Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Yardley, Pennsylvania (PA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 24Number of bridges
  • 554ft / 169mTotal length
  • $4,033,000Total costs
  • 217,648Total average daily traffic
  • 13,402Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Yardley
  • No street view available for this location

New bridges in Yardley, PA - historical statistics
  • New bridges - historical statistics
  • 3Before 1900
  • 11900-1909
  • 21920-1929
  • 31930-1939
  • 11940-1949
  • 11970-1979
  • 11980-1989
  • 62010-2019
  • 62020-2022
Reconstructed bridges in Yardley, PA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21980-1989
  • 31990-1999
  • 02000-2009
  • 12010-2019
Average Bridge Daily Traffic in Yardley, PA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 16.7%Excellent
  • 5.6%Very good
  • 33.3%Good
  • 27.8%Satisfactory
  • 16.7%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 33.3%Excellent
  • 16.7%Good
  • 5.6%Satisfactory
  • 38.9%Fair
  • 5.6%Failed
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 16.7%Excellent
  • 16.7%Very good
  • 5.6%Good
  • 22.2%Satisfactory
  • 22.2%Fair
  • 16.7%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 18.8%Very good
  • 37.5%Good
  • 6.3%Satisfactory
  • 37.5%Poor
Find on map >>   Show street view

Structure Number: 6784,  Location: YARDLEY BOROUGH 33D11 (Lat: 40.245194,  Lng: -74.836950),  Route carried "on" structure: State highway 32,  Year Built: 1932,  Year Reconstructed: 1980,  Status: Open,  Structure Length: 2.10m (6.89ft),  Average Daily Traffic: 3,876 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 4,519 (year 2032),  Design Load: HS 20,  Features Intersected: BUCK CREEK,  Facility Carried by Structure: RIVER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.159,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.4m (66.9ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Poor,  Channel: Poor,  Operating Rating: 68.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.80m (9.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $60,000,  Roadway Improvement Cost: $175,000,  Total Project Cost: $804,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 6785,  Location: NORTH OF YARDLEY 33C09 (Lat: 40.255739,  Lng: -74.847981),  Route carried "on" structure: State highway 32,  Year Built: 1928,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 3,876 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 4,519 (year 2032),  Design Load: H 15,  Features Intersected: TRIB DELAWARE RIVER,  Facility Carried by Structure: RIVER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.760,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Poor,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.80m (5.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $38,000,  Roadway Improvement Cost: $112,000,  Total Project Cost: $513,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 6786,  Location: 2MI.N.OF TR-332 33A07 (Lat: 40.267644,  Lng: -74.856456),  Route carried "on" structure: State highway 32,  Year Built: 1929,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 3,876 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 4,519 (year 2032),  Design Load: H 15,  Features Intersected: DYERS CREEK,  Facility Carried by Structure: RIVER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.990,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 0.0m,  Curb-To-Curb Width: 7.7m (25.3ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Poor,  Operating Rating: 78.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.80m (2.62ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $24,000,  Roadway Improvement Cost: $87,000,  Total Project Cost: $329,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 7013,  Location: YARDLEY BOROUGH 33D11 (Lat: 40.243294,  Lng: -74.837878),  Route carried "on" structure: State highway 332,  Year Built: 1932,  Year Reconstructed: 1986,  Status: Open,  Structure Length: 1.55m (5.09ft),  Average Daily Traffic: 4,789 (year 2022),  Truck Traffic: 3%,  Average Future Daily Traffic: 5,449 (year 2032),  Design Load: HS 25 or greater,  Features Intersected: DELAWARE CANAL/3151-F2,  Facility Carried by Structure: EAST AFTON AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 26.321,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.2m (49.9ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 79.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.20m (7.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $5,000,  Roadway Improvement Cost: $15,000,  Total Project Cost: $70,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 7313,  Location: IN YARDLEY BOROUGH 33D11 (Lat: 40.244225,  Lng: -74.841542),  Route carried "on" structure: State highway ,  Year Built: 1931,  Status: Open,  Structure Length: 2.01m (6.59ft),  Average Daily Traffic: 8,065 (year 2022),  Truck Traffic: 5%,  Average Future Daily Traffic: 11,774 (year 2032),  Design Load: H 20,  Features Intersected: BUCK CREEK,  Facility Carried by Structure: NORTH MAIN STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.272,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 8.8m (28.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Poor,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.70m (8.86ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $63,000,  Roadway Improvement Cost: $185,000,  Total Project Cost: $848,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 7318,  Location: WASHINGTON XING. 32K04 (Lat: 40.281375,  Lng: -74.866072),  Route carried "on" structure: State highway ,  Year Built: 1941,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 9,938 (year 2022),  Truck Traffic: 5%,  Average Future Daily Traffic: 11,214 (year 2032),  Design Load: H 20,  Features Intersected: HOUGHS CREEK / 3039-B6,  Facility Carried by Structure: TAYLORSVILLE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.336,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.0m (36.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Poor,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.80m (5.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $18,000,  Roadway Improvement Cost: $52,000,  Total Project Cost: $240,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 7483,  Location: 0.25 MI SW OF US 32 (Lat: 40.238539,  Lng: -74.831008),  Route carried "on" structure: City street ,  Year Built: 1875,  Year Reconstructed: 1997,  Status: Open,  Structure Length: 1.89m (6.20ft),  Average Daily Traffic: 200 (year 1998),  Average Future Daily Traffic: 200 (year 2013),  Features Intersected: PENNSYLVANIA CANAL,  Facility Carried by Structure: LETCHWORTH AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.3m (4.3ft),  Curb-To-Curb Width: 6.2m (20.3ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 75.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.90m (6.23ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $35,000,  Roadway Improvement Cost: $104,000,  Total Project Cost: $476,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Membrane: Epoxy,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 7507,  Location: 0.15 MI SW OF SR 32 (Lat: 40.240828,  Lng: -74.835008),  Route carried "on" structure: City street ,  Year Built: 1973,  Status: Open,  Structure Length: 2.32m (7.61ft),  Average Daily Traffic: 300 (year 1998),  Average Future Daily Traffic: 420 (year 2011),  Design Load: HS 20,  Features Intersected: PENNSYLVANIA CANAL,  Facility Carried by Structure: EAST COLLEGE AVE.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.6m (74.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Poor,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 3.00m (9.84ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $10,000,  Roadway Improvement Cost: $30,000,  Total Project Cost: $137,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 7648,  Location: WASHINGTON CROSSING PA (Lat: 40.295247,  Lng: -74.868275),  Route carried "on" structure: State highway 2070,  Year Built: 1904,  Year Reconstructed: 2010,  Status: Posted for load,  Structure Length: 26.73m (87.70ft),  Average Daily Traffic: 5,600 (year 2020),  Average Future Daily Traffic: 7,100 (year 2040),  Features Intersected: DELAWARE River
Minimum Vertical Clearance: 4.30m (14.11ft),  Kilometerpoint: 0.129,  Lanes on structure: 2,  Owner: Local Toll Authority,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 43.6m (143.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.1m (3.6ft),  Curb-To-Curb Width: 4.6m (15.1ft),  Out-to-Out Width: 4.8m (15.7ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 8.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 5.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 27.20m (89.24ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: April 2020,  Critical Feature Inspection Date: April 2020,  Underwater Inspection Date: November 2016,  Other Special Inspection Date: April 2021,  Bridge Improvement Cost: $31,000,  Roadway Improvement Cost: $91,000,  Total Project Cost: $416,000,  Deck Structure Type: Open Grating
Find on map >>   Show street view

