Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Willapa, Washington (WA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 13Number of bridges
  • 184ft / 55.5mTotal length
  • $22,640,000Total costs
  • 7,406Total average daily traffic
  • 1,079Total average daily truck traffic
  • 12,020Total future (year 2038) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Willapa
  • No street view available for this location

New bridges in Willapa, WA - historical statistics
  • New bridges - historical statistics
  • 11910-1919
  • 11970-1979
  • 21980-1989
  • 61990-1999
  • 22010-2019
  • 12020-2022
Average Bridge Truck Traffic in Willapa, WA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 27.3%Very good
  • 63.6%Good
  • 9.1%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 63.6%Very good
  • 27.3%Good
  • 9.1%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 54.5%Very good
  • 36.4%Good
  • 9.1%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 61.5%Very good
  • 15.4%Good
  • 15.4%Satisfactory
  • 7.7%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 50.0%Very good
  • 50.0%Fair
Find on map >>   Show street view

Structure Number: 18464A,  Location: 7.0 E JCT US 101 (Lat: 46.612361,  Lng: -123.640500),  Route carried "on" structure: State highway 6,  Year Built: 2014,  Status: Open,  Structure Length: 8.38m (27.49ft),  Average Daily Traffic: 2,510 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 3,052 (year 2039),  Design Load: HL 93,  Features Intersected: WILLAPA RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.201,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 38.1m (125.0ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 11.9m (39.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 47.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.38m (27.49ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: April 2018,  Bridge Improvement Cost: $2,090,000,  Roadway Improvement Cost: $418,000,  Total Project Cost: $4,180,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 79821,  Location: 5.9 SE JCT 6 & 101 (Lat: 46.647194,  Lng: -123.641889),  Route carried "on" structure: County highway 69800,  Year Built: 1977,  Status: Open,  Structure Length: 2.99m (9.81ft),  Average Daily Traffic: 132 (year 2021),  Truck Traffic: 30%,  Average Future Daily Traffic: 800 (year 2039),  Design Load: HS 20,  Features Intersected: MILL CREEK,  Facility Carried by Structure: MILL CREEK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 28.0m (91.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Poor,  Operating Rating: 28.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.99m (9.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $588,000,  Roadway Improvement Cost: $118,000,  Total Project Cost: $1,176,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 83595,  Location: 4.4 E JCT 101 105 (Lat: 46.677667,  Lng: -123.662889),  Route carried "on" structure: County highway 67510,  Year Built: 1992,  Status: Open,  Structure Length: 2.44m (8.01ft),  Average Daily Traffic: 270 (year 2020),  Truck Traffic: 20%,  Average Future Daily Traffic: 400 (year 2042),  Design Load: HS 20,  Features Intersected: WHITCOMB CREEK,  Facility Carried by Structure: WILSON CREEK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 6 degrees,  Material/Design: Concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.3m (73.2ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.44m (8.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $480,000,  Roadway Improvement Cost: $96,000,  Total Project Cost: $960,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 83649,  Location: 3.1 E JCT 6 & 101 (Lat: 46.665000,  Lng: -123.674167),  Route carried "on" structure: County highway 96190,  Year Built: 1984,  Status: Posted for load,  Structure Length: 14.17m (46.49ft),  Average Daily Traffic: 460 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 900 (year 2039),  Design Load: H 15,  Features Intersected: NORTH FORK WILLAPA RIVER,  Facility Carried by Structure: CAMP ONE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 13,  Length of Maximum Span: 29.0m (95.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 18.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 13.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 14.17m (46.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $2,790,000,  Roadway Improvement Cost: $558,000,  Total Project Cost: $5,580,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 83691,  Location: 4.0 E JCT 105 & 101 (Lat: 46.677333,  Lng: -123.669556),  Route carried "on" structure: County highway 96100,  Year Built: 1992,  Status: Open,  Structure Length: 3.96m (12.99ft),  Average Daily Traffic: 848 (year 2018),  Truck Traffic: 15%,  Average Future Daily Traffic: 1,000 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: WILSON CREEK,  Facility Carried by Structure: MONOHAN LANDING RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 37.5m (123.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $780,000,  Roadway Improvement Cost: $156,000,  Total Project Cost: $1,560,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 83696,  Location: 4.4 E JCT 105 101 (Lat: 46.671333,  Lng: -123.669222),  Route carried "on" structure: County highway 96100,  Year Built: 1981,  Status: Open,  Structure Length: 5.55m (18.21ft),  Average Daily Traffic: 1,943 (year 2018),  Truck Traffic: 20%,  Average Future Daily Traffic: 3,000 (year 2039),  Design Load: HS 20,  Features Intersected: NORTH FORK WILLAPA RIVER,  Facility Carried by Structure: MONOHON LANDING RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 3,  Length of Maximum Span: 34.4m (112.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 11.2m (36.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 34.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 5.55m (18.21ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $1,092,000,  Roadway Improvement Cost: $218,000,  Total Project Cost: $2,184,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 84233,  Location: 5.0 SE JCT 6 & 101 (Lat: 46.650167,  Lng: -123.653611),  Route carried "on" structure: County highway 96190,  Year Built: 1991,  Status: Open,  Structure Length: 7.32m (24.02ft),  Average Daily Traffic: 450 (year 2018),  Truck Traffic: 30%,  Average Future Daily Traffic: 700 (year 2039),  Design Load: HS 20,  Features Intersected: WILLAPA RIVER NORTH FORK,  Facility Carried by Structure: CAMP ONE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 5 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 22.9m (75.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 35.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 7.32m (24.02ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $1,632,000,  Roadway Improvement Cost: $326,000,  Total Project Cost: $3,264,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 84476,  Location: 3.2 SE JCT 101 & 6 (Lat: 46.664694,  Lng: -123.677694),  Route carried "on" structure: County highway 69550,  Year Built: 1916,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 421 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 800 (year 2039),  Features Intersected: SLOUGH,  Facility Carried by Structure: HECKARD ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 5.3m (17.4ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 24.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 19.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.83m (6.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $600,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $650,000
Find on map >>   Show street view

