![]() |
Bridge Statistics for Alsip, Illinois (IL) - Condition, Traffic, Stress, Structural Evaluation, Project CostsBack to: Alsip, IL, Illinois, Illinois forum, All US cities. National Bridge Inventory (NBI) Statistics Number of bridges: 20 Total length: 138 meters (453ft) Total costs: $15,780,000 Total average daily traffic: 564,118 Total average daily truck traffic: 57,562 National Bridge Inventory (NBI) Registered Bridges for Alsip
Bridge Condition - Deck Bridge Condition - Superstructure Bridge Condition - Substructure Bridge Condition - Channel Find on map >>
Structure Number: 16042004128, Location: 0.1 M N 127TH (Lat: 41.663000, Lng: -87.738650), Route carried "on" structure: State highway 50, Year Built: 1958, Year Reconstructed: 2002, Status: Open, Structure Length: 8.11m (26.61ft), Average Daily Traffic: 21,200 (year 2007), Truck Traffic: 7%, Average Future Daily Traffic: 49,950 (year 2021), Design Load: HS 20, Features Intersected: I-294 TRI STATE TOLL Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 65.470, Lanes on structure: 4, Lanes under structure: 5, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 35.1m (115.2ft), Skew: 33 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 27.4m (89.9ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 1.5m (4.9ft), Curb-To-Curb Width: 35.1m (115.2ft), Out-to-Out Width: 39.8m (130.6ft) Condition: Deck: Very good, Superstructure: Very good, Substructure: Good, Operating Rating: 83.7 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 50.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Superior to present desirable criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: June 2007, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 16042104129, Location: 0.6 M N IL 83 (Lat: 41.655775, Lng: -87.738392), Route carried "on" structure: State highway 50, Year Built: 1938, Year Reconstructed: 1984, Status: Open, Structure Length: 11.52m (37.80ft), Average Daily Traffic: 42,400 (year 2007), Truck Traffic: 7%, