Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Westbury, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 38Number of bridges
  • 220ft / 66.7mTotal length
  • $108,284,000Total costs
  • 2,061,168Total average daily traffic
  • 1,641Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Westbury
  • No street view available for this location

New bridges in Westbury, NY - historical statistics
  • New bridges - historical statistics
  • 21910-1919
  • 81930-1939
  • 21940-1949
  • 71980-1989
  • 181990-1999
  • 12010-2019
Average Bridge Daily Traffic in Westbury, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 18.8%Very good
  • 37.5%Good
  • 31.3%Satisfactory
  • 12.5%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 26.3%Very good
  • 42.1%Good
  • 31.6%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 10.5%Very good
  • 47.4%Good
  • 42.1%Satisfactory
Find on map >>   Show street view

Structure Number: 1058101,  Location: .1 MI E JCT SH 25 & NSP (Lat: 40.755881,  Lng: -73.618964),  Route carried "on" structure: State highway 908G,  Year Built: 1989,  Status: Open,  Structure Length: 2.99m (9.81ft),  Average Daily Traffic: 76,503 (year 2018),  Average Future Daily Traffic: 91,000 (year 2040),  Design Load: HS 20,  Features Intersected: GLEN COVE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.957,  Lanes on structure: 3,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 29.2m (95.8ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 16.1m (52.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.98m (9.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $3,794,000,  Roadway Improvement Cost: $2,222,000,  Total Project Cost: $6,016,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1058102,  Location: .1 MI E JCT SH 25 & NSP (Lat: 40.755656,  Lng: -73.618889),  Route carried "on" structure: State highway 908G,  Year Built: 1938,  Status: Open,  Structure Length: 2.96m (9.71ft),  Average Daily Traffic: 76,503 (year 2018),  Average Future Daily Traffic: 91,000 (year 2040),  Design Load: H 20,  Features Intersected: GLEN COVE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.957,  Lanes on structure: 2,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 26.8m (87.9ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 17.7m (58.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 67.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 25.3 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.95m (9.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $3,626,000,  Roadway Improvement Cost: $2,123,000,  Total Project Cost: $5,749,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 105812,  Location: .9 MI E JCT RTE 25 & NSP (Lat: 40.758981,  Lng: -73.604867),  Route carried "on" structure: Other road ,  Year Built: 1998,  Status: Open,  Structure Length: 4.48m (14.70ft),  Average Daily Traffic: 3,493 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 4,321 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: 908G908G03011077 E/B, RT,  Facility Carried by Structure: CARLE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.048,  Lanes on structure: 2,  Lanes under structure: 7,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 22.8m (74.8ft),  Curb or Sidewalk Widths: Left: 3.1m (10.2ft),  Right: 3.1m (10.2ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 17.8m (58.4ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Operating Rating: 86.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.48m (14.70ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $3,194,000,  Roadway Improvement Cost: $1,871,000,  Total Project Cost: $5,065,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 105813,  Location: 1.1 MI E JCT RTE 25 & NSP (Lat: 40.759875,  Lng: -73.601061),  Route carried "on" structure: Other road ,  Year Built: 1998,  Status: Open,  Structure Length: 4.11m (13.48ft),  Average Daily Traffic: 4,721 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 5,841 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: 908G908G03011079 E/B, RT,  Facility Carried by Structure: ELLISON AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.545,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 19.5m (64.0ft),  Curb or Sidewalk Widths: Left: 2.5m (8.2ft),  Right: 2.5m (8.2ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 16.6m (54.5ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 82.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.11m (13.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $2,867,000,  Roadway Improvement Cost: $1,679,000,  Total Project Cost: $4,547,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 105814,  Location: 1.4 MI E JCT RTE 25 & NSP (Lat: 40.761458,  Lng: -73.596083),  Route carried "on" structure: Other road ,  Year Built: 1998,  Status: Open,  Structure Length: 4.11m (13.48ft),  Average Daily Traffic: 244 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 342 (year 2037),  Design Load: HS 25 or greater,  Features Intersected: 908G908G03011081 E/B, RT,  Facility Carried by Structure: HICKS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.032,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 19.5m (64.0ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 75.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.11m (13.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $1,741,000,  Roadway Improvement Cost: $1,020,000,  Total Project Cost: $2,761,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 105815,  Location: 1.6 MI E JCT RTE 25 & NSP (Lat: 40.762731,  Lng: -73.590308),  Route carried "on" structure: Other road ,  Year Built: 1998,  Status: Open,  Structure Length: 4.63m (15.19ft),  Average Daily Traffic: 1,420 (year 2017),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,988 (year 2037),  Design Load: HS 25 or greater,  Features Intersected: 908G908G03011084, E/B, R,  Facility Carried by Structure: FULTON STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.772,  Lanes on structure: 2,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 21.9m (71.9ft),  Curb or Sidewalk Widths: Left: 3.1m (10.2ft),  Right: 3.1m (10.2ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 16.6m (54.5ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 77.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.63m (15.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $3,033,000,  Roadway Improvement Cost: $1,776,000,  Total Project Cost: $4,810,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 105816,  Location: 1.9 MI E JCT RTE 25 & NSP (Lat: 40.763586,  Lng: -73.586758),  Route carried "on" structure: County highway ,  Year Built: 1998,  Status: Open,  Structure Length: 4.51m (14.80ft),  Average Daily Traffic: 19,541 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 23,738 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: 908G908G03011087 E/B, RT,  Facility Carried by Structure: POST ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.373,  Lanes on structure: 5,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 21.3m (69.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 18.3m (60.0ft),  Out-to-Out Width: 24.0m (78.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 76.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.51m (14.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $4,557,000,  Roadway Improvement Cost: $2,668,000,  Total Project Cost: $7,225,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1058179,  Location: 2.2 MI E JCT SH 25 & NSP (Lat: 40.765142,  Lng: -73.581994),  Route carried "on" structure: State highway 908G,  Year Built: 1938,  Status: Open,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 102,949 (year 2020),  Average Future Daily Traffic: 122,457 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: CAMBRIDGE AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.304,  Lanes on structure: 7,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 35.3m (115.8ft),  Skew: 21 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.2m (53.1ft),  Curb-To-Curb Width: 35.4m (116.1ft),  Out-to-Out Width: 38.6m (126.6ft)

