Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Valley Grande, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 33Number of bridges
  • 384ft / 117mTotal length
  • $40,939,000Total costs
  • 94,630Total average daily traffic
  • 12,450Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Valley Grande
  • No street view available for this location

New bridges in Valley Grande, AL - historical statistics
  • New bridges - historical statistics
  • 51930-1939
  • 41940-1949
  • 21950-1959
  • 81960-1969
  • 41970-1979
  • 51980-1989
  • 41990-1999
  • 12010-2019
Reconstructed bridges in Valley Grande, AL - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 51970-1979
  • 01980-1989
  • 11990-1999
Average Bridge Daily Traffic in Valley Grande, AL
Average Bridge Truck Traffic in Valley Grande, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 28.6%Good
  • 35.7%Satisfactory
  • 35.7%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 7.1%Very good
  • 28.6%Good
  • 50.0%Satisfactory
  • 14.3%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 7.1%Very good
  • 42.9%Good
  • 35.7%Satisfactory
  • 7.1%Fair
  • 7.1%Serious
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 3.1%Very good
  • 34.4%Good
  • 46.9%Satisfactory
  • 12.5%Fair
  • 3.1%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 5.6%Excellent
  • 33.3%Good
  • 50.0%Satisfactory
  • 11.1%Fair
Find on map >>   Show street view

Structure Number: 3043,  Location: 0.4 MI.E.OF PERRY CO.LINE (Lat: 32.484533,  Lng: -87.133683),  Route carried "on" structure: State highway 14,  Year Built: 1947,  Status: Open,  Structure Length: 4.15m (13.62ft),  Average Daily Traffic: 1,050 (year 2013),  Truck Traffic: 9%,  Average Future Daily Traffic: 1,414 (year 2033),  Design Load: H 15,  Features Intersected: OAK MULGEE CREEK RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 174.685,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 55.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 5.12m (16.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $983,000,  Roadway Improvement Cost: $98,000,  Total Project Cost: $1,081,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 3044,  Location: 0.7 MI.E.OF PERRY CO.LINE (Lat: 32.480189,  Lng: -87.126633),  Route carried "on" structure: State highway 14,  Year Built: 1947,  Status: Open,  Structure Length: 27.04m (88.71ft),  Average Daily Traffic: 1,050 (year 2013),  Truck Traffic: 9%,  Average Future Daily Traffic: 1,414 (year 2033),  Design Load: H 15,  Features Intersected: OAK MULGEE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 175.269,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 25,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 39.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 27.04m (88.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $5,191,000,  Roadway Improvement Cost: $519,000,  Total Project Cost: $5,710,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 3046,  Location: 0.6 MI.E.JCT.AL.219 (Lat: 32.450000,  Lng: -87.076667),  Route carried "on" structure: State highway 14,  Year Built: 1947,  Status: Open,  Structure Length: 4.15m (13.62ft),  Average Daily Traffic: 3,210 (year 2013),  Truck Traffic: 8%,  Average Future Daily Traffic: 4,323 (year 2033),  Design Load: H 15,  Features Intersected: CHILDERS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 181.413,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 43.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 5.12m (16.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $983,000,  Roadway Improvement Cost: $98,000,  Total Project Cost: $1,081,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 3748,  Location: 1.4 MI N US 80 W (Lat: 32.451111,  Lng: -87.034400),  Route carried "on" structure: County highway 37,  Year Built: 1949,  Status: Posted for load,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 2,200 (year 2013),  Truck Traffic: 3%,  Average Future Daily Traffic: 2,800 (year 2040),  Design Load: H 15,  Features Intersected: VALLEY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 34.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: November 2021,  Other Special Inspection Date: November 2021,  Bridge Improvement Cost: $788,000,  Roadway Improvement Cost: $79,000,  Total Project Cost: $867,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 5553,  Location: 1.04 MI S CR 39 INT. (Lat: 32.557544,  Lng: -86.997931),  Route carried "on" structure: County highway 37,  Year Built: 1956,  Status: Open,  Structure Length: 1.00m (3.28ft),  Average Daily Traffic: 300 (year 2010),  Truck Traffic: 5%,  Average Future Daily Traffic: 400 (year 2040),  Design Load: H 15,  Features Intersected: MARTIN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.7m (8.9ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 43.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.67m (5.