Structure Number: 86138,  Location: 7.1 SE JCT 6 & 101 (Lat: 46.642972,  Lng: -123.616111),  Route carried "on" structure: County highway 69800,  Year Built: 1995,  Status: Open,  Structure Length: 3.35m (10.99ft),  Average Daily Traffic: 108 (year 2021),  Truck Traffic: 30%,  Average Future Daily Traffic: 800 (year 2039),  Design Load: HS 20,  Features Intersected: MILL CREEK,  Facility Carried by Structure: MILL CREEK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 33.5m (109.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.35m (10.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $660,000,  Roadway Improvement Cost: $132,000,  Total Project Cost: $1,320,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 86149,  Location: 0.04 NE MILL CR RD (Lat: 46.645667,  Lng: -123.630583),  Route carried "on" structure: County highway 69710,  Year Built: 1994,  Status: Open,  Structure Length: 2.13m (6.99ft),  Average Daily Traffic: 10 (year 2021),  Average Future Daily Traffic: 8 (year 2039),  Design Load: HS 20,  Features Intersected: MILL CR,  Facility Carried by Structure: WESLEY KING RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.7m (67.9ft),  Curb-To-Curb Width: 4.9m (16.1ft),  Out-to-Out Width: 5.5m (18.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.13m (6.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $252,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $504,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 86216,  Location: 3.41 S JCT SR 6 (Lat: 46.623944,  Lng: -123.684167),  Route carried "on" structure: County highway 47510,  Year Built: 1996,  Status: Open,  Structure Length: 1.49m (4.89ft),  Average Daily Traffic: 77 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 300 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: RUE CREEK,  Facility Carried by Structure: RUE CREEK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.9m (48.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 39.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.49m (4.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $294,000,  Roadway Improvement Cost: $59,000,  Total Project Cost: $588,000 ( Estimate for 2014),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 88958,  Location: 1.99 SE JCT SR 6 (Lat: 46.609478,  Lng: -123.677658),  Route carried "on" structure: County highway 47510,  Year Built: 2017,  Status: Open,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 47 (year 2017),  Truck Traffic: 4%,  Average Future Daily Traffic: 130 (year 2038),  Design Load: HL 93,  Features Intersected: West Fork Rue Creek,  Facility Carried by Structure: Rue Creek Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.9m (48.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 77.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 59.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.58m (5.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $312,000,  Roadway Improvement Cost: $62,000,  Total Project Cost: $624,000 ( Estimate for 2014),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 89254,  Location: 1.7 SE JCT SR6 (Lat: 46.607222,  Lng: -123.672361),  Route carried "on" structure: County highway 47510,  Year Built: 2021,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 130 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 130 (year 2043),  Design Load: HL 93,  Features Intersected: Rue Creek,  Facility Carried by Structure: Rue Creek Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 2 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 9.3m (30.5ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Channel: Very good,  Culverts: Very good,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.94m (3.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $25,000,  Roadway Improvement Cost: $5,000,  Total Project Cost: $50,000 ( Estimate for 2014),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Discuss Willapa, Washington (WA) on our hugely popular Washington forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.