Condition: Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 57.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.73m (5.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Bridge Improvement Cost: $3,818,000,  Roadway Improvement Cost: $2,236,000,  Total Project Cost: $6,054,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Membrane: Other
Find on map >>   Show street view

Structure Number: 105818,  Location: 2.5 MI E JCT RTE 25 & NSP (Lat: 40.766681,  Lng: -73.576894),  Route carried "on" structure: Other road ,  Year Built: 1998,  Status: Open,  Structure Length: 4.15m (13.62ft),  Average Daily Traffic: 2,375 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 2,938 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: 908G908G03011092 E/B, RT,  Facility Carried by Structure: POWELLS LANE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.628,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 19.5m (64.0ft),  Curb or Sidewalk Widths: Left: 2.5m (8.2ft),  Right: 2.5m (8.2ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 16.6m (54.5ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 76.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.14m (13.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $2,890,000,  Roadway Improvement Cost: $1,692,000,  Total Project Cost: $4,582,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1058199,  Location: JCT NSP + WSP (Lat: 40.771100,  Lng: -73.566644),  Route carried "on" structure: State highway 908T,  Year Built: 1938,  Status: Open,  Structure Length: 3.13m (10.27ft),  Average Daily Traffic: 63,133 (year 2019),  Average Future Daily Traffic: 75,096 (year 2040),  Design Load: H 20,  Features Intersected: 908G908G03011098, RTE 90
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.496,  Lanes on structure: 3,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.4m (57.1ft),  Skew: 24 degrees,  Material/Design: Concrete continuous,  Design/Construction: Frame,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 14.3m (46.9ft),  Curb-To-Curb Width: 18.3m (60.0ft),  Out-to-Out Width: 21.3m (69.9ft)

Condition: Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 57.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.13m (10.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Bridge Improvement Cost: $3,805,000,  Roadway Improvement Cost: $2,228,000,  Total Project Cost: $6,033,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 1058209,  Location: .2 MILE EAST JCT NSP &WSP (Lat: 40.771383,  Lng: -73.563750),  Route carried "on" structure: State highway 908G,  Year Built: 1940,  Status: Open,  Structure Length: 2.07m (6.79ft),  Average Daily Traffic: 66,940 (year 2020),  Average Future Daily Traffic: 79,625 (year 2040),  Design Load: H 20,  Features Intersected: BRUSH HOLLOW ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.026,  Lanes on structure: 5,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.4m (66.9ft),  Skew: 23 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.9m (58.7ft),  Curb-To-Curb Width: 21.0m (68.9ft),  Out-to-Out Width: 25.3m (83.0ft)

