Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Wagner, South Dakota (SD)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 12Number of bridges
  • 79ft / 23.8mTotal length
  • $2,948,000Total costs
  • 8,694Total average daily traffic
  • 817Total average daily truck traffic
  • 11,955Total future (year 2032) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Wagner
  • No street view available for this location

New bridges in Wagner, SD - historical statistics
  • New bridges - historical statistics
  • 11910-1919
  • 11930-1939
  • 11940-1949
  • 11950-1959
  • 31960-1969
  • 21980-1989
  • 21990-1999
  • 12020-2022
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 50.0%Good
  • 12.5%Satisfactory
  • 37.5%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 12.5%Very good
  • 37.5%Good
  • 12.5%Satisfactory
  • 37.5%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 25.0%Good
  • 50.0%Satisfactory
  • 25.0%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 16.7%Very good
  • 58.3%Good
  • 25.0%Satisfactory
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 25.0%Very good
  • 25.0%Good
  • 50.0%Satisfactory
Find on map >>   Show street view

Structure Number: 12480286,  Location: 0.4 N JCT SD46 (Lat: 43.087989,  Lng: -98.347589),  Route carried "on" structure: State highway 50,  Year Built: 2020,  Status: Open,  Structure Length: 0.69m (2.26ft),  Average Daily Traffic: 1,329 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 1,908 (year 2040),  Design Load: HL 93,  Features Intersected: TRIB CHOTEAU CK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 526.931,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.4m (11.2ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 38.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2020
Find on map >>   Show street view

Structure Number: 1249626,  Location: 3.0N & 1.4W of Wagner (Lat: 43.125239,  Lng: -98.315386),  Route carried "on" structure: Other road ,  Year Built: 1986,  Status: Open,  Structure Length: 1.98m (6.50ft),  Average Daily Traffic: 48 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 48 (year 2032),  Design Load: HS 20,  Features Intersected: Choteau Creek,  Facility Carried by Structure: 39360 294th Street
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.5m (64.0ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 1249727,  Location: 2.0N & 1.3W of Wagner (Lat: 43.110803,  Lng: -98.312547),  Route carried "on" structure: Other road ,  Year Built: 1998,  Status: Open,  Structure Length: 2.77m (9.09ft),  Average Daily Traffic: 48 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 48 (year 2032),  Design Load: HL 93,  Features Intersected: Choteau Creek,  Facility Carried by Structure: 39370 295th Street
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.1m (88.9ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 50.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 31.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 12500288,  Location: 1.0 NW OF WAGNER (Lat: 43.084861,  Lng: -98.308469),  Route carried "on" structure: County highway ,  Year Built: 1940,  Status: Open,  Structure Length: 0.62m (2.03ft),  Average Daily Traffic: 1,329 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 1,908 (year 2039),  Design Load: H 15,  Features Intersected: CK,  Facility Carried by Structure: Old IRR SD050
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 529.136,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 25.1 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: October 2020,  Underwater Inspection Date: August 2018
Find on map >>   Show street view

