Bridge Statistics for Valley-Hi, Pennsylvania (PA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs
- National Bridge Inventory (NBI) Statistics
- 34Number of bridges
- 282ft / 85.9mTotal length
- $17,054,000Total costs
- 223,390Total average daily traffic
- 75,097Total average daily truck traffic
- National Bridge Inventory (NBI) Registered Bridges for Valley-Hi
- No street view available for this location
- New bridges - historical statistics
- 21920-1929
- 21930-1939
- 31940-1949
- 11950-1959
- 111960-1969
- 21970-1979
- 31990-1999
- 92000-2009
- 12010-2019
- Reconstructed bridges - Historical Statistics
- 11940-1949
- 01950-1959
- 01960-1969
- 01970-1979
- 31980-1989
- 31990-1999
- 12000-2009
- Bridge Condition - Deck
- 40.0%Good
- 20.0%Satisfactory
- 40.0%Fair
- Bridge Condition - Superstructure
- 33.3%Very good
- 13.3%Good
- 6.7%Satisfactory
- 46.7%Fair
- Bridge Condition - Substructure
- 6.7%Very good
- 20.0%Good
- 33.3%Satisfactory
- 40.0%Fair
- Bridge Condition - Channel
- 12.5%Very good
- 50.0%Satisfactory
- 25.0%Fair
- 12.5%Poor
- Bridge Condition - Culverts
- 66.7%Very good
- 33.3%Good
Find on map >> Show street view
Structure Number: 4024, Location: OVER PA TURNPIKE EXIT 161 (Lat: 39.990628, Lng: -78.242764), Route carried "on" structure: Interstate 70, Year Built: 1963, Year Reconstructed: 2004, Status: Open, Structure Length: 5.00m (16.40ft), Average Daily Traffic: 7,675 (year 2020), Truck Traffic: 37%, Average Future Daily Traffic: 10,117 (year 2032), Design Load: HS 20, Features Intersected: TURNPIKE EXIT 161 RAMPS
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.774, Lanes on structure: 2, Lanes under structure: 4, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 12.2m (40.0ft), Skew: 11 degrees, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Number Of Spans In Main Unit: 3, Length of Maximum Span: 25.6m (84.0ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 12.2m (40.0ft), Out-to-Out Width: 13.9m (45.6ft)
Condition: Deck: Fair, Superstructure: Fair, Substructure: Fair, Operating Rating: 83.5 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 30.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Better than present minimum criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 5.90m (19.36ft), Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2021, Bridge Improvement Cost: $147,000, Roadway Improvement Cost: $434,000, Total Project Cost: $1,989,000, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Latex Concrete, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 4024, Location: OVER PA TURNPIKE EXIT 161 (Lat: 39.990628, Lng: -78.242764), Route carried "on" structure: Interstate 70, Year Built: 1963, Year Reconstructed: 2004, Status: Open, Structure Length: 5.00m (16.40ft), Average Daily Traffic: 7,675 (year 2020), Truck Traffic: 37%, Average Future Daily Traffic: 10,117 (year 2032), Design Load: HS 20, Features Intersected: TURNPIKE EXIT 161 RAMPS
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.774, Lanes on structure: 2, Lanes under structure: 4, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 12.2m (40.0ft), Skew: 11 degrees, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Number Of Spans In Main Unit: 3, Length of Maximum Span: 25.6m (84.0ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 12.2m (40.0ft), Out-to-Out Width: 13.9m (45.6ft)
Condition: Deck: Fair, Superstructure: Fair, Substructure: Fair, Operating Rating: 83.5 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 30.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Better than present minimum criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 5.90m (19.36ft), Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2021, Bridge Improvement Cost: $147,000, Roadway Improvement Cost: $434,000, Total Project Cost: $1,989,000, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Latex Concrete, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 4026, Location: OVER PA TURNPIKE EXIT 161 (Lat: 39.990708, Lng: -78.241394), Route carried "on" structure: Interstate 70, Year Built: 1963, Year Reconstructed: 2004, Status: Open, Structure Length: 5.00m (16.40ft), Average Daily Traffic: 7,400 (year 2020), Truck Traffic: 42%, Average Future Daily Traffic: 9,738 (year 2032), Design Load: HS 20, Features Intersected: TURNPIKE EXIT 161 RAMPS
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.781, Lanes on structure: 2, Lanes under structure: 4, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 11.9m (39.0ft), Skew: 11 degrees, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Number Of Spans In Main Unit: 3, Length of Maximum Span: 25.6m (84.0ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 12.3m (40.4ft), Out-to-Out Width: 13.2m (43.3ft)
Condition: Deck: Fair, Superstructure: Good, Substructure: Fair, Operating Rating: 75.3 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 28.1 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Better than present minimum criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 6.20m (20.34ft), Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2021, Bridge Improvement Cost: $157,000, Roadway Improvement Cost: $461,000, Total Project Cost: $2,114,000, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Latex Concrete, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 4026, Location: OVER PA TURNPIKE EXIT 161 (Lat: 39.990708, Lng: -78.241394), Route carried "on" structure: Interstate 70, Year Built: 1963, Year Reconstructed: 2004, Status: Open, Structure Length: 5.00m (16.40ft), Average Daily Traffic: 7,400 (year 2020), Truck Traffic: 42%, Average Future Daily Traffic: 9,738 (year 2032), Design Load: HS 20, Features Intersected: TURNPIKE EXIT 161 RAMPS
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.781, Lanes on structure: 2, Lanes under structure: 4, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 11.9m (39.0ft), Skew: 11 degrees, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Number Of Spans In Main Unit: 3, Length of Maximum Span: 25.6m (84.0ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 12.3m (40.4ft), Out-to-Out Width: 13.2m (43.3ft)
Condition: Deck: Fair, Superstructure: Good, Substructure: Fair, Operating Rating: 75.3 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 28.1 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Better than present minimum criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 6.20m (20.34ft), Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2021, Bridge Improvement Cost: $157,000, Roadway Improvement Cost: $461,000, Total Project Cost: $2,114,000, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Latex Concrete, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 4453, Location: EB AT BREEZEWOOD INTG (Lat: 39.988333, Lng: -78.240000), Route carried "on" structure: Ramp Interstate 70, Year Built: 1940, Year Reconstructed: 1999, Status: Open, Structure Length: 3.14m (10.30ft), Average Daily Traffic: 8,598 (year 2008), Truck Traffic: 30%, Average Future Daily Traffic: 9,937 (year 2030), Design Load: HS 25 or greater, Features Intersected: SR 2029
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 2, Base Highway Network: Yes, Toll: On toll road, Owner: State Toll Authority, Approaching Roadway Width: 28.3m (92.8ft), Skew: 14 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 29.3m (96.1ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 28.6m (93.8ft), Out-to-Out Width: 29.6m (97.1ft)