Condition: Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.07m (6.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Bridge Improvement Cost: $3,529,000,  Roadway Improvement Cost: $2,067,000,  Total Project Cost: $5,595,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1058639,  Location: .1 MI SE JCT NSP & WSP (Lat: 40.770344,  Lng: -73.564689),  Route carried "on" structure: State highway 908T,  Year Built: 1938,  Status: Open,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 63,133 (year 2019),  Average Future Daily Traffic: 75,096 (year 2040),  Design Load: H 20,  Features Intersected: BRUSH HOLLOW ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.319,  Lanes on structure: 6,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 24.7m (81.0ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 26.2m (86.0ft),  Out-to-Out Width: 28.0m (91.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 56.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.1 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.73m (5.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $2,962,000,  Roadway Improvement Cost: $1,734,000,  Total Project Cost: $4,696,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 1059311,  Location: 0.3M E. RTS 25 & NSP (Lat: 40.755664,  Lng: -73.617497),  Route carried "on" structure: State highway 908G,  Year Built: 1989,  Status: Open,  Structure Length: 5.00m (16.40ft),  Average Daily Traffic: 76,503 (year 2018),  Average Future Daily Traffic: 91,000 (year 2040),  Design Load: HS 20,  Features Intersected: MSP N/B TO NSP W/B
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.118,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 47.2m (154.9ft),  Curb-To-Curb Width: 15.1m (49.5ft),  Out-to-Out Width: 16.1m (52.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Satisfactory,  Operating Rating: 82.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.99m (16.37ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $4,887,000,  Roadway Improvement Cost: $2,862,000,  Total Project Cost: $7,749,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1059312,  Location: .3MI E RTE 25 & NSP (Lat: 40.755464,  Lng: -73.617167),  Route carried "on" structure: State highway 908G,  Year Built: 1990,  Status: Open,  Structure Length: 3.54m (11.61ft),  Average Daily Traffic: 76,503 (year 2018),  Average Future Daily Traffic: 91,000 (year 2040),  Design Load: HS 20,  Features Intersected: MSP N/B TO NSP W/B
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.118,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 33.5m (109.9ft),  Curb-To-Curb Width: 15.1m (49.5ft),  Out-to-Out Width: 16.1m (52.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 69.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.53m (11.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $4,831,000,  Roadway Improvement Cost: $2,829,000,  Total Project Cost: $7,660,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 152369,  Location: .2 MILE S JCT SH 25 & NSP (Lat: 40.754944,  Lng: -73.618736),  Route carried "on" structure: Ramp Other road ,  Year Built: 1989,  Status: Open,  Structure Length: 4.57m (14.99ft),  Truck Traffic: 2%,  Design Load: HS 20,  Features Intersected: GLEN COVE ROAD,  Facility Carried by Structure: 908G 908G03116A01
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.451,  Lanes on structure: 2,  Lanes under structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 14.3m (46.9ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 44.1m (144.7ft),  Curb-To-Curb Width: 14.4m (47.2ft),  Out-to-Out Width: 15.5m (50.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 81.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.57m (14.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $4,666,000,  Roadway Improvement Cost: $2,732,000,  Total Project Cost: $7,398,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1523711,  Location: 0.4MI E RTS 25 & NSP (Lat: 40.755828,  Lng: -73.615533),  Route carried "on" structure: State highway 908G,  Year Built: 1989,  Status: Open,  Structure Length: 5.27m (17.29ft),  Average Daily Traffic: 64,335 (year 2019),  Average Future Daily Traffic: 76,526 (year 2040),  Design Load: HS 20,  Features Intersected: 908G 908G03011070
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.231,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 51.5m (169.0ft),  Curb-To-Curb Width: 15.1m (49.5ft),  Out-to-Out Width: 16.1m (52.8ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 73.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.27m (17.29ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $5,013,000,  Roadway Improvement Cost: $2,936,000,  Total Project Cost: $7,949,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1523712,  Location: 0.4MI E RTS 25 & NSP (Lat: 40.755569,  Lng: -73.615803),  Route carried "on" structure: State highway 908G,  Year Built: 1990,  Status: Open,  Structure Length: 3.05m (10.01ft),  Average Daily Traffic: 64,335 (year 2019),  Average Future Daily Traffic: 76,526 (year 2040),  Design Load: HS 20,  Features Intersected: 908G 908G03011070
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.231,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.1m (65.9ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 28.9m (94.8ft),  Curb-To-Curb Width: 20.1m (65.9ft),  Out-to-Out Width: 21.5m (70.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.04m (9.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $5,369,000,  Roadway Improvement Cost: $3,144,000,  Total Project Cost: $8,513,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 152372,  Location: 0.3MI E RTE 25 & NSPWY (Lat: 40.755294,  Lng: -73.616967),  Route carried "on" structure: Ramp Other road ,  Year Built: 1990,  Status: Open,  Structure Length: 2.59m (8.50ft),  Truck Traffic: 2%,  Design Load: HS 20,  Features Intersected: MSP N/B TO NSP W/B,  Facility Carried by Structure: GL COVE RD-NSP E/B
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.145,  Lanes on structure: 1,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.3m (79.7ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 73.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.59m (8.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $1,854,000,  Roadway Improvement Cost: $1,086,000,  Total Project Cost: $2,940,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 226104,  Location: .4 MILE WEST OF WESTBURY (Lat: 40.751222,  Lng: -73.595253),  Route carried "on" structure: Other road ,  Year Built: 2016,  Status: Open,  Structure Length: 2.01m (6.59ft),  Average Daily Traffic: 8,779 (year 2018),  Truck Traffic: 2%,  Average Future Daily Traffic: 10,862 (year 2040),  Design Load: HL 93,  Features Intersected: LONG ISLAND- M.L.,  Facility Carried by Structure: ELLISON AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.467,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.8m (65.0ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 14.9m (48.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 55.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 34.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 2.01m (6.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,856,000,  Roadway Improvement Cost: $1,087,000,  Total Project Cost: $2,942,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 1058101,  Location: .1 MI E JCT SH 25 & NSP (Lat: 40.755881,  Lng: -73.618964),  Route carried "under" structure: County highway ,  Year Built: 1989,  Structure Length: 0. m,  Average Daily Traffic: 43,795 (year 2005),  Features Intersected: GLEN COVE ROAD,  Facility Carried by Structure: RTE 908G
Minimum Vertical Clearance: 5.69m (18.67ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 5,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.2m (95.8ft)

