Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Westmoreland, New Hampshire (NH)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 18Number of bridges
  • 72ft / 22.1mTotal length
  • $56,556,000Total costs
  • 36,770Total average daily traffic
  • 2,490Total average daily truck traffic
  • 54,409Total future (year 2042) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Westmoreland
  • No street view available for this location

New bridges in Westmoreland, NH - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 51930-1939
  • 41940-1949
  • 11960-1969
  • 21980-1989
  • 11990-1999
  • 12000-2009
  • 32010-2019
Reconstructed bridges in Westmoreland, NH - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11960-1969
  • 01970-1979
  • 31980-1989
  • 01990-1999
  • 22000-2009
Average Bridge Daily Traffic in Westmoreland, NH
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 7.1%Excellent
  • 14.3%Very good
  • 57.1%Good
  • 7.1%Satisfactory
  • 7.1%Fair
  • 7.1%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 7.1%Excellent
  • 14.3%Very good
  • 57.1%Good
  • 7.1%Satisfactory
  • 7.1%Fair
  • 7.1%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 7.1%Very good
  • 35.7%Good
  • 28.6%Satisfactory
  • 14.3%Fair
  • 14.3%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 11.1%Very good
  • 27.8%Good
  • 38.9%Satisfactory
  • 11.1%Fair
  • 11.1%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 25.0%Very good
  • 25.0%Good
  • 25.0%Satisfactory
  • 25.0%Poor
Find on map >>   Show street view

Structure Number: 272006900082,  Location: 2.35 MI CHESTERFLD TL (Lat: 42.961492,  Lng: -72.485972),  Route carried "on" structure: Other road ,  Year Built: 1984,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 81 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 119 (year 2042),  Features Intersected: OX BROOK,  Facility Carried by Structure: POOCHAM ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.726,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 89.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.73m (2.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 272007100088,  Location: 1.8 Mi Fr. NH 63 (Lat: 42.966886,  Lng: -72.483058),  Route carried "on" structure: Other road ,  Year Built: 1986,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 295 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 436 (year 2042),  Features Intersected: OX BROOK,  Facility Carried by Structure: RIVER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.259,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft)

Condition: Channel: Satisfactory,  Culverts: Very good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 89.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.73m (2.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 2720089001,  Location: 0.72 MI NH63 (Lat: 42.974453,  Lng: -72.464519),  Route carried "on" structure: Other road ,  Year Built: 1937,  Status: Temporarily open,  Structure Length: 4.49m (14.73ft),  Average Daily Traffic: 1,098 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,625 (year 2042),  Features Intersected: PARTRIDGE BROOK,  Facility Carried by Structure: RIVER ROAD SOUTH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.149,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Wood or Timber,  Design/Construction: Slab,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 6.5m (21.3ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 52.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 29.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 4.49m (14.73ft),  Designated Inspection Frequency: Every 16 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 272009000098,  Location: 1.2MI NH 63 (Lat: 42.973275,  Lng: -72.464531),  Route carried "on" structure: Other road ,  Year Built: 1930,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 241 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 356 (year 2042),  Features Intersected: PARTRIDGE BROOK,  Facility Carried by Structure: PARTRIDGE BROOK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.076,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.7m (35.1ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 25.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 16.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.37m (4.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 272010200088,  Location: 1.48MI NH 63 (Lat: 42.967678,  Lng: -72.452078),  Route carried "on" structure: Other road ,  Year Built: 1936,  Year Reconstructed: 2007,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 10 (year 2004),  Truck Traffic: 4%,  Average Future Daily Traffic: 14 (year 2042),  Design Load: HS 20,  Features Intersected: PARTRIDGE BROOK,  Facility Carried by Structure: BESSIE PIERCE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.419,  Lanes on structure: 1,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.9m (39.0ft),  Curb-To-Curb Width: 4.8m (15.7ft),  Out-to-Out Width: 4.8m (15.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Good,  Operating Rating: 33.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.34m (4.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 272010700163,  Location: 0.57MI NH12 (Lat: 43.019711,  Lng: -72.446372),  Route carried "on" structure: Other road ,  Year Built: 2014,  Status: Open,  Structure Length: 1.55m (5.09ft),  Average Daily Traffic: 88 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 130 (year 2042),  Design Load: HL 93,  Features Intersected: ALDRICH BROOK,  Facility Carried by Structure: RIVER ROAD NORTH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.904,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.6m (47.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 6.4m (21.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 55.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 42.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.55m (5.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 272010900124,  Location: 1.3 MI FROM JCT RTE 12 (Lat: 42.991586,  Lng: -72.445433),  Route carried "on" structure: State highway 63,  Year Built: 1930,  Year Reconstructed: 1986,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 936 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,385 (year 2042),  Design Load: H 15,  Features Intersected: MILL BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 32.744,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.7m (31.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Poor,  Operating Rating: 45.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 27.9 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 272011100072,  Location: 2.0 MI FM CHESTERFIELD TL (Lat: 42.954761,  Lng: -72.444094),  Route carried "on" structure: State highway 63,  Year Built: 1969,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 1,369 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 2,026 (year 2042),  Design Load: HS 20,  Features Intersected: PARTRIDGE BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 27.692,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 61.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.73m (2.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 272012400061,  Location: 1.51 MI. NH63 (Lat: 42.946833,  Lng: -72.430600),  Route carried "on" structure: Other road ,  Year Built: 1932,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 57 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 84 (year 2042),  Features Intersected: PARTRIDGE BROOK,  Facility Carried by Structure: HATT ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.390,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb-To-Curb Width: 5.8m (19.0ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 25.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 16.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.73m (2.40ft),  Designated Inspection Frequency: Every 16 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 272012500122,  Location: 2.5 MI TO WALPOLE TL (Lat: 42.990050,  Lng: -72.428778),  Route carried "on" structure: State highway 12,  Year Built: 1948,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 6,291 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 9,310 (year 2042),  Design Load: H 20,  Features Intersected: MILL BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 46.777,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 29.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 272013700127,  Location: 0.02MI NH12 (Lat: 42.993661,  Lng: -72.417650),  Route carried "on" structure: Other road ,  Year Built: 1996,  Status: Open,  Structure Length: 1.95m (6.40ft),  Average Daily Traffic: 81 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 119 (year 2042),  Design Load: HS 20,  Features Intersected: MILL BROOK,  Facility Carried by Structure: ALDRICH ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.029,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.6m (61.0ft),  Curb-To-Curb Width: 5.2m (17.1ft),  Out-to-Out Width: 6.2m (20.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 56.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.95m (6.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 272014500131,  Location: 3.5 MI TO WALPOLE TL (Lat: 42.995869,  Lng: -72.409814),  Route carried "on" structure: State highway 12,  Year Built: 1928,  Year Reconstructed: 2013,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 6,291 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 9,310 (year 2042),  Design Load: HL 93,  Features Intersected: MILL BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 44.906,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.6m (15.1ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 60.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 47.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.13m (3.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 272015100125,  Location: 0.09MI NH 12 (Lat: 42.993661,  Lng: -72.406772),  Route carried "on" structure: Other road ,  Year Built: 2015,  Status: Open,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 81 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 119 (year 2042),  Features Intersected: MILL BROOK,  Facility Carried by Structure: MAKINEN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.142,  Lanes on structure: 1,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 4.9m (16.1ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Satisfactory,  Channel: Poor,  Operating Rating: 42.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.58m (5.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Other
Find on map >>   Show street view