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $405,000,  Roadway Improvement Cost: $41,000,  Total Project Cost: $446,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 7802,  Location: 4.8 MI.N.OF AL 14 (Lat: 32.532128,  Lng: -87.088219),  Route carried "on" structure: State highway 219,  Year Built: 1962,  Status: Open,  Structure Length: 10.36m (33.99ft),  Average Daily Traffic: 1,150 (year 2013),  Truck Traffic: 9%,  Average Future Daily Traffic: 1,384 (year 2033),  Design Load: H 15,  Features Intersected: OAKMULGEE CREEK RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.950,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 10,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 41.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 11.28m (37.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $2,010,000,  Roadway Improvement Cost: $201,000,  Total Project Cost: $2,211,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 7803,  Location: DALLAS-PERRY CO LINE (Lat: 32.534497,  Lng: -87.089064),  Route carried "on" structure: State highway 219,  Year Built: 1962,  Status: Open,  Structure Length: 9.08m (29.79ft),  Average Daily Traffic: 1,150 (year 2013),  Truck Traffic: 9%,  Average Future Daily Traffic: 1,384 (year 2033),  Design Load: H 15,  Features Intersected: OAKMULGEE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.181,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 4,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 37.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 10.05m (32.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $1,791,000,  Roadway Improvement Cost: $179,000,  Total Project Cost: $1,970,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 8332,  Location: 1.1 MI W SR 22 N (Lat: 32.574958,  Lng: -86.984733),  Route carried "on" structure: County highway 39,  Year Built: 1964,  Status: Open,  Structure Length: 1.95m (6.40ft),  Average Daily Traffic: 125 (year 2012),  Truck Traffic: 5%,  Average Future Daily Traffic: 300 (year 2037),  Design Load: H 15,  Features Intersected: VALLEY CREEK,  Facility Carried by Structure: CR # 222
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.69m (8.83ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $653,000,  Roadway Improvement Cost: $65,000,  Total Project Cost: $718,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 8333,  Location: 0.2 MI W SR 22 N (Lat: 32.579853,  Lng: -86.971469),  Route carried "on" structure: County highway 39,  Year Built: 1964,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 125 (year 2012),  Truck Traffic: 5%,  Average Future Daily Traffic: 350 (year 2037),  Design Load: H 15,  Features Intersected: TRIB TO VALLEY CREEK,  Facility Carried by Structure: CR # 222
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.5m (21.3ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 80.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.83m (6.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $381,000,  Roadway Improvement Cost: $38,000,  Total Project Cost: $419,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 8741,  Location: 9.8MI.W.CHILTONCO. LINE (Lat: 32.580500,  Lng: -86.982000),  Route carried "on" structure: State highway 22,  Year Built: 1965,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 2,690 (year 2013),  Truck Traffic: 17%,  Average Future Daily Traffic: 3,263 (year 2033),  Design Load: HS 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 52.603,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.65m (5.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $1,623,000,  Roadway Improvement Cost: $162,000,  Total Project Cost: $1,785,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 9083,  Location: 6.5MI.W.CHILTONCO. LINE (Lat: 32.578889,  Lng: -86.967778),  Route carried "on" structure: State highway 22,  Year Built: 1966,  Status: Open,  Structure Length: 2.26m (7.41ft),  Average Daily Traffic: 2,690 (year 2013),  Truck Traffic: 17%,  Average Future Daily Traffic: 3,263 (year 2033),  Design Load: HS 20,  Features Intersected: VALLEY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 57.927,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Poor,  Culverts: Satisfactory,  Operating Rating: 70.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.08m (10.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $1,120,000,  Roadway Improvement Cost: $112,000,  Total Project Cost: $1,232,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 9612,  Location: 2 2M EAST AL#14 ON CORT#6 (Lat: 32.531667,  Lng: -87.128333),  Route carried "on" structure: County highway 6,  Year Built: 1968,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 305 (year 1993),  Truck Traffic: 5%,  Average Future Daily Traffic: 330 (year 2032),  Features Intersected: POSSUM CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 64.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.74m (5.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $402,000,  Roadway Improvement Cost: $40,000,  Total Project Cost: $442,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 10373,  Location: 0.25 MI W SR 22 N (Lat: 32.453075,  Lng: -87.019022),  Route carried "on" structure: County highway 65,  Year Built: 1960,  Status: Open,  Structure Length: 8.15m (26.74ft),  Average Daily Traffic: 1,375 (year 2009),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,800 (year 2040),  Design Load: H 15,  Features Intersected: VALLEY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 4,  Length of Maximum Span: 15.2m (49.9ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.1m (23.3ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 41.