Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Winchendon, Massachusetts (MA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 12Number of bridges
  • 79ft / 23.9mTotal length
  • $13,256,000Total costs
  • 67,270Total average daily traffic
  • 4,231Total average daily truck traffic
  • 116,507Total future (year 2031) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Winchendon
  • No street view available for this location

New bridges in Winchendon, MA - historical statistics
  • New bridges - historical statistics
  • 1Before 1900
  • 11920-1929
  • 31930-1939
  • 11950-1959
  • 11960-1969
  • 11970-1979
  • 22000-2009
  • 22010-2019
Average Bridge Daily Traffic in Winchendon, MA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 33.3%Very good
  • 22.2%Good
  • 11.1%Satisfactory
  • 22.2%Fair
  • 11.1%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 27.3%Very good
  • 9.1%Good
  • 27.3%Satisfactory
  • 27.3%Fair
  • 9.1%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 27.3%Very good
  • 9.1%Good
  • 36.4%Satisfactory
  • 18.2%Fair
  • 9.1%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 25.0%Very good
  • 33.3%Good
  • 33.3%Satisfactory
  • 8.3%Poor
Find on map >>   Show street view

Structure Number: W39001BNVMUNNBI,  Location: 0.1 MILE NORTH OF WEST ST (Lat: 42.711186,  Lng: -72.085722),  Route carried "on" structure: City street ,  Year Built: 2017,  Status: Open,  Structure Length: 3.70m (12.14ft),  Average Daily Traffic: 50 (year 2013),  Truck Traffic: 6%,  Design Load: HL 93,  Features Intersected: WATER TARBELL BROOK,  Facility Carried by Structure: HWY HARRIS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.145,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 35.0m (114.8ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 55.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 42.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: W390021A7DOTNBI,  Location: 0.25 M W JCT GLENALLEN (Lat: 42.692558,  Lng: -72.019350),  Route carried "on" structure: US 202,  Year Built: 1937,  Status: Posted for load,  Structure Length: 1.39m (4.56ft),  Average Daily Traffic: 6,595 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 9,476 (year 2031),  Design Load: H 20,  Features Intersected: WATER N BR MILLERS RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 125.220,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 6.0m (19.7ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 12.1m (39.7ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Fair,  Channel: Satisfactory,  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.10m (6.89ft),  Designated Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: August 2020,  Other Special Inspection Date: August 2021,  Bridge Improvement Cost: $1,804,000,  Roadway Improvement Cost: $181,000,  Total Project Cost: $2,707,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: W39004180MUNNBI,  Location: E OF JCT RTE12 (Lat: 42.678869,  Lng: -72.031858),  Route carried "on" structure: City street ,  Year Built: 1939,  Status: Open,  Structure Length: 2.07m (6.79ft),  Average Daily Traffic: 12,802 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 18,952 (year 2031),  Features Intersected: WATER MILLERS RIVER,  Facility Carried by Structure: HWY GLENALLEN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.145,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 9.8m (32.2ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 6.4m (21.0ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 51.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.10m (6.89ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: August 2020,  Underwater Inspection Date: June 2021,  Bridge Improvement Cost: $768,000,  Roadway Improvement Cost: $77,000,  Total Project Cost: $1,153,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: W3900516EMUNNBI,  Location: 1.5 MI E ROYALSTON (Lat: 42.684178,  Lng: -72.082972),  Route carried "on" structure: City street ,  Year Built: 1958,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 1,000 (year 2021),  Truck Traffic: 14%,  Average Future Daily Traffic: 409 (year 2032),  Design Load: H 20,  Features Intersected: WATER MILLERS RIVER,  Facility Carried by Structure: HWY RIVER ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.543,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.2m (43.3ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 68.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: Febuary 2021,  Underwater Inspection Date: August 2020,  Bridge Improvement Cost: $468,000,  Roadway Improvement Cost: $47,000,  Total Project Cost: $703,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: W39006181MUNNBI,  Location: N OF JCT RTE202 (Lat: 42.676156,  Lng: -72.067636),  Route carried "on" structure: City street ,  Year Built: 1964,  Status: Open,  Structure Length: 2.07m (6.79ft),  Average Daily Traffic: 2,069 (year 2016),  Truck Traffic: 3%,  Average Future Daily Traffic: 4,106 (year 2031),  Design Load: H 20,  Features Intersected: WATER MILLERS RIVER,  Facility Carried by Structure: HWY BROWN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.080,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.3m (63.3ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 10.3m (33.8ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 50.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.10m (6.89ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: August 2020,  Underwater Inspection Date: June 2020,  Bridge Improvement Cost: $850,000,  Roadway Improvement Cost: $86,000,  Total Project Cost: $1,276,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: W39007195DOTNBI,  Location: .2 M S. JCT ST. 12 (Lat: 42.677950,  Lng: -72.061533),  Route carried "on" structure: US 202,  Year Built: 1932,  Status: Open,  Structure Length: 2.45m (8.04ft),  Average Daily Traffic: 6,071 (year 2016),  Truck Traffic: 11%,  Average Future Daily Traffic: 18,478 (year 2031),  Features Intersected: WATER MILLERS RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 120.891,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 7.9m (25.9ft),  Curb or Sidewalk Widths: Left: 1.4m (4.6ft),  Right: 0.0m,  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Superstructure: Fair,  Substructure: Poor,  Channel: Poor,  Inventory Rating: 79.