Find on map >>   Show street view

Structure Number: 1058102,  Location: .1 MI E JCT SH 25 & NSP (Lat: 40.755656,  Lng: -73.618889),  Route carried "under" structure: County highway ,  Year Built: 1938,  Structure Length: 0. m,  Average Daily Traffic: 43,795 (year 2005),  Features Intersected: GLEN COVE ROAD,  Facility Carried by Structure: RTE 908G
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Steel,  Design/Construction: Frame,  Length of Maximum Span: 26.8m (87.9ft)

Find on map >>   Show street view

Structure Number: 105812,  Location: .9 MI E JCT RTE 25 & NSP (Lat: 40.758981,  Lng: -73.604867),  Route carried "under" structure: State highway 908G,  Year Built: 1998,  Structure Length: 0. m,  Average Daily Traffic: 136,289 (year 2002),  Features Intersected: 908G908G03011077 E/B, RT,  Facility Carried by Structure: CARLE ROAD
Minimum Vertical Clearance: 4.88m (16.01ft),  Kilometerpoint: 12.309,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 22.8m (74.8ft)

Find on map >>   Show street view

Structure Number: 105813,  Location: 1.1 MI E JCT RTE 25 & NSP (Lat: 40.759875,  Lng: -73.601061),  Route carried "under" structure: State highway 908G,  Year Built: 1998,  Structure Length: 0. m,  Average Daily Traffic: 136,289 (year 2002),  Features Intersected: 908G908G03011079 E/B, RT,  Facility Carried by Structure: ELLISON AVENUE
Minimum Vertical Clearance: 5.13m (16.83ft),  Kilometerpoint: 12.663,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 19.5m (64.0ft)