Condition: Deck: Good, Superstructure: Very good, Substructure: Satisfactory, Inventory Rating: 71.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Superior to present desirable criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.60m (5.25ft), Designated Inspection Frequency: Every 48 months, Inspection Date: October 2018, Bridge Improvement Cost: $52,000, Roadway Improvement Cost: $154,000, Total Project Cost: $705,000, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Latex Concrete, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 4453, Location: EB AT BREEZEWOOD INTG (Lat: 39.988333, Lng: -78.240000), Route carried "on" structure: Ramp Interstate 70, Year Built: 1940, Year Reconstructed: 1999, Status: Open, Structure Length: 3.14m (10.30ft), Average Daily Traffic: 8,598 (year 2008), Truck Traffic: 30%, Average Future Daily Traffic: 9,937 (year 2030), Design Load: HS 25 or greater, Features Intersected: SR 2029
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 2, Base Highway Network: Yes, Toll: On toll road, Owner: State Toll Authority, Approaching Roadway Width: 28.3m (92.8ft), Skew: 14 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 29.3m (96.1ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 28.6m (93.8ft), Out-to-Out Width: 29.6m (97.1ft)
Condition: Deck: Good, Superstructure: Very good, Substructure: Satisfactory, Inventory Rating: 71.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Superior to present desirable criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.60m (5.25ft), Designated Inspection Frequency: Every 48 months, Inspection Date: October 2018, Bridge Improvement Cost: $52,000, Roadway Improvement Cost: $154,000, Total Project Cost: $705,000, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Latex Concrete, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 4454, Location: EAST OF BREEZEWOOD (Lat: 39.984564, Lng: -78.240419), Route carried "on" structure: Interstate 76, Year Built: 2003, Status: Open, Structure Length: 18.14m (59.51ft), Average Daily Traffic: 20,195 (year 1999), Truck Traffic: 36%, Average Future Daily Traffic: 20,447 (year 2030), Design Load: HL 93, Features Intersected: I-70 & SR 2035(LR 05021)
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 6, Base Highway Network: Yes, Toll: On toll road, Owner: State Toll Authority, Approaching Roadway Width: 17.4m (57.1ft), Skew: 11 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 50.3m (165.0ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 17.5m (57.4ft), Out-to-Out Width: 18.4m (60.4ft)
Condition: Deck: Satisfactory, Superstructure: Very good, Substructure: Good, Operating Rating: 64.4 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 39.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Superior to present desirable criteria, Underclear: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 20.10m (65.94ft), Designated Inspection Frequency: Every 48 months, Inspection Date: October 2018, Bridge Improvement Cost: $258,000, Roadway Improvement Cost: $761,000, Total Project Cost: $3,486,000, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 4454, Location: EAST OF BREEZEWOOD (Lat: 39.984564, Lng: -78.240419), Route carried "on" structure: Interstate 76, Year Built: 2003, Status: Open, Structure Length: 18.14m (59.51ft), Average Daily Traffic: 20,195 (year 1999), Truck Traffic: 36%, Average Future Daily Traffic: 20,447 (year 2030), Design Load: HL 93, Features Intersected: I-70 & SR 2035(LR 05021)
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 6, Base Highway Network: Yes, Toll: On toll road, Owner: State Toll Authority, Approaching Roadway Width: 17.4m (57.1ft), Skew: 11 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 50.3m (165.0ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 17.5m (57.4ft), Out-to-Out Width: 18.4m (60.4ft)
Condition: Deck: Satisfactory, Superstructure: Very good, Substructure: Good, Operating Rating: 64.4 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 39.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Superior to present desirable criteria, Underclear: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 20.10m (65.94ft), Designated Inspection Frequency: Every 48 months, Inspection Date: October 2018, Bridge Improvement Cost: $258,000, Roadway Improvement Cost: $761,000, Total Project Cost: $3,486,000, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 4455, Location: EAST OF BREEZEWOOD INTG (Lat: 39.985000, Lng: -78.243333), Route carried "on" structure: Interstate 76, Year Built: 2003, Status: Open, Structure Length: 17.89m (58.69ft), Average Daily Traffic: 20,195 (year 1999), Truck Traffic: 37%, Average Future Daily Traffic: 25,854 (year 2030), Design Load: HL 93, Features Intersected: I-70 & SR 2035(LR 05021)
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 6, Base Highway Network: Yes, Toll: On toll road, Owner: State Toll Authority, Approaching Roadway Width: 17.4m (57.1ft), Skew: 11 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 50.3m (165.0ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 17.5m (57.4ft), Out-to-Out Width: 18.4m (60.4ft)
Condition: Deck: Satisfactory, Superstructure: Very good, Substructure: Good, Operating Rating: 66.2 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 39.9 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Better than present minimum criteria, Underclear: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 18.70m (61.35ft), Designated Inspection Frequency: Every 48 months, Inspection Date: October 2018, Bridge Improvement Cost: $241,000, Roadway Improvement Cost: $710,000, Total Project Cost: $3,255,000, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 4455, Location: EAST OF BREEZEWOOD INTG (Lat: 39.985000, Lng: -78.243333), Route carried "on" structure: Interstate 76, Year Built: 2003, Status: Open, Structure Length: 17.89m (58.69ft), Average Daily Traffic: 20,195 (year 1999), Truck Traffic: 37%, Average Future Daily Traffic: 25,854 (year 2030), Design Load: HL 93, Features Intersected: I-70 & SR 2035(LR 05021)
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 6, Base Highway Network: Yes, Toll: On toll road, Owner: State Toll Authority, Approaching Roadway Width: 17.4m (57.1ft), Skew: 11 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 50.3m (165.0ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 17.5m (57.4ft), Out-to-Out Width: 18.4m (60.4ft)
Condition: Deck: Satisfactory, Superstructure: Very good, Substructure: Good, Operating Rating: 66.2 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 39.9 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Better than present minimum criteria, Underclear: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 18.70m (61.35ft), Designated Inspection Frequency: Every 48 months, Inspection Date: October 2018, Bridge Improvement Cost: $241,000, Roadway Improvement Cost: $710,000, Total Project Cost: $3,255,000, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 446, Location: EAST OF BREEZEWOOD (Lat: 40.012231, Lng: -78.206611), Route carried "on" structure: US 30, Year Built: 1969, Year Reconstructed: 1994, Status: Open, Structure Length: 11.19m (36.71ft), Average Daily Traffic: 2,815 (year 2021), Truck Traffic: 12%, Average Future Daily Traffic: 3,766 (year 2030), Design Load: HL 93, Features Intersected: PA TPK (I-76)
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 56.134, Lanes on structure: 3, Lanes under structure: 5, Base Highway Network: Yes, Owner: State Toll Authority, Approaching Roadway Width: 17.1m (56.1ft), Skew: 5 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 37.5m (123.0ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 13.4m (44.0ft), Out-to-Out Width: 15.1m (49.5ft)
