Bridge Statistics for Unadilla, Georgia (GA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 28Number of bridges
  • 230ft / 70.5mTotal length
  • $16,714,000Total costs
  • 341,910Total average daily traffic
  • 4,064Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Unadilla
  • No street view available for this location

New bridges in Unadilla, GA - historical statistics
  • New bridges - historical statistics
  • 21920-1929
  • 21950-1959
  • 101960-1969
  • 11970-1979
  • 31980-1989
  • 31990-1999
  • 22000-2009
Reconstructed bridges in Unadilla, GA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21950-1959
  • 01960-1969
  • 11970-1979
  • 41980-1989
  • 21990-1999
Average Bridge Daily Traffic in Unadilla, GA
Average Bridge Truck Traffic in Unadilla, GA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 78.6%Good
  • 21.4%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 7.1%Very good
  • 92.9%Good
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 7.1%Very good
  • 92.9%Good
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 17.6%Very good
  • 41.2%Good
  • 29.4%Satisfactory
  • 5.9%Fair
  • 5.9%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 66.7%Good
  • 33.3%Satisfactory
Find on map >>   Show street view

Structure Number: 930004,  Location: IN N UNADILLA (Lat: 32.272708,  Lng: -83.738428),  Route carried "on" structure: US 41,  Year Built: 1928,  Year Reconstructed: 1959,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 1,670 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,505 (year 2032),  Design Load: H 15,  Features Intersected: CAMP CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 30.578,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Satisfactory,  Operating Rating: 62.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: July 2021,  Underwater Inspection Date: April 2021,  Bridge Improvement Cost: $125,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $188,000
Find on map >>   Show street view

Structure Number: 930028,  Location: UNADILLA-WESTSIDE (Lat: 32.260539,  Lng: -83.749600),  Route carried "on" structure: State highway 230,  Year Built: 1961,  Status: Open,  Structure Length: 6.77m (22.21ft),  Average Daily Traffic: 2,260 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,390 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: I-75 @121.52 (EXIT 122)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 33.796,  Lanes on structure: 2,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 22.9m (75.1ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.3m (33.8ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 30.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 18.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $867,000,  Roadway Improvement Cost: $87,000,  Total Project Cost: $1,301,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 930035,  Location: 3 MI S OF UNADILLA (Lat: 32.218297,  Lng: -83.744681),  Route carried "on" structure: Interstate 75,  Year Built: 1961,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 41,370 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 62,055 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: SOUTH PRONG CREEK TRIB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 189.903,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 34.1m (111.9ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $212,000,  Roadway Improvement Cost: $21,000,  Total Project Cost: $319,000
Find on map >>   Show street view

Structure Number: 930037,  Location: UNADILLA-SOUTHSIDE (Lat: 32.244856,  Lng: -83.741886),  Route carried "on" structure: Interstate 75,  Year Built: 1961,  Year Reconstructed: 1994,  Status: Open,  Structure Length: 6.04m (19.82ft),  Average Daily Traffic: 41,370 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 62,055 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: NFS RAILROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 193.121,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 34.1m (111.9ft),  Skew: 34 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 20.1m (65.9ft),  Curb-To-Curb Width: 42.1m (138.1ft),  Out-to-Out Width: 43.9m (144.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 32.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $1,618,000,  Roadway Improvement Cost: $162,000,  Total Project Cost: $2,426,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 930039,  Location: UNADILLA-SOUTHSIDE (Lat: 32.247333,  Lng: -83.743353),  Route carried "on" structure: Interstate 75,  Year Built: 1961,  Year Reconstructed: 1994,  Status: Open,  Structure Length: 3.87m (12.70ft),  Average Daily Traffic: 41,370 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 62,055 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: SR 7 (US 41) EXIT 120
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 194.731,  Lanes on structure: 6,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 34.1m (111.9ft),  Skew: 33 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 51.7m (169.6ft),  Out-to-Out Width: 53.5m (175.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 31.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $1,038,000,  Roadway Improvement Cost: $104,000,  Total Project Cost: $1,556,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 930041,  Location: 0.6 MILES N. OF UNADILL (Lat: 32.268931,  Lng: -83.752231),  Route carried "on" structure: Interstate 75,  Year Built: 1961,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 41,750 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 62,625 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: CAMP CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 196.340,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 34.1m (111.9ft),  Skew: 11 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.7m (8.9ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: July 2021,  Underwater Inspection Date: April 2021,  Bridge Improvement Cost: $245,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $368,000
Find on map >>   Show street view