Find on map >>   Show street view

Structure Number: 105814,  Location: 1.4 MI E JCT RTE 25 & NSP (Lat: 40.761458,  Lng: -73.596083),  Route carried "under" structure: State highway 908G,  Year Built: 1998,  Structure Length: 0. m,  Average Daily Traffic: 136,289 (year 2002),  Features Intersected: 908G908G03011081 E/B, RT,  Facility Carried by Structure: HICKS ROAD
Minimum Vertical Clearance: 4.83m (15.85ft),  Kilometerpoint: 13.113,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 19.5m (64.0ft)

Find on map >>   Show street view

Structure Number: 105815,  Location: 1.6 MI E JCT RTE 25 & NSP (Lat: 40.762731,  Lng: -73.590308),  Route carried "under" structure: State highway 908G,  Year Built: 1998,  Structure Length: 0. m,  Average Daily Traffic: 136,289 (year 2002),  Features Intersected: 908G908G03011084, E/B, R,  Facility Carried by Structure: FULTON STREET
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 13.789,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 21.9m (71.9ft)

Find on map >>   Show street view

Structure Number: 105816,  Location: 1.9 MI E JCT RTE 25 & NSP (Lat: 40.763586,  Lng: -73.586758),  Route carried "under" structure: State highway 908G,  Year Built: 1998,  Structure Length: 0. m,  Average Daily Traffic: 136,352 (year 2002),  Features Intersected: 908G908G03011087 E/B, RT,  Facility Carried by Structure: POST ROAD
Minimum Vertical Clearance: 4.78m (15.68ft),  Kilometerpoint: 13.934,  Lanes on structure: 5,  Lanes under structure: 3,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 21.3m (69.9ft)

Find on map >>   Show street view

Structure Number: 1058179,  Location: 2.2 MI E JCT SH 25 & NSP (Lat: 40.765142,  Lng: -73.581994),  Route carried "under" structure: Other road ,  Year Built: 1938,  Structure Length: 0. m,  Average Daily Traffic: 3,000 (year 2021),  Features Intersected: CAMBRIDGE AVENUE,  Facility Carried by Structure: RTE 908G
Minimum Vertical Clearance: 4.60m (15.09ft),  Kilometerpoint: 0.000,  Lanes on structure: 7,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Frame,  Length of Maximum Span: 16.2m (53.1ft)

Find on map >>   Show street view

Structure Number: 105818,  Location: 2.5 MI E JCT RTE 25 & NSP (Lat: 40.766681,  Lng: -73.576894),  Route carried "under" structure: State highway 908G,  Year Built: 1998,  Structure Length: 0. m,  Average Daily Traffic: 136,352 (year 2002),  Features Intersected: 908G908G03011092 E/B, RT,  Facility Carried by Structure: POWELLS LANE
Minimum Vertical Clearance: 4.90m (16.08ft),  Kilometerpoint: 14.835,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 19.5m (64.0ft)

Find on map >>   Show street view

Structure Number: 1058199,  Location: JCT NSP + WSP (Lat: 40.771100,  Lng: -73.566644),  Route carried "under" structure: State highway 908G,  Year Built: 1938,  Structure Length: 0. m,  Average Daily Traffic: 112,527 (year 2002),  Features Intersected: 908G908G03011098, RTE 90,  Facility Carried by Structure: RTE 908T
Minimum Vertical Clearance: 4.32m (14.17ft),  Kilometerpoint: 15.897,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Frame,  Length of Maximum Span: 14.3m (46.9ft)

Find on map >>   Show street view

Structure Number: 1058209,  Location: .2 MILE EAST JCT NSP &WSP (Lat: 40.771383,  Lng: -73.563750),  Route carried "under" structure: County highway ,  Year Built: 1940,  Structure Length: 0. m,  Average Daily Traffic: 9,000 (year 1976),  Features Intersected: BRUSH HOLLOW ROAD,  Facility Carried by Structure: RTE 908G
Minimum Vertical Clearance: 5.16m (16.93ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Lanes under structure: 4,  Material/Design: Concrete,  Design/Construction: Frame,  Length of Maximum Span: 17.9m (58.7ft)