Condition: Deck: Good, Superstructure: Fair, Substructure: Satisfactory, Operating Rating: 49.0 metric tons, Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR), Inventory Rating: 37.2 metric tons, Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Somewhat better than minimum adequacy, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 12.10m (39.70ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2020, Bridge Improvement Cost: $169,000, Roadway Improvement Cost: $496,000, Total Project Cost: $2,276,000, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Structure Number: 446, Location: EAST OF BREEZEWOOD (Lat: 40.012231, Lng: -78.206611), Route carried "on" structure: US 30, Year Built: 1969, Year Reconstructed: 1994, Status: Open, Structure Length: 11.19m (36.71ft), Average Daily Traffic: 2,815 (year 2021), Truck Traffic: 12%, Average Future Daily Traffic: 3,766 (year 2030), Design Load: HL 93, Features Intersected: PA TPK (I-76)
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 56.134, Lanes on structure: 3, Lanes under structure: 5, Base Highway Network: Yes, Owner: State Toll Authority, Approaching Roadway Width: 17.1m (56.1ft), Skew: 5 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 37.5m (123.0ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 13.4m (44.0ft), Out-to-Out Width: 15.1m (49.5ft)
Condition: Deck: Good, Superstructure: Fair, Substructure: Satisfactory, Operating Rating: 49.0 metric tons, Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR), Inventory Rating: 37.2 metric tons, Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Somewhat better than minimum adequacy, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 12.10m (39.70ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2020, Bridge Improvement Cost: $169,000, Roadway Improvement Cost: $496,000, Total Project Cost: $2,276,000, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >> Show street view
Structure Number: 4482, Location: 1.5 MI.NE.OF BREEZEWOOD (Lat: 40.022250, Lng: -78.234203), Route carried "on" structure: City street , Year Built: 1925, Status: Open, Structure Length: 0.82m (2.69ft), Average Daily Traffic: 11 (year 2020), Average Future Daily Traffic: 14 (year 2040), Features Intersected: TUB MILL RUN, Facility Carried by Structure: T-444, RIDGE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Town or Township Highway Agency, Approaching Roadway Width: 4.9m (16.1ft), Material/Design: Concrete, Design/Construction: Tee Beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 7.9m (25.9ft), Curb or Sidewalk Widths: Left: 0.1m (0.3ft), Right: 0.1m (0.3ft), Curb-To-Curb Width: 4.9m (16.1ft), Out-to-Out Width: 5.5m (18.0ft)
Condition: Deck: Fair, Superstructure: Fair, Substructure: Fair, Channel: Satisfactory, Operating Rating: 32.7 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 19.1 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of corrective action, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.00m (3.28ft), Designated Inspection Frequency: Every 24 months, Inspection Date: December 2020, Bridge Improvement Cost: $42,000, Roadway Improvement Cost: $243,000, Total Project Cost: $567,000, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous
Structure Number: 4482, Location: 1.5 MI.NE.OF BREEZEWOOD (Lat: 40.022250, Lng: -78.234203), Route carried "on" structure: City street , Year Built: 1925, Status: Open, Structure Length: 0.82m (2.69ft), Average Daily Traffic: 11 (year 2020), Average Future Daily Traffic: 14 (year 2040), Features Intersected: TUB MILL RUN, Facility Carried by Structure: T-444, RIDGE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Town or Township Highway Agency, Approaching Roadway Width: 4.9m (16.1ft), Material/Design: Concrete, Design/Construction: Tee Beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 7.9m (25.9ft), Curb or Sidewalk Widths: Left: 0.1m (0.3ft), Right: 0.1m (0.3ft), Curb-To-Curb Width: 4.9m (16.1ft), Out-to-Out Width: 5.5m (18.0ft)
Condition: Deck: Fair, Superstructure: Fair, Substructure: Fair, Channel: Satisfactory, Operating Rating: 32.7 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 19.1 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of corrective action, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.00m (3.28ft), Designated Inspection Frequency: Every 24 months, Inspection Date: December 2020, Bridge Improvement Cost: $42,000, Roadway Improvement Cost: $243,000, Total Project Cost: $567,000, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >> Show street view
Structure Number: 4564, Location: BREEZEWOOD (Lat: 40.000000, Lng: -78.233333), Route carried "on" structure: Ramp Interstate 70, Year Built: 1970, Year Reconstructed: 1993, Status: Open, Structure Length: 3.66m (12.01ft), Average Daily Traffic: 6,000 (year 2012), Truck Traffic: 30%, Average Future Daily Traffic: 6,625 (year 2030), Design Load: HS 20, Features Intersected: SR 0030; S-9370, Facility Carried by Structure: PA TPK (RAMP G)
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 4, Base Highway Network: Yes, Toll: On toll road, Owner: State Toll Authority, Approaching Roadway Width: 9.8m (32.2ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 35.1m (115.2ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 9.5m (31.2ft), Out-to-Out Width: 10.7m (35.1ft)
Condition: Deck: Fair, Superstructure: Good, Substructure: Satisfactory, Inventory Rating: 99.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 4.60m (15.09ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2020, Bridge Improvement Cost: $85,000, Roadway Improvement Cost: $264,000, Total Project Cost: $1,149,000, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Structure Number: 4564, Location: BREEZEWOOD (Lat: 40.000000, Lng: -78.233333), Route carried "on" structure: Ramp Interstate 70, Year Built: 1970, Year Reconstructed: 1993, Status: Open, Structure Length: 3.66m (12.01ft), Average Daily Traffic: 6,000 (year 2012), Truck Traffic: 30%, Average Future Daily Traffic: 6,625 (year 2030), Design Load: HS 20, Features Intersected: SR 0030; S-9370, Facility Carried by Structure: PA TPK (RAMP G)
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 4, Base Highway Network: Yes, Toll: On toll road, Owner: State Toll Authority, Approaching Roadway Width: 9.8m (32.2ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 35.1m (115.2ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 9.5m (31.2ft), Out-to-Out Width: 10.7m (35.1ft)
Condition: Deck: Fair, Superstructure: Good, Substructure: Satisfactory, Inventory Rating: 99.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 4.60m (15.09ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2020, Bridge Improvement Cost: $85,000, Roadway Improvement Cost: $264,000, Total Project Cost: $1,149,000, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >> Show street view
Structure Number: 17864, Location: 0.6 MI S OF AKERSVILLE (Lat: 39.976683, Lng: -78.206144), Route carried "on" structure: State highway 915, Year Built: 1929, Status: Open, Structure Length: 1.89m (6.20ft), Average Daily Traffic: 226 (year 2019), Truck Traffic: 4%, Average Future Daily Traffic: 276 (year 2032), Design Load: H 15, Features Intersected: LITTLE BRUSH CREEK
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 4.010, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 5.2m (17.1ft), Skew: 1 degrees, Material/Design: Concrete continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Length of Maximum Span: 8.8m (28.9ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 5.3m (17.4ft), Out-to-Out Width: 6.2m (20.3ft)