Structure Number: 930042,  Location: 3.5 MI NW OF UNADILLA (Lat: 32.290328,  Lng: -83.758958),  Route carried "on" structure: County highway 440,  Year Built: 1961,  Status: Open,  Structure Length: 6.49m (21.29ft),  Average Daily Traffic: 490 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 735 (year 2032),  Design Load: H 15,  Features Intersected: I-75 @ 123.76,  Facility Carried by Structure: COUNTY LINE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.437,  Lanes on structure: 2,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 21.9m (71.9ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 28.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 16.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $832,000,  Roadway Improvement Cost: $83,000,  Total Project Cost: $1,248,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 930051,  Location: 2.7 MI S OF UNADILLA (Lat: 32.226556,  Lng: -83.714242),  Route carried "on" structure: County highway 1585,  Year Built: 1977,  Status: Posted for load,  Structure Length: 2.44m (8.01ft),  Average Daily Traffic: 160 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 240 (year 2032),  Design Load: H 15,  Features Intersected: SOUTH PRONG CREEK,  Facility Carried by Structure: THIRD DISTRICT ROA
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.875,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 25.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 17.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 8.90m (29.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $313,000,  Roadway Improvement Cost: $31,000,  Total Project Cost: $469,000,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 930054,  Location: 2.8 MI E OF UNADILLA (Lat: 32.260028,  Lng: -83.687189),  Route carried "on" structure: State highway 230,  Year Built: 1989,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 540 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 810 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: CAMP CREEK TRIB.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 40.234,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Inventory Rating: 68.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $121,000,  Roadway Improvement Cost: $12,000,  Total Project Cost: $182,000
Find on map >>   Show street view

Structure Number: 935031,  Location: 1.2 MI N OF PINEHURST (Lat: 32.218219,  Lng: -83.744228),  Route carried "on" structure: County highway 281,  Year Built: 1965,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 490 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 735 (year 2032),  Design Load: H 15,  Features Intersected: SOUTH PRONG CR TRIB,  Facility Carried by Structure: ARENA ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Poor,  Culverts: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $102,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $152,000
Find on map >>   Show street view

Structure Number: 935032,  Location: CITY LIMITS OF UNADILLA (Lat: 32.269658,  Lng: -83.731819),  Route carried "on" structure: County highway 281,  Year Built: 1983,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 490 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 735 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: CAMP CREEK,  Facility Carried by Structure: EAST RAILROAD ST.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.047,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.7m (8.9ft)

Condition: Channel: Very good,  Culverts: Satisfactory,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: June 2021,  Underwater Inspection Date: April 2021,  Bridge Improvement Cost: $113,000,  Roadway Improvement Cost: $11,000,  Total Project Cost: $170,000
Find on map >>   Show street view