Find on map >>   Show street view

Structure Number: 1058639,  Location: .1 MI SE JCT NSP & WSP (Lat: 40.770344,  Lng: -73.564689),  Route carried "under" structure: County highway ,  Year Built: 1938,  Structure Length: 0. m,  Average Daily Traffic: 9,000 (year 1976),  Features Intersected: BRUSH HOLLOW ROAD,  Facility Carried by Structure: RTE 908T
Minimum Vertical Clearance: 4.80m (15.75ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 4,  Material/Design: Concrete,  Design/Construction: Frame,  Length of Maximum Span: 15.2m (49.9ft)

Find on map >>   Show street view

Structure Number: 1059311,  Location: 0.3M E. RTS 25 & NSP (Lat: 40.755664,  Lng: -73.617497),  Route carried "under" structure: Other road ,  Year Built: 1989,  Structure Length: 0. m,  Average Daily Traffic: 40,918 (year 2005),  Features Intersected: MSP N/B TO NSP W/B,  Facility Carried by Structure: RTE 908G
Minimum Vertical Clearance: 4.32m (14.17ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 47.2m (154.9ft)

Find on map >>   Show street view

Structure Number: 1059312,  Location: .3MI E RTE 25 & NSP (Lat: 40.755464,  Lng: -73.617167),  Route carried "under" structure: Other road ,  Year Built: 1990,  Structure Length: 0. m,  Average Daily Traffic: 40,918 (year 2005),  Features Intersected: MSP N/B TO NSP W/B,  Facility Carried by Structure: RTE 908G
Minimum Vertical Clearance: 5.87m (19.26ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.5m (109.9ft)

Find on map >>   Show street view

Structure Number: 152369,  Location: .2 MILE S JCT SH 25 & NSP (Lat: 40.754944,  Lng: -73.618736),  Route carried "under" structure: County highway ,  Year Built: 1989,  Structure Length: 0. m,  Average Daily Traffic: 43,795 (year 2005),  Features Intersected: GLEN COVE ROAD,  Facility Carried by Structure: 908G 908G03116A01
Minimum Vertical Clearance: 5.71m (18.73ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 44.1m (144.7ft)

Find on map >>   Show street view

Structure Number: 1523712,  Location: 0.4MI E RTS 25 & NSP (Lat: 40.755569,  Lng: -73.615803),  Route carried "under" structure: State highway ,  Year Built: 1990,  Structure Length: 0. m,  Average Daily Traffic: 75,700 (year 1980),  Features Intersected: 908G 908G03011070,  Facility Carried by Structure: RTE 908G
Minimum Vertical Clearance: 4.50m (14.76ft),  Kilometerpoint: 11.263,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 28.9m (94.8ft)

Find on map >>   Show street view

Structure Number: 152372,  Location: 0.3MI E RTE 25 & NSPWY (Lat: 40.755294,  Lng: -73.616967),  Route carried "under" structure: Other road ,  Year Built: 1990,  Structure Length: 0. m,  Average Daily Traffic: 14,450 (year 1997),  Features Intersected: MSP N/B TO NSP W/B,  Facility Carried by Structure: GL COVE RD-NSP E/B
Minimum Vertical Clearance: 7.47m (24.51ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.3m (79.7ft)

Find on map >>   Show street view

Structure Number: 7709181,  Location: AT WESTBURY (Lat: 40.752994,  Lng: -73.587831),  Route carried "under" structure: County highway ,  Year Built: 1914,  Structure Length: 0. m,  Average Daily Traffic: 17,500 (year 1977),  Features Intersected: POST AVE,  Facility Carried by Structure: LIRR MAIN LINE
Minimum Vertical Clearance: 3.91m (12.83ft),  Kilometerpoint: 0.000,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 18.8m (61.7ft)

Find on map >>   Show street view

Structure Number: 7709182,  Location: AT WESTBURY (Lat: 40.752953,  Lng: -73.587831),  Route carried "under" structure: County highway ,  Year Built: 1914,  Structure Length: 0. m,  Average Daily Traffic: 17,500 (year 1977),  Features Intersected: POST AVE,  Facility Carried by Structure: LIRR MAIN LINE
Minimum Vertical Clearance: 3.91m (12.83ft),  Kilometerpoint: 0.000,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 18.8m (61.7ft)

Discuss Westbury, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.