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 9.15m (30.02ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $1,443,000,  Roadway Improvement Cost: $144,000,  Total Project Cost: $1,587,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10394,  Location: 0.34 MI E CR 81 (Lat: 32.494525,  Lng: -86.971147),  Route carried "on" structure: County highway 86,  Year Built: 1970,  Status: Open,  Structure Length: 0.66m (2.17ft),  Average Daily Traffic: 150 (year 2012),  Truck Traffic: 4%,  Average Future Daily Traffic: 200 (year 2040),  Design Load: H 20,  Features Intersected: TRIB TO BEECH CK SWAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 56.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.28m (4.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $311,000,  Roadway Improvement Cost: $31,000,  Total Project Cost: $342,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 10395,  Location: 1.6 MI E CR 81 (Lat: 32.498567,  Lng: -86.954794),  Route carried "on" structure: County highway 86,  Year Built: 1970,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 75 (year 2012),  Truck Traffic: 4%,  Average Future Daily Traffic: 100 (year 2040),  Design Load: H 20,  Features Intersected: BRANCH TO BLUE GURTH SWP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 7.1m (23.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 46.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $625,000,  Roadway Improvement Cost: $63,000,  Total Project Cost: $688,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 11623,  Location: 2.1 MI W SR 22 N (Lat: 32.505136,  Lng: -87.023433),  Route carried "on" structure: County highway 16,  Year Built: 1976,  Status: Open,  Structure Length: 1.30m (4.27ft),  Average Daily Traffic: 500 (year 2012),  Truck Traffic: 5%,  Average Future Daily Traffic: 700 (year 2040),  Design Load: H 15,  Features Intersected: VALLEY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 64.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.98m (6.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $434,000,  Roadway Improvement Cost: $43,000,  Total Project Cost: $477,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 11803,  Location: 2.3 MI W SR 22 N (Lat: 32.505653,  Lng: -87.019428),  Route carried "on" structure: County highway 16,  Year Built: 1977,  Status: Posted for load,  Structure Length: 11.40m (37.40ft),  Average Daily Traffic: 1,800 (year 2011),  Truck Traffic: 5%,  Average Future Daily Traffic: 2,700 (year 2040),  Design Load: H 15,  Features Intersected: VALLEY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 11,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 31.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 18.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 12.27m (40.26ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: April 2020,  Other Special Inspection Date: April 2021,  Bridge Improvement Cost: $2,357,000,  Roadway Improvement Cost: $236,000,  Total Project Cost: $2,593,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 12654,  Location: 0.8 MI.W.OF AL 219 (Lat: 32.437067,  Lng: -87.099131),  Route carried "on" structure: US 80,  Year Built: 1933,  Year Reconstructed: 1982,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 6,750 (year 2013),  Truck Traffic: 21%,  Average Future Daily Traffic: 8,826 (year 2033),  Design Load: HS 20,  Features Intersected: CHILDERS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 127.104,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 24.4m (80.1ft),  Skew: 10 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 73.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.65m (5.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $1,805,000,  Roadway Improvement Cost: $181,000,  Total Project Cost: $1,986,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 12655,  Location: 0.6 MI.W.OF AL 219 (Lat: 32.436700,  Lng: -87.096342),  Route carried "on" structure: US 80,  Year Built: 1933,  Year Reconstructed: 1982,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 6,750 (year 2013),  Truck Traffic: 21%,  Average Future Daily Traffic: 8,826 (year 2033),  Design Load: HS 20,  Features Intersected: CHILDERS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 127.457,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 24.4m (80.1ft),  Skew: 10 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 65.