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.50m (8.20ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: October 2020,  Underwater Inspection Date: September 2021,  Bridge Improvement Cost: $1,228,000,  Roadway Improvement Cost: $123,000,  Total Project Cost: $1,843,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: W39012198DOTNBI,  Location: ST 12 SPRING ST/MILLERS R (Lat: 42.680000,  Lng: -72.046914),  Route carried "on" structure: State highway 12,  Year Built: 1927,  Status: Open,  Structure Length: 1.26m (4.13ft),  Average Daily Traffic: 16,680 (year 2015),  Truck Traffic: 10%,  Average Future Daily Traffic: 32,692 (year 2032),  Features Intersected: WATER MILLERS RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 98.467,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.6m (41.3ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 92.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 55.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Underwater Inspection Date: November 2020,  Bridge Improvement Cost: $528,000,  Roadway Improvement Cost: $53,000,  Total Project Cost: $793,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: W3901316DMUNNBI,  Location: 600' S INT WITH ST 12 (Lat: 42.678864,  Lng: -72.048167),  Route carried "on" structure: City street ,  Year Built: 1850,  Year Reconstructed: 1973,  Status: Open,  Structure Length: 3.92m (12.86ft),  Average Daily Traffic: 1,810 (year 2021),  Truck Traffic: 6%,  Average Future Daily Traffic: 3,790 (year 2032),  Design Load: HS 20,  Features Intersected: WATER MILLERS RIVER,  Facility Carried by Structure: HWY HIGH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.307,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 46.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 4.00m (13.12ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: September 2021,  Underwater Inspection Date: June 2020,  Bridge Improvement Cost: $1,556,000,  Roadway Improvement Cost: $156,000,  Total Project Cost: $2,335,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: W39015BQGMUNNBI,  Location: 1.5M W OF RT12 BULLARDVLL (Lat: 42.698417,  Lng: -72.086506),  Route carried "on" structure: City street ,  Year Built: 2019,  Status: Open,  Structure Length: 1.71m (5.61ft),  Average Daily Traffic: 1,000 (year 2019),  Truck Traffic: 6%,  Design Load: HL 93,  Features Intersected: WATER TARBELL BROOK,  Facility Carried by Structure: HWY N ROYLSTN RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.285,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.8m (51.8ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 42.1 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: W39018B1WDOTNBI,  Location: JCT OF ELMWOOD RD (Lat: 42.695397,  Lng: -72.015064),  Route carried "on" structure: US 202,  Year Built: 2008,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 9,310 (year 2015),  Truck Traffic: 2%,  Average Future Daily Traffic: 21,636 (year 2032),  Design Load: HS 25 or greater,  Features Intersected: WATER N BR MILLERS RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 125.751,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.0m (29.5ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.6m (38.1ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 0.0m,  Curb-To-Curb Width: 9.0m (29.5ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 79.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.20m (3.94ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $498,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $748,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: W39021AU1DOTNBI,  Location: .5 MI S JCT ST 140 (Lat: 42.660972,  Lng: -72.001722),  Route carried "on" structure: State highway 12,  Year Built: 2001,  Status: Open,  Structure Length: 1.32m (4.33ft),  Average Daily Traffic: 9,107 (year 2018),  Truck Traffic: 2%,  Average Future Daily Traffic: 5,310 (year 2033),  Design Load: HS 20,  Features Intersected: WATER MILLERS RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 93.959,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.6m (34.8ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 10.6m (34.8ft),  Out-to-Out Width: 11.5m (37.7ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 83.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $370,000,  Roadway Improvement Cost: $38,000,  Total Project Cost: $556,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: W3903617YMUNNBI,  Location: E OF RT202@LAKE MONOMANAC (Lat: 42.704269,  Lng: -72.010728),  Route carried "on" structure: City street ,  Year Built: 1977,  Status: Open,  Structure Length: 1.44m (4.72ft),  Average Daily Traffic: 776 (year 2016),  Average Future Daily Traffic: 1,658 (year 2031),  Features Intersected: WATER N BR MILLERS RIVER,  Facility Carried by Structure: HWY MONOM RD WST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.306,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 2 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.3m (10.8ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 59.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 0.60m (1.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $761,000,  Roadway Improvement Cost: $77,000,  Total Project Cost: $1,142,000 ( Estimate for 2022)
Discuss Winchendon, Massachusetts (MA) on our hugely popular Massachusetts forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.