Structure Number: 7717,  Location: 900 FT EAST OF SR 2071 (Lat: 40.257697,  Lng: -74.852297),  Route carried "on" structure: State lands road ,  Year Built: 1986,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 830 (year 2010),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,105 (year 2030),  Design Load: HS 20,  Features Intersected: DELAWARE CANAL,  Facility Carried by Structure: WOODSIDE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Park, Forest, or Reservation Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 81.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.50m (4.92ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: March 2021,  Underwater Inspection Date: March 2019,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 7718,  Location: 50 FT EAST OF SR 2071 (Lat: 40.268900,  Lng: -74.860297),  Route carried "on" structure: City street ,  Year Built: 1832,  Year Reconstructed: 2002,  Status: Open,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 660 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 890 (year 2032),  Design Load: HL 93,  Features Intersected: DELAWARE CANAL,  Facility Carried by Structure: MT. EYRE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Park, Forest, or Reservation Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 6.8m (22.3ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.30m (7.55ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 7722,  Location: SE OF TAYLORSVILLE (Lat: 40.284397,  Lng: -74.870500),  Route carried "on" structure: ServiceState lands road ,  Year Built: 1832,  Year Reconstructed: 1990,  Status: Closed,  Structure Length: 1.43m (4.69ft),  Average Daily Traffic: 40 (year 2013),  Average Future Daily Traffic: 42 (year 2035),  Design Load: H 15,  Features Intersected: DELAWARE CANAL,  Facility Carried by Structure: TEBOLA BEANS BRIDG
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: State Park, Forest, or Reservation Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.0m (45.9ft),  Curb-To-Curb Width: 3.5m (11.5ft),  Out-to-Out Width: 3.7m (12.1ft)

