Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Tice, Florida (FL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 10Number of bridges
  • 98ft / 29.5mTotal length
  • 254,830Total average daily traffic
  • 36,255Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Tice
  • No street view available for this location

New bridges in Tice, FL - historical statistics
  • New bridges - historical statistics
  • 91970-1979
  • 11990-1999
Average Bridge Daily Traffic in Tice, FL
Average Bridge Truck Traffic in Tice, FL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 85.7%Good
  • 14.3%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 85.7%Good
  • 14.3%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 75.0%Good
  • 25.0%Satisfactory
Find on map >>   Show street view

Structure Number: 120092,  Location: 0.9 MI. South of SR-80 (Lat: 26.670833,  Lng: -81.799639),  Route carried "on" structure: City street ,  Year Built: 1977,  Status: Open,  Structure Length: 8.05m (26.41ft),  Average Daily Traffic: 4,100 (year 2021),  Truck Traffic: 13%,  Average Future Daily Traffic: 7,114 (year 2041),  Design Load: HS 20,  Features Intersected: I-75 (SR-93),  Facility Carried by Structure: TICE STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.255,  Lanes on structure: 2,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 30.8m (101.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 120093,  Location: 2.2 Mi. S of SR-78 (Lat: 26.684036,  Lng: -81.798858),  Route carried "on" structure: Interstate 75,  Year Built: 1978,  Year Reconstructed: 2013,  Status: Open,  Structure Length: 7.62m (25.00ft),  Average Daily Traffic: 35,000 (year 2021),  Truck Traffic: 17%,  Average Future Daily Traffic: 43,750 (year 2041),  Design Load: HS 20,  Features Intersected: SR-80 (PALM BCH BLVD)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 41.791,  Lanes on structure: 3,  Lanes under structure: 11,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.0m (55.8ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 38.1m (125.0ft),  Curb-To-Curb Width: 17.0m (55.8ft),  Out-to-Out Width: 18.0m (59.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 67.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 120094,  Location: 2.2 Mi. S of SR-78 (Lat: 26.684167,  Lng: -81.798556),  Route carried "on" structure: Interstate 75,  Year Built: 1978,  Year Reconstructed: 2013,  Status: Open,  Structure Length: 7.65m (25.10ft),  Average Daily Traffic: 35,000 (year 2021),  Truck Traffic: 17%,  Average Future Daily Traffic: 43,750 (year 2041),  Design Load: HS 20,  Features Intersected: SR 80 (PALM BCH BLVD)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 41.812,  Lanes on structure: 3,  Lanes under structure: 11,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 37.9m (124.3ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 18.0m (59.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 67.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 124081,  Location: 0.7 MI SOUTH OF SR-80 (Lat: 26.665192,  Lng: -81.812306),  Route carried "on" structure: County highway ,  Year Built: 1993,  Status: Open,  Structure Length: 0.95m (3.12ft),  Average Daily Traffic: 8,600 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 9,030 (year 2041),  Design Load: HS 20,  Features Intersected: BILLYS CREEK,  Facility Carried by Structure: ORTIZ AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.634,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.4m (37.4ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.5m (31.2ft),  Curb-To-Curb Width: 11.4m (37.4ft),  Out-to-Out Width: 12.4m (40.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 62.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 125003,  Location: 0.2MI S OF SR-80 (Lat: 26.654269,  Lng: -81.840433),  Route carried "on" structure: City street ,  Year Built: 1970,  Status: Posted for load,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 14,400 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 18,800 (year 2041),  Features Intersected: BILLY CREEK,  Facility Carried by Structure: VERONICA SHOEMAKER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.645,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.1m (26.6ft),  Material/Design: Prestressed concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 9.1m (29.9ft),  Curb or Sidewalk Widths: Left: 1.0m (3.3ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 9.7m (31.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 34.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 14.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: October 2021,  Other Special Inspection Date: October 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 125004,  Location: 0.4 MILE SOUTH OF SR 80 (Lat: 26.658333,  Lng: -81.828333),  Route carried "on" structure: County highway ,  Year Built: 1970,  Status: Open,  Structure Length: 1.89m (6.20ft),  Average Daily Traffic: 3,500 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 3,675 (year 2041),  Features Intersected: BILLY'S CREEK,  Facility Carried by Structure: MARSH AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.191,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.0m (26.2ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 9.4m (30.8ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.3m (4.3ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 66.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 125005,  Location: 0.5 MI N of BALLARD ROAD (Lat: 26.663239,  Lng: -81.818383),  Route carried "on" structure: County highway ,  Year Built: 1970,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 3,230 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 4,040 (year 2041),  Features Intersected: BILLY'S CREEK,  Facility Carried by Structure: NUNA AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.233,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.0m (26.2ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 7.6m (24.9ft),  Curb or Sidewalk Widths: Left: 1.1m (3.6ft),  Right: 1.1m (3.6ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Channel: Good,  Operating Rating: 47.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 120092,  Location: 0.9 MI. South of SR-80 (Lat: 26.670833,  Lng: -81.799639),  Route carried "under" structure: Interstate 75,  Year Built: 1977,  Structure Length: 0. m,  Average Daily Traffic: 84,000 (year 2021),  Truck Traffic: 17%,  Features Intersected: I-75 (SR-93),  Facility Carried by Structure: TICE STREET
Minimum Vertical Clearance: 4.88m (16.01ft),  Kilometerpoint: 40.444,  Lanes on structure: 2,  Lanes under structure: 8,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.8m (101.0ft)

Find on map >>   Show street view

Structure Number: 120093,  Location: 2.2 Mi. S of SR-78 (Lat: 26.684036,  Lng: -81.798858),  Route carried "under" structure: State highway 80,  Year Built: 1978,  Structure Length: 0. m,  Average Daily Traffic: 33,500 (year 2021),  Truck Traffic: 9%,  Features Intersected: SR-80 (PALM BCH BLVD),  Facility Carried by Structure: I-75 SB (SR-93)
Minimum Vertical Clearance: 4.88m (16.01ft),  Kilometerpoint: 8.919,  Lanes on structure: 3,  Lanes under structure: 11,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 38.1m (125.0ft)

Find on map >>   Show street view

Structure Number: 120094,  Location: 2.2 Mi. S of SR-78 (Lat: 26.684167,  Lng: -81.798556),  Route carried "under" structure: State highway 80,  Year Built: 1978,  Structure Length: 0. m,  Average Daily Traffic: 33,500 (year 2021),  Truck Traffic: 12%,  Features Intersected: SR 80 (PALM BCH BLVD),  Facility Carried by Structure: I-75 NB (SR-93)
Minimum Vertical Clearance: 4.88m (16.01ft),  Kilometerpoint: 8.961,  Lanes on structure: 3,  Lanes under structure: 11,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 37.9m (124.3ft)

Discuss Tice, Florida (FL) on our hugely popular Florida forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.