Condition: Deck: Satisfactory, Superstructure: Fair, Substructure: Fair, Channel: Fair, Operating Rating: 90.7 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 54.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.40m (7.87ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2020, Bridge Improvement Cost: $67,000, Roadway Improvement Cost: $264,000, Total Project Cost: $906,000, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous
Structure Number: 17864, Location: 0.6 MI S OF AKERSVILLE (Lat: 39.976683, Lng: -78.206144), Route carried "on" structure: State highway 915, Year Built: 1929, Status: Open, Structure Length: 1.89m (6.20ft), Average Daily Traffic: 226 (year 2019), Truck Traffic: 4%, Average Future Daily Traffic: 276 (year 2032), Design Load: H 15, Features Intersected: LITTLE BRUSH CREEK
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 4.010, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 5.2m (17.1ft), Skew: 1 degrees, Material/Design: Concrete continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Length of Maximum Span: 8.8m (28.9ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 5.3m (17.4ft), Out-to-Out Width: 6.2m (20.3ft)
Condition: Deck: Satisfactory, Superstructure: Fair, Substructure: Fair, Channel: Fair, Operating Rating: 90.7 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 54.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.40m (7.87ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2020, Bridge Improvement Cost: $67,000, Roadway Improvement Cost: $264,000, Total Project Cost: $906,000, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >> Show street view
Structure Number: 17865, Location: 3.0 MILE NORTH OF I-70 (Lat: 39.978383, Lng: -78.198192), Route carried "on" structure: State highway 915, Year Built: 1937, Year Reconstructed: 1986, Status: Open, Structure Length: 1.19m (3.90ft), Average Daily Traffic: 214 (year 2019), Truck Traffic: 7%, Average Future Daily Traffic: 233 (year 2032), Design Load: H 20, Features Intersected: ROARING RUN
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 4.849, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 5.8m (19.0ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 11.3m (37.1ft), Curb-To-Curb Width: 7.4m (24.3ft), Out-to-Out Width: 7.9m (25.9ft)
Condition: Deck: Good, Superstructure: Fair, Substructure: Fair, Channel: Fair, Inventory Rating: 60.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 1.80m (5.91ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2020, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 17865, Location: 3.0 MILE NORTH OF I-70 (Lat: 39.978383, Lng: -78.198192), Route carried "on" structure: State highway 915, Year Built: 1937, Year Reconstructed: 1986, Status: Open, Structure Length: 1.19m (3.90ft), Average Daily Traffic: 214 (year 2019), Truck Traffic: 7%, Average Future Daily Traffic: 233 (year 2032), Design Load: H 20, Features Intersected: ROARING RUN
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 4.849, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 5.8m (19.0ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 11.3m (37.1ft), Curb-To-Curb Width: 7.4m (24.3ft), Out-to-Out Width: 7.9m (25.9ft)
Condition: Deck: Good, Superstructure: Fair, Substructure: Fair, Channel: Fair, Inventory Rating: 60.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 1.80m (5.91ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2020, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 17866, Location: 2.0 MI.N.OF AKERSVILLE (Lat: 39.984056, Lng: -78.200161), Route carried "on" structure: State highway 915, Year Built: 1943, Year Reconstructed: 1954, Status: Open, Structure Length: 1.40m (4.59ft), Average Daily Traffic: 214 (year 2019), Truck Traffic: 7%, Average Future Daily Traffic: 233 (year 2032), Design Load: HS 20, Features Intersected: LITTLE BRUSH CREEK
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 5.631, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 5.2m (17.1ft), Skew: 3 degrees, Material/Design: Concrete, Design/Construction: Tee Beam, Number Of Spans In Main Unit: 2, Length of Maximum Span: 6.4m (21.0ft), Curb or Sidewalk Widths: Left: 0.4m (1.3ft), Right: 0.4m (1.3ft), Curb-To-Curb Width: 7.5m (24.6ft), Out-to-Out Width: 8.2m (26.9ft)
Condition: Deck: Fair, Superstructure: Fair, Substructure: Fair, Channel: Poor, Operating Rating: 67.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 39.9 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.00m (6.56ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2020, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous
Structure Number: 17866, Location: 2.0 MI.N.OF AKERSVILLE (Lat: 39.984056, Lng: -78.200161), Route carried "on" structure: State highway 915, Year Built: 1943, Year Reconstructed: 1954, Status: Open, Structure Length: 1.40m (4.59ft), Average Daily Traffic: 214 (year 2019), Truck Traffic: 7%, Average Future Daily Traffic: 233 (year 2032), Design Load: HS 20, Features Intersected: LITTLE BRUSH CREEK
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 5.631, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 5.2m (17.1ft), Skew: 3 degrees, Material/Design: Concrete, Design/Construction: Tee Beam, Number Of Spans In Main Unit: 2, Length of Maximum Span: 6.4m (21.0ft), Curb or Sidewalk Widths: Left: 0.4m (1.3ft), Right: 0.4m (1.3ft), Curb-To-Curb Width: 7.5m (24.6ft), Out-to-Out Width: 8.2m (26.9ft)
Condition: Deck: Fair, Superstructure: Fair, Substructure: Fair, Channel: Poor, Operating Rating: 67.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 39.9 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.00m (6.56ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2020, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >> Show street view
Structure Number: 17867, Location: 0.4 MILE SOUTH OF SR 4013 (Lat: 40.071194, Lng: -78.140356), Route carried "on" structure: State highway 915, Year Built: 1996, Status: Open, Structure Length: 1.62m (5.31ft), Average Daily Traffic: 902 (year 2019), Truck Traffic: 6%, Average Future Daily Traffic: 938 (year 2032), Design Load: HS 25 or greater, Features Intersected: SIDELING HILL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 17.080, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 10.4m (34.1ft), Skew: 1 degrees, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Single/Spread, Number Of Spans In Main Unit: 1, Length of Maximum Span: 15.8m (51.8ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 10.4m (34.1ft), Out-to-Out Width: 11.4m (37.4ft)
Condition: Deck: Good, Superstructure: Very good, Substructure: Very good, Channel: Satisfactory, Operating Rating: 89.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 49.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Equal to present minimum criteria, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.30m (7.55ft), Designated Inspection Frequency: Every 48 months, Inspection Date: Febuary 2020, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 17867, Location: 0.4 MILE SOUTH OF SR 4013 (Lat: 40.071194, Lng: -78.140356), Route carried "on" structure: State highway 915, Year Built: 1996, Status: Open, Structure Length: 1.62m (5.31ft), Average Daily Traffic: 902 (year 2019), Truck Traffic: 6%, Average Future Daily Traffic: 938 (year 2032), Design Load: HS 25 or greater, Features Intersected: SIDELING HILL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 17.080, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 10.4m (34.1ft), Skew: 1 degrees, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Single/Spread, Number Of Spans In Main Unit: 1, Length of Maximum Span: 15.8m (51.8ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 10.4m (34.1ft), Out-to-Out Width: 11.4m (37.4ft)