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $1,516,000,  Roadway Improvement Cost: $152,000,  Total Project Cost: $1,668,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 12656,  Location: 0.6 MI.W.OF AL 219 (Lat: 32.436647,  Lng: -87.095897),  Route carried "on" structure: US 80,  Year Built: 1933,  Year Reconstructed: 1982,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 6,750 (year 2013),  Truck Traffic: 21%,  Average Future Daily Traffic: 8,826 (year 2033),  Design Load: HS 20,  Features Intersected: CHILDERS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 127.417,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 24.4m (80.1ft),  Skew: 10 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 64.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.65m (5.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $1,643,000,  Roadway Improvement Cost: $164,000,  Total Project Cost: $1,807,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 12657,  Location: 0.5 MI.W.OF AL 219 (Lat: 32.436608,  Lng: -87.094569),  Route carried "on" structure: US 80,  Year Built: 1933,  Year Reconstructed: 1982,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 6,750 (year 2013),  Truck Traffic: 21%,  Average Future Daily Traffic: 8,826 (year 2033),  Design Load: HS 20,  Features Intersected: CHILDERS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 127.550,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 24.4m (80.1ft),  Skew: 10 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 74.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $1,546,000,  Roadway Improvement Cost: $155,000,  Total Project Cost: $1,701,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 12758,  Location: 4.4 MI.W.OF AL 219 (Lat: 32.445000,  Lng: -87.156667),  Route carried "on" structure: US 80,  Year Built: 1982,  Status: Open,  Structure Length: 4.15m (13.62ft),  Average Daily Traffic: 2,895 (year 2013),  Truck Traffic: 23%,  Average Future Daily Traffic: 3,785 (year 2033),  Design Load: HS 20,  Features Intersected: CAHABA RIVER RELIEF NO.5
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 121.340,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 75.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 5.12m (16.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $1,474,000,  Roadway Improvement Cost: $147,000,  Total Project Cost: $1,621,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 12759,  Location: 4.3 MI.W.OF AL 219 (Lat: 32.445000,  Lng: -87.156667),  Route carried "on" structure: US 80,  Year Built: 1982,  Status: Open,  Structure Length: 4.15m (13.62ft),  Average Daily Traffic: 2,895 (year 2013),  Truck Traffic: 23%,  Average Future Daily Traffic: 3,785 (year 2033),  Design Load: HS 20,  Features Intersected: CAHABA RIVER RELIEF NO.6
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 121.481,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 75.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 5.12m (16.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $1,474,000,  Roadway Improvement Cost: $147,000,  Total Project Cost: $1,621,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1276,  Location: 2.8 MI.W.OF AL 219 (Lat: 32.439756,  Lng: -87.133986),  Route carried "on" structure: US 80,  Year Built: 1982,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 5,790 (year 2013),  Truck Traffic: 23%,  Average Future Daily Traffic: 7,571 (year 2033),  Design Load: HS 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 123.810,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 24.4m (80.1ft),  Skew: 14 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.81m (5.94ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $2,606,000,  Roadway Improvement Cost: $261,000,  Total Project Cost: $2,867,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 12935,  Location: 2 MI N CR 39 (Lat: 32.592486,  Lng: -87.050700),  Route carried "on" structure: County highway 282,  Year Built: 1983,  Status: Posted for load,  Structure Length: 3.96m (12.99ft),  Average Daily Traffic: 20 (year 2012),  Average Future Daily Traffic: 40 (year 2040),  Design Load: H 10,  Features Intersected: LITTLE OAKMULGEE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 9,  Length of Maximum Span: 4.6m (15.1ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 3.7m (12.1ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Serious,  Channel: Fair,  Operating Rating: 2.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 1.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 4.91m (16.11ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 3 months,  Inspection Date: May 2020,  Other Special Inspection Date: January 2022,  Bridge Improvement Cost: $539,000,  Roadway Improvement Cost: $54,000,  Total Project Cost: $593,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 13098,  Location: 0.8 MI E CR 37 (Lat: 32.479311,  Lng: -87.039078),  Route carried "on" structure: County highway 65,  Year Built: 1938,  Year Reconstructed: 1984,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 500 (year 2012),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,000 (year 2040),  Design Load: H 15,  Features Intersected: FOURMILE BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 6.1m (20.0ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 46.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.89m (6.