 52013,  Location: 0.5 mi W of jct TH 169 (Lat: 44.311558,  Lng: -93.972619),  Route carried "under" structure: City street 102,  Year Built: 2001,  Structure Length: 0. m,  Average Daily Traffic: 530 (year 2003),  Features Intersected: Washington Ave,  Facility Carried by Structure: MN 99
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 37.2m (122.0ft)

Discuss St. Peter, Minnesota (MN) on our hugely popular Minnesota forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.