Condition: Deck: Good, Superstructure: Very good, Substructure: Very good, Channel: Satisfactory, Operating Rating: 89.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 49.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Equal to present minimum criteria, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.30m (7.55ft), Designated Inspection Frequency: Every 48 months, Inspection Date: Febuary 2020, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 17868, Location: 2.6 MILE SOUTH OF BED.CO. (Lat: 40.081442, Lng: -78.149778), Route carried "on" structure: State highway 915, Year Built: 1953, Year Reconstructed: 2007, Status: Open, Structure Length: 0.94m (3.08ft), Average Daily Traffic: 663 (year 2019), Truck Traffic: 6%, Average Future Daily Traffic: 862 (year 2032), Design Load: HS 20, Features Intersected: SIDELING HILL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 19.341, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 7.6m (24.9ft), Skew: 1 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 8.8m (28.9ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 7.9m (25.9ft)
Condition: Deck: Good, Superstructure: Fair, Substructure: Satisfactory, Channel: Satisfactory, Operating Rating: 49.9 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 29.9 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Meets minimum limits, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 1.58m (5.18ft), Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2020, Bridge Improvement Cost: $7,000, Roadway Improvement Cost: $20,000, Total Project Cost: $91,000, Deck Structure Type: Closed Grating, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Preformed Fabric
Structure Number: 17868, Location: 2.6 MILE SOUTH OF BED.CO. (Lat: 40.081442, Lng: -78.149778), Route carried "on" structure: State highway 915, Year Built: 1953, Year Reconstructed: 2007, Status: Open, Structure Length: 0.94m (3.08ft), Average Daily Traffic: 663 (year 2019), Truck Traffic: 6%, Average Future Daily Traffic: 862 (year 2032), Design Load: HS 20, Features Intersected: SIDELING HILL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 19.341, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 7.6m (24.9ft), Skew: 1 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 8.8m (28.9ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 7.9m (25.9ft)
Condition: Deck: Good, Superstructure: Fair, Substructure: Satisfactory, Channel: Satisfactory, Operating Rating: 49.9 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 29.9 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Meets minimum limits, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 1.58m (5.18ft), Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2020, Bridge Improvement Cost: $7,000, Roadway Improvement Cost: $20,000, Total Project Cost: $91,000, Deck Structure Type: Closed Grating, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Preformed Fabric
Find on map >> Show street view
Structure Number: 17951, Location: NEAR TR30 & SR915 JUNCTIN (Lat: 40.020000, Lng: -78.168333), Route carried "on" structure: Interstate 76, Year Built: 1969, Status: Open, Structure Length: 0.85m (2.79ft), Average Daily Traffic: 21,770 (year 2008), Truck Traffic: 37%, Average Future Daily Traffic: 27,450 (year 2030), Design Load: HS 20, Features Intersected: OREGON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 2, Base Highway Network: Yes, Toll: On toll road, Owner: State Toll Authority, Approaching Roadway Width: 32.9m (107.9ft), Skew: 36 degrees, Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 1, Length of Maximum Span: 7.3m (24.0ft), Out-to-Out Width: 13.0m (42.7ft)
Condition: Culverts: Good, Inventory Rating: 75.3 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.50m (4.92ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2020
Structure Number: 17951, Location: NEAR TR30 & SR915 JUNCTIN (Lat: 40.020000, Lng: -78.168333), Route carried "on" structure: Interstate 76, Year Built: 1969, Status: Open, Structure Length: 0.85m (2.79ft), Average Daily Traffic: 21,770 (year 2008), Truck Traffic: 37%, Average Future Daily Traffic: 27,450 (year 2030), Design Load: HS 20, Features Intersected: OREGON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 2, Base Highway Network: Yes, Toll: On toll road, Owner: State Toll Authority, Approaching Roadway Width: 32.9m (107.9ft), Skew: 36 degrees, Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 1, Length of Maximum Span: 7.3m (24.0ft), Out-to-Out Width: 13.0m (42.7ft)
Condition: Culverts: Good, Inventory Rating: 75.3 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.50m (4.92ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2020
Find on map >> Show street view
Structure Number: 17952, Location: EAST OF BREEZEWOOD (Lat: 40.033861, Lng: -78.149922), Route carried "on" structure: State highway 915, Year Built: 1969, Status: Open, Structure Length: 8.41m (27.59ft), Average Daily Traffic: 1,060 (year 2021), Truck Traffic: 15%, Average Future Daily Traffic: 1,179 (year 2030), Design Load: HL 93, Features Intersected: PA TPK (I-76)
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 12.513, Lanes on structure: 2, Lanes under structure: 5, Owner: State Toll Authority, Approaching Roadway Width: 8.5m (27.9ft), Skew: 4 degrees, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 27.7m (90.9ft), Curb or Sidewalk Widths: Left: 0.5m (1.6ft), Right: 0.5m (1.6ft), Curb-To-Curb Width: 8.5m (27.9ft), Out-to-Out Width: 10.2m (33.5ft)
Condition: Deck: Fair, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 50.8 metric tons, Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR), Inventory Rating: 33.6 metric tons, Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 9.30m (30.51ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2020, Bridge Improvement Cost: $38,000, Roadway Improvement Cost: $113,000, Total Project Cost: $516,000, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous
Structure Number: 17952, Location: EAST OF BREEZEWOOD (Lat: 40.033861, Lng: -78.149922), Route carried "on" structure: State highway 915, Year Built: 1969, Status: Open, Structure Length: 8.41m (27.59ft), Average Daily Traffic: 1,060 (year 2021), Truck Traffic: 15%, Average Future Daily Traffic: 1,179 (year 2030), Design Load: HL 93, Features Intersected: PA TPK (I-76)
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 12.513, Lanes on structure: 2, Lanes under structure: 5, Owner: State Toll Authority, Approaching Roadway Width: 8.5m (27.9ft), Skew: 4 degrees, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 27.7m (90.9ft), Curb or Sidewalk Widths: Left: 0.5m (1.6ft), Right: 0.5m (1.6ft), Curb-To-Curb Width: 8.5m (27.9ft), Out-to-Out Width: 10.2m (33.5ft)
Condition: Deck: Fair, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 50.8 metric tons, Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR), Inventory Rating: 33.6 metric tons, Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 9.30m (30.51ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2020, Bridge Improvement Cost: $38,000, Roadway Improvement Cost: $113,000, Total Project Cost: $516,000, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >> Show street view