Condition: Deck: Fair,  Superstructure: Failed,  Substructure: Poor,  Channel: Good,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.20m (7.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Total Project Cost: $200,000,  Deck Structure Type: Wood or Timber
Find on map >>   Show street view

Structure Number: 57065,  Location: 0.5 MI N OF YARDLEY BORO (Lat: 40.255028,  Lng: -74.854333),  Route carried "on" structure: Interstate 295,  Year Built: 2019,  Status: Open,  Structure Length: 3.26m (10.70ft),  Average Daily Traffic: 29,762 (year 2022),  Truck Traffic: 6%,  Average Future Daily Traffic: 38,695 (year 2032),  Design Load: HL 93,  Features Intersected: Taylorsville Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.898,  Lanes on structure: 4,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: Local Toll Authority,  Approaching Roadway Width: 22.3m (73.2ft),  Skew: 20 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 31.7m (104.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 22.3m (73.2ft),  Out-to-Out Width: 23.3m (76.4ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Very good,  Operating Rating: 54.8 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 42.1 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Other,  Deck Protection: Galvanized Reinforcing
Find on map >>   Show street view

Structure Number: 57066,  Location: .5 MI.N.YARDLEY BO.33B09 (Lat: 40.256389,  Lng: -74.851650),  Route carried "on" structure: Interstate 295,  Year Built: 2019,  Status: Open,  Structure Length: 3.54m (11.61ft),  Average Daily Traffic: 29,762 (year 2022),  Truck Traffic: 6%,  Average Future Daily Traffic: 35,000 (year 2038),  Design Load: HL 93,  Features Intersected: PA Canal
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.898,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: Local Toll Authority,  Approaching Roadway Width: 22.3m (73.2ft),  Skew: 31 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 34.4m (112.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 22.3m (73.2ft),  Out-to-Out Width: 23.5m (77.1ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Very good,  Operating Rating: 57.3 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 40.2 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Other,  Deck Protection: Galvanized Reinforcing
Find on map >>   Show street view

Structure Number: 57067,  Location: .5MI.N.YARDLEY BO. 33C08 (Lat: 40.258639,  Lng: -74.847500),  Route carried "on" structure: Interstate 295,  Year Built: 2019,  Status: Open,  Structure Length: 55.90m (183.40ft),  Average Daily Traffic: 30,300 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 36,100 (year 2040),  Design Load: HL 93,  Features Intersected: Del. R, PA 32, NJ 29 SB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.027,  Lanes on structure: 4,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: Local Toll Authority,  Approaching Roadway Width: 22.3m (73.2ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 85.0m (278.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 3.0m (9.8ft),  Curb-To-Curb Width: 22.3m (73.2ft),  Out-to-Out Width: 26.9m (88.3ft)

Condition: Deck: Good,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Good,  Operating Rating: 86.5 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 67.7 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Other,  Deck Protection: Galvanized Reinforcing
Find on map >>   Show street view

Structure Number: 68391,  Location: OVER DELAWARE R (Lat: 40.258628,  Lng: -74.847517),  Route carried "on" structure: Interstate 295,  Year Built: 2021,  Status: Open,  Structure Length: 55.29m (181.40ft),  Average Daily Traffic: 19,382 (year 2021),  Truck Traffic: 6%,  Average Future Daily Traffic: 24,000 (year 2038),  Design Load: HL 93,  Features Intersected: DEL R, PA 32, NJ 29 SB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.898,  Lanes on structure: 5,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: Local Toll Authority,  Approaching Roadway Width: 22.3m (73.2ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 85.0m (278.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 25.4m (83.3ft),  Out-to-Out Width: 27.0m (88.6ft)

Condition: Deck: Good,  Superstructure: Excellent,  Substructure: Very good,  Channel: Good,  Operating Rating: 47.3 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Other,  Deck Protection: Galvanized Reinforcing
Find on map >>   Show street view

Structure Number: 68392,  Location: OVER PA CANAL (Lat: 40.256397,  Lng: -74.851650),  Route carried "on" structure: Interstate 295,  Year Built: 2021,  Status: Open,  Structure Length: 3.54m (11.61ft),  Average Daily Traffic: 19,382 (year 2022),  Truck Traffic: 6%,  Average Future Daily Traffic: 24,000 (year 2038),  Design Load: HL 93,  Features Intersected: PA CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.898,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: Local Toll Authority,  Approaching Roadway Width: 22.3m (73.2ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 34.4m (112.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 22.3m (73.2ft),  Out-to-Out Width: 27.2m (89.2ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Very good,  Operating Rating: 57.3 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 40.2 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Other,  Deck Protection: Galvanized Reinforcing
Find on map >>   Show street view