Structure Number: 935033,  Location: 3 MI E OF UNADILLA (Lat: 32.278558,  Lng: -83.664039),  Route carried "on" structure: County highway 283,  Year Built: 1950,  Status: Posted for load,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 50 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 75 (year 2032),  Features Intersected: CAMP CREEK,  Facility Carried by Structure: ST. JOHNS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.9m (16.1ft),  Curb-To-Curb Width: 6.2m (20.3ft),  Out-to-Out Width: 6.5m (21.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 25.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 15.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 41.70m (136.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $188,000,  Roadway Improvement Cost: $19,000,  Total Project Cost: $281,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 935034,  Location: 2.2 MI SE OF UNADILLA (Lat: 32.227978,  Lng: -83.684969),  Route carried "on" structure: County highway 286,  Year Built: 1965,  Year Reconstructed: 2002,  Status: Open,  Structure Length: 2.44m (8.01ft),  Average Daily Traffic: 490 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 735 (year 2032),  Design Load: H 15,  Features Intersected: SOUTH PRONG CREEK,  Facility Carried by Structure: FIVE POINTS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 45.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 42.70m (140.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $313,000,  Roadway Improvement Cost: $31,000,  Total Project Cost: $469,000,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 935045,  Location: 2.7 MI E OF UNADILLA (Lat: 32.277428,  Lng: -83.672489),  Route carried "on" structure: County highway 291,  Year Built: 2001,  Status: Posted for load,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 490 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 735 (year 2032),  Features Intersected: CAMP CREEK,  Facility Carried by Structure: FIVE POINTS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.828,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 31.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 7.96m (26.12ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $195,000,  Roadway Improvement Cost: $20,000,  Total Project Cost: $293,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1530002,  Location: 9.5 MI S OF PERRY (Lat: 32.318886,  Lng: -83.775872),  Route carried "on" structure: US 41,  Year Built: 1927,  Year Reconstructed: 1958,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 630 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 945 (year 2032),  Design Load: H 15,  Features Intersected: BIG CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $125,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $188,000
Find on map >>   Show street view

Structure Number: 1530042,  Location: 4 MI SW OF EKLO (Lat: 32.302239,  Lng: -83.761858),  Route carried "on" structure: Interstate 75,  Year Built: 1963,  Year Reconstructed: 1996,  Status: Open,  Structure Length: 6.55m (21.49ft),  Average Daily Traffic: 41,750 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 62,625 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: SR 7 (US 41)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 199.559,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.7m (58.1ft),  Skew: 16 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 29.0m (95.1ft),  Curb-To-Curb Width: 17.7m (58.1ft),  Out-to-Out Width: 20.5m (67.3ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 58.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 13.01m (42.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $1,069,000,  Roadway Improvement Cost: $107,000,  Total Project Cost: $1,604,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1530043,  Location: 9.5 MI S OF PERRY (Lat: 32.320667,  Lng: -83.764797),  Route carried "on" structure: Interstate 75,  Year Built: 1963,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 41,750 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 62,625 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: BIG CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 202.777,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 35.4m (116.1ft),  Skew: 14 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $490,000,  Roadway Improvement Cost: $49,000,  Total Project Cost: $735,000
Find on map >>   Show street view

Structure Number: 1535009,  Location: 2.5 MI SW OF ELKO (Lat: 32.305392,  Lng: -83.745808),  Route carried "on" structure: County highway 226,  Year Built: 1985,  Status: Posted for load,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 20 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 30 (year 2032),  Features Intersected: BIG CREEK,  Facility Carried by Structure: HENDERSON SPRGS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.828,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 4.6m (15.1ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.8m (51.8ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 21.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 12.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 41.82m (137.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $203,000,  Roadway Improvement Cost: $20,000,  Total Project Cost: $305,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1535013,  Location: 1 MI E OF ELKO (Lat: 32.330839,  Lng: -83.685569),  Route carried "on" structure: County highway 242,  Year Built: 1955,  Year Reconstructed: 1984,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 490 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 735 (year 2032),  Design Load: H 15,  Features Intersected: BURNHAM BRANCH,  Facility Carried by Structure: ELLIS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.437,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $82,000,  Roadway Improvement Cost: $8,000,  Total Project Cost: $123,000
Find on map >>   Show street view