Structure Number: 41051, Location: WB AT BREEZEWOOD INTRCHNG (Lat: 39.983950, Lng: -78.239514), Route carried "on" structure: Ramp Interstate 70, Year Built: 1999, Status: Open, Structure Length: 3.23m (10.60ft), Average Daily Traffic: 8,722 (year 2008), Truck Traffic: 30%, Average Future Daily Traffic: 10,081 (year 2030), Design Load: HS 25 or greater, Features Intersected: SR 2029
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 2, Base Highway Network: Yes, Toll: On toll road, Owner: State Toll Authority, Approaching Roadway Width: 13.1m (43.0ft), Skew: 13 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 30.2m (99.1ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 13.0m (42.7ft), Out-to-Out Width: 14.1m (46.3ft)
Condition: Deck: Good, Superstructure: Very good, Substructure: Good, Inventory Rating: 68.9 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Superior to present desirable criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 48 months, Inspection Date: October 2018, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Latex Concrete, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 41051, Location: WB AT BREEZEWOOD INTRCHNG (Lat: 39.983950, Lng: -78.239514), Route carried "on" structure: Ramp Interstate 70, Year Built: 1999, Status: Open, Structure Length: 3.23m (10.60ft), Average Daily Traffic: 8,722 (year 2008), Truck Traffic: 30%, Average Future Daily Traffic: 10,081 (year 2030), Design Load: HS 25 or greater, Features Intersected: SR 2029
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 2, Base Highway Network: Yes, Toll: On toll road, Owner: State Toll Authority, Approaching Roadway Width: 13.1m (43.0ft), Skew: 13 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 30.2m (99.1ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 13.0m (42.7ft), Out-to-Out Width: 14.1m (46.3ft)
Condition: Deck: Good, Superstructure: Very good, Substructure: Good, Inventory Rating: 68.9 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Superior to present desirable criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 48 months, Inspection Date: October 2018, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Latex Concrete, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 45553, Location: 1.7 MILE NE OF BREEZEWOOD (Lat: 40.021958, Lng: -78.233864), Route carried "on" structure: State highway , Year Built: 2009, Status: Open, Structure Length: 0.64m (2.10ft), Average Daily Traffic: 153 (year 2020), Truck Traffic: 3%, Average Future Daily Traffic: 283 (year 2032), Design Load: HL 93, Features Intersected: TRIB TUB MILL RUN, Facility Carried by Structure: SR 1013
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 3.156, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 6.4m (21.0ft), Skew: 2 degrees, Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 1, Length of Maximum Span: 6.1m (20.0ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 11.6m (38.1ft)
Condition: Channel: Satisfactory, Culverts: Very good, Operating Rating: 63.5 metric tons, Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR), Inventory Rating: 49.0 metric tons, Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR), Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 48 months, Inspection Date: March 2019, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Preformed Fabric, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 45553, Location: 1.7 MILE NE OF BREEZEWOOD (Lat: 40.021958, Lng: -78.233864), Route carried "on" structure: State highway , Year Built: 2009, Status: Open, Structure Length: 0.64m (2.10ft), Average Daily Traffic: 153 (year 2020), Truck Traffic: 3%, Average Future Daily Traffic: 283 (year 2032), Design Load: HL 93, Features Intersected: TRIB TUB MILL RUN, Facility Carried by Structure: SR 1013
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 3.156, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 6.4m (21.0ft), Skew: 2 degrees, Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 1, Length of Maximum Span: 6.1m (20.0ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 11.6m (38.1ft)
Condition: Channel: Satisfactory, Culverts: Very good, Operating Rating: 63.5 metric tons, Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR), Inventory Rating: 49.0 metric tons, Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR), Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 48 months, Inspection Date: March 2019, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Preformed Fabric, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 57207, Location: .5 MI S OF BREEZEWOOD (Lat: 39.991458, Lng: -78.247472), Route carried "on" structure: State highway , Year Built: 2019, Status: Open, Structure Length: 0.85m (2.79ft), Average Daily Traffic: 354 (year 2020), Truck Traffic: 18%, Average Future Daily Traffic: 552 (year 2039), Design Load: HL 93, Features Intersected: TR RAYSTOWN BR JUNIATA R, Facility Carried by Structure: SR 2029
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 21.342, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 7.9m (25.9ft), Skew: 6 degrees, Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 1, Length of Maximum Span: 3.7m (12.1ft), Curb-To-Curb Width: 7.9m (25.9ft), Out-to-Out Width: 18.8m (61.7ft)
Condition: Channel: Very good, Culverts: Very good, Operating Rating: 44.1 metric tons, Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings, Inventory Rating: 34.0 metric tons, Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings, Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 0.90m (2.95ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2021, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Preformed Fabric, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 57207, Location: .5 MI S OF BREEZEWOOD (Lat: 39.991458, Lng: -78.247472), Route carried "on" structure: State highway , Year Built: 2019, Status: Open, Structure Length: 0.85m (2.79ft), Average Daily Traffic: 354 (year 2020), Truck Traffic: 18%, Average Future Daily Traffic: 552 (year 2039), Design Load: HL 93, Features Intersected: TR RAYSTOWN BR JUNIATA R, Facility Carried by Structure: SR 2029
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 21.342, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 7.9m (25.9ft), Skew: 6 degrees, Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 1, Length of Maximum Span: 3.7m (12.1ft), Curb-To-Curb Width: 7.9m (25.9ft), Out-to-Out Width: 18.8m (61.7ft)
Condition: Channel: Very good, Culverts: Very good, Operating Rating: 44.1 metric tons, Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings, Inventory Rating: 34.0 metric tons, Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings, Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 0.90m (2.95ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2021, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Preformed Fabric, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 4024, Location: OVER PA TURNPIKE EXIT 161 (Lat: 39.990628, Lng: -78.242764), Route carried "under" structure: Interstate , Year Built: 1963, Structure Length: 0. m, Average Daily Traffic: 9,192 (year 2005), Truck Traffic: 31%, Features Intersected: TURNPIKE EXIT 161 RAMPS, Facility Carried by Structure: I-70 EBL
Minimum Vertical Clearance: 5.08m (16.67ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 25.6m (84.0ft)
Structure Number: 4024, Location: OVER PA TURNPIKE EXIT 161 (Lat: 39.990628, Lng: -78.242764), Route carried "under" structure: Interstate , Year Built: 1963, Structure Length: 0. m, Average Daily Traffic: 9,192 (year 2005), Truck Traffic: 31%, Features Intersected: TURNPIKE EXIT 161 RAMPS, Facility Carried by Structure: I-70 EBL