Structure Number: 68393,  Location: OVERTAYLORSVILLE RD (Lat: 40.255028,  Lng: -74.854322),  Route carried "on" structure: Interstate 295,  Year Built: 2021,  Status: Open,  Structure Length: 3.26m (10.70ft),  Average Daily Traffic: 19,382 (year 2022),  Truck Traffic: 6%,  Average Future Daily Traffic: 30,539 (year 2032),  Design Load: HL 93,  Features Intersected: TAYLORSVILLE RD
Minimum Vertical Clearance: 5.06m (16.60ft),  Kilometerpoint: 16.898,  Lanes on structure: 4,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: Local Toll Authority,  Approaching Roadway Width: 22.3m (73.2ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 31.7m (104.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 22.3m (73.2ft),  Out-to-Out Width: 23.9m (78.4ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Very good,  Operating Rating: 54.8 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 42.1 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Other,  Deck Protection: Galvanized Reinforcing
Find on map >>   Show street view

Structure Number: 57065,  Location: 0.5 MI N OF YARDLEY BORO (Lat: 40.255028,  Lng: -74.854333),  Route carried "under" structure: State highway ,  Year Built: 2019,  Structure Length: 0. m,  Average Daily Traffic: 4,969 (year 2022),  Truck Traffic: 5%,  Features Intersected: Taylorsville Road,  Facility Carried by Structure: INTERSTATE 295 WB
Minimum Vertical Clearance: 5.06m (16.60ft),  Kilometerpoint: 8.035,  Lanes on structure: 4,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 31.7m (104.0ft)

Find on map >>   Show street view

Structure Number: 57065,  Location: 0.5 MI N OF YARDLEY BORO (Lat: 40.255028,  Lng: -74.854333),  Route carried "under" structure: State highway ,  Year Built: 2019,  Structure Length: 0. m,  Average Daily Traffic: 4,969 (year 2022),  Truck Traffic: 5%,  Features Intersected: Taylorsville Road,  Facility Carried by Structure: INTERSTATE 295 WB
Minimum Vertical Clearance: 5.06m (16.60ft),  Kilometerpoint: 8.035,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 31.7m (104.0ft)

Find on map >>   Show street view

Structure Number: 57067,  Location: .5MI.N.YARDLEY BO. 33C08 (Lat: 40.258639,  Lng: -74.847500),  Route carried "under" structure: State highway 32,  Year Built: 2019,  Structure Length: 0. m,  Average Daily Traffic: 3,876 (year 2021),  Truck Traffic: 5%,  Features Intersected: Del. R, PA 32, NJ 29 SB,  Facility Carried by Structure: INTERSTATE 295 WB
Minimum Vertical Clearance: 5.12m (16.80ft),  Kilometerpoint: 10.760,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 85.0m (278.9ft)

Find on map >>   Show street view

Structure Number: 68391,  Location: OVER DELAWARE R (Lat: 40.258628,  Lng: -74.847517),  Route carried "under" structure: State highway 32,  Year Built: 2021,  Structure Length: 0. m,  Average Daily Traffic: 3,876 (year 2021),  Truck Traffic: 5%,  Features Intersected: Del. R, PA 32, NJ 29 SB,  Facility Carried by Structure: INTERSTATE 295 EB
Minimum Vertical Clearance: 5.12m (16.80ft),  Kilometerpoint: 10.760,  Lanes on structure: 5,  Lanes under structure: 2,  Material/Design: Steel continuous,  Length of Maximum Span: 85.0m (278.9ft)

Find on map >>   Show street view

Structure Number: 68393,  Location: OVERTAYLORSVILLE RD (Lat: 40.255028,  Lng: -74.854322),  Route carried "under" structure: State highway ,  Year Built: 2021,  Structure Length: 0. m,  Average Daily Traffic: 4,969 (year 2022),  Truck Traffic: 5%,  Features Intersected: TAYLORSVILLE RD,  Facility Carried by Structure: INTERSTATE 295 EB
Minimum Vertical Clearance: 5.06m (16.60ft),  Kilometerpoint: 8.035,  Lanes on structure: 4,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 31.7m (104.0ft)

Find on map >>   Show street view

Structure Number: 68393,  Location: OVERTAYLORSVILLE RD (Lat: 40.255028,  Lng: -74.854322),  Route carried "under" structure: State highway ,  Year Built: 2021,  Structure Length: 0. m,  Average Daily Traffic: 4,969 (year 2022),  Truck Traffic: 5%,  Features Intersected: TAYLORSVILLE RD,  Facility Carried by Structure: INTERSTATE 295 EB
Minimum Vertical Clearance: 5.06m (16.60ft),  Kilometerpoint: 8.035,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 31.7m (104.0ft)

Discuss Yardley, Pennsylvania (PA) on our hugely popular Pennsylvania forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.