Structure Number: 272015800123,  Location: 0.16MI NH12 (Lat: 42.990267,  Lng: -72.397014),  Route carried "on" structure: Other road ,  Year Built: 2005,  Status: Open,  Structure Length: 1.02m (3.35ft),  Average Daily Traffic: 81 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 119 (year 2042),  Design Load: HS 20,  Features Intersected: MILL BROOK,  Facility Carried by Structure: OLD MILL BROOK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.259,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.0m (29.5ft),  Curb-To-Curb Width: 5.1m (16.7ft),  Out-to-Out Width: 5.5m (18.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 82.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.02m (3.35ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 272015900125,  Location: 4.3 MI TO WALPOLE TL (Lat: 42.991253,  Lng: -72.396039),  Route carried "on" structure: State highway 12,  Year Built: 1941,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 6,291 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 9,310 (year 2042),  Design Load: H 15,  Features Intersected: MILL BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 43.650,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft)

Condition: Channel: Fair,  Culverts: Poor,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 20.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.64m (2.10ft),  Designated Inspection Frequency: Every 8 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 272016300124,  Location: 1.73 MI FROM SURRY TL (Lat: 42.990917,  Lng: -72.393553),  Route carried "on" structure: State highway 12,  Year Built: 1941,  Year Reconstructed: 1973,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 6,291 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 9,310 (year 2042),  Design Load: H 15,  Features Intersected: MILL BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 43.446,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 48.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.67m (2.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 27201670012,  Location: 0.02MI. RTE 12 (Lat: 42.989822,  Lng: -72.389842),  Route carried "on" structure: Other road ,  Year Built: 2015,  Status: Open,  Structure Length: 0.81m (2.66ft),  Average Daily Traffic: 897 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,327 (year 2042),  Features Intersected: MILL BROOK,  Facility Carried by Structure: SOUTH VILLAGE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.871,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.2m (23.6ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 68.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.81m (2.66ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 272016700122,  Location: 1.3 MI SURRY TL (Lat: 42.990353,  Lng: -72.390056),  Route carried "on" structure: State highway 12,  Year Built: 1941,  Year Reconstructed: 1987,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 6,291 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 9,310 (year 2042),  Design Load: HS 25 or greater,  Features Intersected: WHITE BRIDGE BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 43.151,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 89.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Discuss Westmoreland, New Hampshire (NH) on our hugely popular New Hampshire forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.