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $337,000,  Roadway Improvement Cost: $34,000,  Total Project Cost: $371,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 15493,  Location: 0.73 MI W SR 22 (Lat: 32.484772,  Lng: -87.012247),  Route carried "on" structure: County highway 239,  Year Built: 1992,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 400 (year 2012),  Truck Traffic: 4%,  Average Future Daily Traffic: 500 (year 2040),  Design Load: HS 20,  Features Intersected: MOORE BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 62.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.68m (5.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $602,000,  Roadway Improvement Cost: $60,000,  Total Project Cost: $662,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 16034,  Location: 0.9 MI W DALLAS CO LINE (Lat: 32.497433,  Lng: -87.148333),  Route carried "on" structure: State highway 14,  Year Built: 1994,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 1,050 (year 2016),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,414 (year 2040),  Design Load: HS 20,  Features Intersected: POSSUM CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 172.723,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 12.1m (39.7ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 87.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.20m (7.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $547,000,  Roadway Improvement Cost: $55,000,  Total Project Cost: $602,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 16631,  Location: 2.8 MI N AL 14 (Lat: 32.504617,  Lng: -87.088883),  Route carried "on" structure: State highway 219,  Year Built: 1996,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 1,150 (year 2013),  Truck Traffic: 9%,  Average Future Daily Traffic: 1,384 (year 2033),  Design Load: HS 20,  Features Intersected: STREAM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.918,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 54.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.71m (5.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $435,000,  Roadway Improvement Cost: $44,000,  Total Project Cost: $479,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 16632,  Location: 3.7 MI N AL 14 (Lat: 32.511450,  Lng: -87.088867),  Route carried "on" structure: State highway 219,  Year Built: 1996,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 1,150 (year 2013),  Truck Traffic: 9%,  Average Future Daily Traffic: 1,384 (year 2033),  Design Load: HS 20,  Features Intersected: TATE BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.224,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 11.7m (38.4ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 54.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $330,000,  Roadway Improvement Cost: $33,000,  Total Project Cost: $363,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 18752,  Location: 0.15 MI S OF CR 222 (Lat: 32.576539,  Lng: -86.972781),  Route carried "on" structure: County highway 292,  Year Built: 1987,  Year Reconstructed: 2002,  Status: Open,  Structure Length: 2.28m (7.48ft),  Average Daily Traffic: 30 (year 2012),  Average Future Daily Traffic: 40 (year 2040),  Design Load: HS 20,  Features Intersected: TRIB TO VALLEY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.032,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 4.6m (15.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 5.8m (19.0ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 34.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 3.10m (10.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $425,000,  Roadway Improvement Cost: $43,000,  Total Project Cost: $468,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 21079,  Location: .5m N Dallas Co Line (Lat: 32.508000,  Lng: -87.107222),  Route carried "on" structure: County highway 211,  Year Built: 2017,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 55 (year 2016),  Truck Traffic: 13%,  Average Future Daily Traffic: 82 (year 2036),  Design Load: HS 20,  Features Intersected: Trib Oakmulgee Cr.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Navigation Control: Yes ( Vertical Clearance: 1.8m (5.9ft), Horizontal Clearance: 3.0m (9.8ft)),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Channel: Very good,  Culverts: Excellent,  Operating Rating: 62.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.89m (6.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $437,000,  Roadway Improvement Cost: $44,000,  Total Project Cost: $481,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5444,  Location: 0.8 M W JCT SR 2 & SR 3 (Lat: 34.790000,  Lng: -86.971667),  Route carried "under" structure: US 72,  Year Built: 1956,  Structure Length: 0. m,  Average Daily Traffic: 31,750 (year 2013),  Truck Traffic: 6%,  Features Intersected: SR 2,  Facility Carried by Structure: CSX Railroad
Minimum Vertical Clearance: 4.85m (15.91ft),  Kilometerpoint: 120.540,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 15.5m (50.9ft)

Discuss Valley Grande, Alabama (AL) on our hugely popular Alabama forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.