Structure Number: 12510279,  Location: 1.1N of Wagner (Lat: 43.097750,  Lng: -98.288119),  Route carried "on" structure: County highway ,  Year Built: 1955,  Status: Posted for load,  Structure Length: 5.07m (16.63ft),  Average Daily Traffic: 564 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 564 (year 2032),  Design Load: H 15,  Features Intersected: Choteau Creek,  Facility Carried by Structure: 29490 395th Avenue
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 19.5m (64.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 29.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 17.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 5.18m (16.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $1,847,000,  Roadway Improvement Cost: $30,000,  Total Project Cost: $1,877,000 ( Estimate for 2019),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 12510286,  Location: 0.4N of Wagner (Lat: 43.087881,  Lng: -98.288117),  Route carried "on" structure: County highway ,  Year Built: 1991,  Status: Open,  Structure Length: 0.93m (3.05ft),  Average Daily Traffic: 564 (year 2019),  Truck Traffic: 1%,  Average Future Daily Traffic: 600 (year 2032),  Features Intersected: Creek,  Facility Carried by Structure: 29660 395th Avenue
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 9.3m (30.5ft),  Out-to-Out Width: 9.6m (31.5ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1251929,  Location: 0.9 E OF WAGNER (Lat: 43.081531,  Lng: -98.268256),  Route carried "on" structure: State highway 46,  Year Built: 1968,  Status: Open,  Structure Length: 1.08m (3.54ft),  Average Daily Traffic: 1,556 (year 2021),  Truck Traffic: 12%,  Average Future Daily Traffic: 2,245 (year 2041),  Design Load: HS 20,  Features Intersected: CK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 467.498,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 15.5m (50.9ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.4m (11.2ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.10m (3.61ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: July 2018,  Bridge Improvement Cost: $12,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $14,000
Find on map >>   Show street view

Structure Number: 12520282,  Location: 0.8N & 1.0E of Wagner (Lat: 43.092700,  Lng: -98.268236),  Route carried "on" structure: Other road ,  Year Built: 1930,  Status: Posted for load,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 48 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 48 (year 2032),  Features Intersected: Choteau Creek,  Facility Carried by Structure: 29620 396th Avenue
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.1m (33.1ft),  Curb-To-Curb Width: 4.6m (15.1ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Poor,  Channel: Good,  Operating Rating: 5.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 3.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.07m (3.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $530,000,  Roadway Improvement Cost: $30,000,  Total Project Cost: $560,000 ( Estimate for 2019),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 12520284,  Location: 0.6N & 1.0E of Wagner (Lat: 43.090869,  Lng: -98.268236),  Route carried "on" structure: Other road ,  Year Built: 1986,  Status: Open,  Structure Length: 1.54m (5.05ft),  Average Daily Traffic: 48 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 48 (year 2032),  Features Intersected: Choteau Creek,  Facility Carried by Structure: 29640 396th Avenue
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.9m (48.9ft),  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 7.0m (23.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 1252329,  Location: 1.3 E OF WAGNER (Lat: 43.081522,  Lng: -98.262156),  Route carried "on" structure: State highway 46,  Year Built: 1968,  Status: Open,  Structure Length: 6.37m (20.90ft),  Average Daily Traffic: 1,556 (year 2021),  Truck Traffic: 12%,  Average Future Daily Traffic: 2,245 (year 2041),  Design Load: HS 20,  Features Intersected: CHOTEAU CK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 467.997,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 13.0m (42.7ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.2m (46.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 63.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: June 2020,  Underwater Inspection Date: August 2018,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete
Find on map >>   Show street view

Structure Number: 1253029,  Location: 2.0 E OF WAGNER (Lat: 43.081439,  Lng: -98.248800),  Route carried "on" structure: State highway 46,  Year Built: 1968,  Status: Open,  Structure Length: 0.77m (2.53ft),  Average Daily Traffic: 1,556 (year 2021),  Truck Traffic: 12%,  Average Future Daily Traffic: 2,245 (year 2041),  Design Load: HS 20,  Features Intersected: CK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 469.027,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 15.5m (50.9ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 88.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: July 2018
Find on map >>   Show street view

Structure Number: 1253428,  Location: 1.0N & 2.4E of Wagner (Lat: 43.095958,  Lng: -98.239514),  Route carried "on" structure: Other road ,  Year Built: 1912,  Status: Posted for load,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 48 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 48 (year 2032),  Features Intersected: Creek,  Facility Carried by Structure: 39740 296th Street
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 4.8m (15.7ft),  Out-to-Out Width: 5.0m (16.4ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 9.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 5.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $467,000,  Roadway Improvement Cost: $30,000,  Total Project Cost: $497,000 ( Estimate for 2019),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Discuss Wagner, South Dakota (SD) on our hugely popular South Dakota forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.