Minimum Vertical Clearance: 5.08m (16.67ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 25.6m (84.0ft)
Find on map >> Show street view
Structure Number: 4026, Location: OVER PA TURNPIKE EXIT 161 (Lat: 39.990708, Lng: -78.241394), Route carried "under" structure: Interstate 76, Year Built: 1963, Structure Length: 0. m, Average Daily Traffic: 9,192 (year 2005), Truck Traffic: 31%, Features Intersected: TURNPIKE EXIT 161 RAMPS, Facility Carried by Structure: I-70 WBL
Minimum Vertical Clearance: 5.13m (16.83ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 25.6m (84.0ft)
Structure Number: 4026, Location: OVER PA TURNPIKE EXIT 161 (Lat: 39.990708, Lng: -78.241394), Route carried "under" structure: Interstate 76, Year Built: 1963, Structure Length: 0. m, Average Daily Traffic: 9,192 (year 2005), Truck Traffic: 31%, Features Intersected: TURNPIKE EXIT 161 RAMPS, Facility Carried by Structure: I-70 WBL
Minimum Vertical Clearance: 5.13m (16.83ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 25.6m (84.0ft)
Find on map >> Show street view
Structure Number: 403, Location: OVER SR 2035 AT EXIT 149 (Lat: 39.990000, Lng: -78.240000), Route carried "under" structure: State highway , Year Built: 1963, Structure Length: 0. m, Average Daily Traffic: 2,294 (year 2022), Truck Traffic: 14%, Features Intersected: SR 2035, Facility Carried by Structure: I-70 WBL
Minimum Vertical Clearance: 4.42m (14.50ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 9.8m (32.2ft)
Structure Number: 403, Location: OVER SR 2035 AT EXIT 149 (Lat: 39.990000, Lng: -78.240000), Route carried "under" structure: State highway , Year Built: 1963, Structure Length: 0. m, Average Daily Traffic: 2,294 (year 2022), Truck Traffic: 14%, Features Intersected: SR 2035, Facility Carried by Structure: I-70 WBL
Minimum Vertical Clearance: 4.42m (14.50ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 9.8m (32.2ft)
Find on map >> Show street view
Structure Number: 4453, Location: EB AT BREEZEWOOD INTG (Lat: 39.988333, Lng: -78.240000), Route carried "under" structure: State highway , Year Built: 1940, Structure Length: 0. m, Average Daily Traffic: 354 (year 2020), Truck Traffic: 18%, Features Intersected: SR 2029, Facility Carried by Structure: TPK RP CONN I-70
Minimum Vertical Clearance: 4.46m (14.63ft), Kilometerpoint: 21.342, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 29.3m (96.1ft)
Structure Number: 4453, Location: EB AT BREEZEWOOD INTG (Lat: 39.988333, Lng: -78.240000), Route carried "under" structure: State highway , Year Built: 1940, Structure Length: 0. m, Average Daily Traffic: 354 (year 2020), Truck Traffic: 18%, Features Intersected: SR 2029, Facility Carried by Structure: TPK RP CONN I-70
Minimum Vertical Clearance: 4.46m (14.63ft), Kilometerpoint: 21.342, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 29.3m (96.1ft)
Find on map >> Show street view
Structure Number: 4454, Location: EAST OF BREEZEWOOD (Lat: 39.984564, Lng: -78.240419), Route carried "under" structure: State highway , Year Built: 2003, Structure Length: 0. m, Average Daily Traffic: 2,294 (year 2022), Truck Traffic: 14%, Features Intersected: I-70 & SR 2035(LR 05021), Facility Carried by Structure: PA TPK (I-76)
Minimum Vertical Clearance: 11.39m (37.37ft), Kilometerpoint: 0.903, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 50.3m (165.0ft)
Structure Number: 4454, Location: EAST OF BREEZEWOOD (Lat: 39.984564, Lng: -78.240419), Route carried "under" structure: State highway , Year Built: 2003, Structure Length: 0. m, Average Daily Traffic: 2,294 (year 2022), Truck Traffic: 14%, Features Intersected: I-70 & SR 2035(LR 05021), Facility Carried by Structure: PA TPK (I-76)
Minimum Vertical Clearance: 11.39m (37.37ft), Kilometerpoint: 0.903, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 50.3m (165.0ft)
Find on map >> Show street view
Structure Number: 4454, Location: EAST OF BREEZEWOOD (Lat: 39.984564, Lng: -78.240419), Route carried "under" structure: Interstate 70, Year Built: 2003, Structure Length: 0. m, Average Daily Traffic: 7,675 (year 2020), Truck Traffic: 37%, Features Intersected: I-70 & SR 2035(LR 05021), Facility Carried by Structure: PA TPK (I-76)
Minimum Vertical Clearance: 6.31m (20.70ft), Kilometerpoint: 1.624, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 50.3m (165.0ft)
Structure Number: 4454, Location: EAST OF BREEZEWOOD (Lat: 39.984564, Lng: -78.240419), Route carried "under" structure: Interstate 70, Year Built: 2003, Structure Length: 0. m, Average Daily Traffic: 7,675 (year 2020), Truck Traffic: 37%, Features Intersected: I-70 & SR 2035(LR 05021), Facility Carried by Structure: PA TPK (I-76)
Minimum Vertical Clearance: 6.31m (20.70ft), Kilometerpoint: 1.624, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 50.3m (165.0ft)
Find on map >> Show street view
Structure Number: 4454, Location: EAST OF BREEZEWOOD (Lat: 39.984564, Lng: -78.240419), Route carried "under" structure: Interstate 70, Year Built: 2003, Structure Length: 0. m, Average Daily Traffic: 7,400 (year 2020), Truck Traffic: 42%, Features Intersected: I-70 & SR 2035(LR 05021), Facility Carried by Structure: PA TPK (I-76)
Minimum Vertical Clearance: 4.98m (16.34ft), Kilometerpoint: 1.614, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 50.3m (165.0ft)
Structure Number: 4454, Location: EAST OF BREEZEWOOD (Lat: 39.984564, Lng: -78.240419), Route carried "under" structure: Interstate 70, Year Built: 2003, Structure Length: 0. m, Average Daily Traffic: 7,400 (year 2020), Truck Traffic: 42%, Features Intersected: I-70 & SR 2035(LR 05021), Facility Carried by Structure: PA TPK (I-76)
Minimum Vertical Clearance: 4.98m (16.34ft), Kilometerpoint: 1.614, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 50.3m (165.0ft)
Find on map >> Show street view
Structure Number: 4455, Location: EAST OF BREEZEWOOD INTG (Lat: 39.985000, Lng: -78.243333), Route carried "under" structure: State highway , Year Built: 2003, Structure Length: 0. m, Average Daily Traffic: 2,294 (year 2022), Truck Traffic: 14%, Features Intersected: I-70 & SR 2035(LR 05021), Facility Carried by Structure: PA TPK (I-76)
Minimum Vertical Clearance: 10.35m (33.96ft), Kilometerpoint: 0.903, Lanes on structure: 3, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 50.3m (165.0ft)
Structure Number: 4455, Location: EAST OF BREEZEWOOD INTG (Lat: 39.985000, Lng: -78.243333), Route carried "under" structure: State highway , Year Built: 2003, Structure Length: 0. m, Average Daily Traffic: 2,294 (year 2022), Truck Traffic: 14%, Features Intersected: I-70 & SR 2035(LR 05021), Facility Carried by Structure: PA TPK (I-76)
Minimum Vertical Clearance: 10.35m (33.96ft), Kilometerpoint: 0.903, Lanes on structure: 3, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 50.3m (165.0ft)
Find on map >> Show street view
Structure Number: 4455, Location: EAST OF BREEZEWOOD INTG (Lat: 39.985000, Lng: -78.243333), Route carried "under" structure: Interstate 70, Year Built: 2003, Structure Length: 0. m, Average Daily Traffic: 7,675 (year 2020), Truck Traffic: 37%, Features Intersected: I-70 & SR 2035(LR 05021), Facility Carried by Structure: PA TPK (I-76)
Minimum Vertical Clearance: 5.11m (16.77ft), Kilometerpoint: 1.624, Lanes on structure: 3, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 50.3m (165.0ft)