Structure Number: 1535027,  Location: I MI SW OF ELKO (Lat: 32.325144,  Lng: -83.725508),  Route carried "on" structure: State highway 26,  Year Built: 1996,  Status: Open,  Structure Length: 8.53m (27.99ft),  Average Daily Traffic: 1,480 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,220 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: ELKO CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.265,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 11.5m (37.7ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 60.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $1,094,000,  Roadway Improvement Cost: $109,000,  Total Project Cost: $1,641,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1535028,  Location: 1 MI S OF ELKO (Lat: 32.321269,  Lng: -83.711439),  Route carried "on" structure: State highway 26,  Year Built: 1996,  Status: Open,  Structure Length: 5.49m (18.01ft),  Average Daily Traffic: 850 (year 2012),  Truck Traffic: 36%,  Average Future Daily Traffic: 1,275 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: NS RAILROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.875,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.6m (61.0ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $703,000,  Roadway Improvement Cost: $70,000,  Total Project Cost: $1,055,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1535029,  Location: 3.9 MI SE OF ELKO (Lat: 32.315789,  Lng: -83.664319),  Route carried "on" structure: State highway 26,  Year Built: 1996,  Status: Open,  Structure Length: 4.88m (16.01ft),  Average Daily Traffic: 850 (year 2012),  Truck Traffic: 36%,  Average Future Daily Traffic: 1,275 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: BURNHAM BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.703,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 60.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $625,000,  Roadway Improvement Cost: $63,000,  Total Project Cost: $938,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1535042,  Location: 1.5 MILES S. OF ELKO (Lat: 32.311578,  Lng: -83.723569),  Route carried "on" structure: County highway 676,  Year Built: 2009,  Status: Open,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 570 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 855 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: BIG CREEK,  Facility Carried by Structure: ELKO ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 72.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 9.63m (31.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $469,000,  Roadway Improvement Cost: $47,000,  Total Project Cost: $703,000,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 930028,  Location: UNADILLA-WESTSIDE (Lat: 32.260539,  Lng: -83.749600),  Route carried "under" structure: Interstate 75,  Structure Length: 0. m,  Average Daily Traffic: 37,400 (year 2010),  Truck Traffic: 1%,  Features Intersected: SR 230,  Facility Carried by Structure: SR 230
Minimum Vertical Clearance: 5.20m (17.06ft),  Kilometerpoint: 196.340,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 930039,  Location: UNADILLA-SOUTHSIDE (Lat: 32.247333,  Lng: -83.743353),  Route carried "under" structure: US 41,  Structure Length: 0. m,  Average Daily Traffic: 4,130 (year 2010),  Truck Traffic: 1%,  Features Intersected: I-75 NBL (EXIT 120),  Facility Carried by Structure: I-75
Minimum Vertical Clearance: 4.92m (16.14ft),  Kilometerpoint: 27.359,  Lanes on structure: 6,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 930042,  Location: 3.5 MI NW OF UNADILLA (Lat: 32.290328,  Lng: -83.758958),  Route carried "under" structure: Interstate 75,  Structure Length: 0. m,  Average Daily Traffic: 37,400 (year 2010),  Truck Traffic: 1%,  Features Intersected: CR 440 COUNTY LINE ROAD,  Facility Carried by Structure: COUNTY LINE ROAD
Minimum Vertical Clearance: 5.35m (17.55ft),  Kilometerpoint: 199.559,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 1530041,  Location: 4 MI SW OF ELKO (Lat: 32.301747,  Lng: -83.761519),  Route carried "under" structure: US 41,  Structure Length: 0. m,  Average Daily Traffic: 800 (year 2010),  Truck Traffic: 5%,  Features Intersected: I-75 NBL,  Facility Carried by Structure: I-75 NBL
Minimum Vertical Clearance: 4.95m (16.24ft),  Kilometerpoint: 1.609,  Lanes on structure: 3,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 1530042,  Location: 4 MI SW OF EKLO (Lat: 32.302239,  Lng: -83.761858),  Route carried "under" structure: US 41,  Structure Length: 0. m,  Average Daily Traffic: 800 (year 2010),  Truck Traffic: 5%,  Features Intersected: I-75 SBL,  Facility Carried by Structure: I-75 SBL
Minimum Vertical Clearance: 5.15m (16.90ft),  Kilometerpoint: 1.609,  Lanes on structure: 3,  Length of Maximum Span: 0.0m

Discuss Unadilla, Georgia (GA) on our hugely popular Georgia forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.