Structure Number: 4455, Location: EAST OF BREEZEWOOD INTG (Lat: 39.985000, Lng: -78.243333), Route carried "under" structure: Interstate 70, Year Built: 2003, Structure Length: 0. m, Average Daily Traffic: 7,675 (year 2020), Truck Traffic: 37%, Features Intersected: I-70 & SR 2035(LR 05021), Facility Carried by Structure: PA TPK (I-76)
Minimum Vertical Clearance: 5.11m (16.77ft), Kilometerpoint: 1.624, Lanes on structure: 3, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 50.3m (165.0ft)
Find on map >> Show street view
Structure Number: 4455, Location: EAST OF BREEZEWOOD INTG (Lat: 39.985000, Lng: -78.243333), Route carried "under" structure: Interstate 70, Year Built: 2003, Structure Length: 0. m, Average Daily Traffic: 7,400 (year 2020), Truck Traffic: 42%, Features Intersected: I-70 & SR 2035(LR 05021), Facility Carried by Structure: PA TPK (I-76)
Minimum Vertical Clearance: 6.15m (20.18ft), Kilometerpoint: 1.614, Lanes on structure: 3, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 50.3m (165.0ft)
Structure Number: 4455, Location: EAST OF BREEZEWOOD INTG (Lat: 39.985000, Lng: -78.243333), Route carried "under" structure: Interstate 70, Year Built: 2003, Structure Length: 0. m, Average Daily Traffic: 7,400 (year 2020), Truck Traffic: 42%, Features Intersected: I-70 & SR 2035(LR 05021), Facility Carried by Structure: PA TPK (I-76)
Minimum Vertical Clearance: 6.15m (20.18ft), Kilometerpoint: 1.614, Lanes on structure: 3, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 50.3m (165.0ft)
Find on map >> Show street view
Structure Number: 4456, Location: NEAR BREEZEWOOD (Lat: 39.990000, Lng: -78.238333), Route carried "under" structure: State highway , Year Built: 1939, Structure Length: 0. m, Average Daily Traffic: 2,294 (year 2022), Truck Traffic: 14%, Features Intersected: SR 2035, Facility Carried by Structure: PA TPK RP TO I-70
Minimum Vertical Clearance: 4.72m (15.49ft), Kilometerpoint: 0.903, Lanes on structure: 4, Lanes under structure: 2, Material/Design: Concrete, Design/Construction: Culvert, Length of Maximum Span: 11.9m (39.0ft)
Structure Number: 4456, Location: NEAR BREEZEWOOD (Lat: 39.990000, Lng: -78.238333), Route carried "under" structure: State highway , Year Built: 1939, Structure Length: 0. m, Average Daily Traffic: 2,294 (year 2022), Truck Traffic: 14%, Features Intersected: SR 2035, Facility Carried by Structure: PA TPK RP TO I-70
Minimum Vertical Clearance: 4.72m (15.49ft), Kilometerpoint: 0.903, Lanes on structure: 4, Lanes under structure: 2, Material/Design: Concrete, Design/Construction: Culvert, Length of Maximum Span: 11.9m (39.0ft)
Find on map >> Show street view
Structure Number: 446, Location: EAST OF BREEZEWOOD (Lat: 40.012231, Lng: -78.206611), Route carried "under" structure: Interstate 76, Year Built: 1969, Structure Length: 0. m, Average Daily Traffic: 20,523 (year 2001), Truck Traffic: 39%, Features Intersected: PA TPK (I-76), Facility Carried by Structure: US 30 (LR 39)
Minimum Vertical Clearance: 6.97m (22.87ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 5, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 37.5m (123.0ft)
Structure Number: 446, Location: EAST OF BREEZEWOOD (Lat: 40.012231, Lng: -78.206611), Route carried "under" structure: Interstate 76, Year Built: 1969, Structure Length: 0. m, Average Daily Traffic: 20,523 (year 2001), Truck Traffic: 39%, Features Intersected: PA TPK (I-76), Facility Carried by Structure: US 30 (LR 39)
Minimum Vertical Clearance: 6.97m (22.87ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 5, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 37.5m (123.0ft)
Find on map >> Show street view
Structure Number: 4564, Location: BREEZEWOOD (Lat: 40.000000, Lng: -78.233333), Route carried "under" structure: US 30, Year Built: 1970, Structure Length: 0. m, Average Daily Traffic: 16,559 (year 2022), Truck Traffic: 22%, Features Intersected: SR 0030; S-9370, Facility Carried by Structure: PA TPK (RAMP G)
Minimum Vertical Clearance: 4.62m (15.16ft), Kilometerpoint: 53.390, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 35.1m (115.2ft)
Structure Number: 4564, Location: BREEZEWOOD (Lat: 40.000000, Lng: -78.233333), Route carried "under" structure: US 30, Year Built: 1970, Structure Length: 0. m, Average Daily Traffic: 16,559 (year 2022), Truck Traffic: 22%, Features Intersected: SR 0030; S-9370, Facility Carried by Structure: PA TPK (RAMP G)
Minimum Vertical Clearance: 4.62m (15.16ft), Kilometerpoint: 53.390, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 35.1m (115.2ft)
Find on map >> Show street view
Structure Number: 17951, Location: NEAR TR30 & SR915 JUNCTIN (Lat: 40.020000, Lng: -78.168333), Route carried "under" structure: ServiceOther road , Year Built: 1969, Structure Length: 0. m, Average Daily Traffic: 200 (year 2008), Truck Traffic: 8%, Features Intersected: OREGON ROAD, Facility Carried by Structure: PA TPK (I-76)
Minimum Vertical Clearance: 4.27m (14.01ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 2, Toll: On toll road, Material/Design: Concrete, Design/Construction: Frame, Length of Maximum Span: 7.3m (24.0ft)
Structure Number: 17951, Location: NEAR TR30 & SR915 JUNCTIN (Lat: 40.020000, Lng: -78.168333), Route carried "under" structure: ServiceOther road , Year Built: 1969, Structure Length: 0. m, Average Daily Traffic: 200 (year 2008), Truck Traffic: 8%, Features Intersected: OREGON ROAD, Facility Carried by Structure: PA TPK (I-76)
Minimum Vertical Clearance: 4.27m (14.01ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 2, Toll: On toll road, Material/Design: Concrete, Design/Construction: Frame, Length of Maximum Span: 7.3m (24.0ft)
Find on map >> Show street view
Structure Number: 17952, Location: EAST OF BREEZEWOOD (Lat: 40.033861, Lng: -78.149922), Route carried "under" structure: Interstate 76, Year Built: 1969, Structure Length: 0. m, Average Daily Traffic: 20,523 (year 2001), Truck Traffic: 39%, Features Intersected: PA TPK (I-76), Facility Carried by Structure: PA 915 (LR 706)
Minimum Vertical Clearance: 4.98m (16.34ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 5, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 27.7m (90.9ft)
Structure Number: 17952, Location: EAST OF BREEZEWOOD (Lat: 40.033861, Lng: -78.149922), Route carried "under" structure: Interstate 76, Year Built: 1969, Structure Length: 0. m, Average Daily Traffic: 20,523 (year 2001), Truck Traffic: 39%, Features Intersected: PA TPK (I-76), Facility Carried by Structure: PA 915 (LR 706)
Minimum Vertical Clearance: 4.98m (16.34ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 5, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 27.7m (90.9ft)
Find on map >> Show street view
Structure Number: 41051, Location: WB AT BREEZEWOOD INTRCHNG (Lat: 39.983950, Lng: -78.239514), Route carried "under" structure: State highway , Year Built: 1999, Structure Length: 0. m, Average Daily Traffic: 354 (year 2020), Truck Traffic: 18%, Features Intersected: SR 2029, Facility Carried by Structure: PTC CONN. TO I-70
Minimum Vertical Clearance: 4.71m (15.45ft), Kilometerpoint: 21.342, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 30.2m (99.1ft)
Structure Number: 41051, Location: WB AT BREEZEWOOD INTRCHNG (Lat: 39.983950, Lng: -78.239514), Route carried "under" structure: State highway , Year Built: 1999, Structure Length: 0. m, Average Daily Traffic: 354 (year 2020), Truck Traffic: 18%, Features Intersected: SR 2029, Facility Carried by Structure: PTC CONN. TO I-70
Minimum Vertical Clearance: 4.71m (15.45ft), Kilometerpoint: 21.342, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 30.2m (99.1ft)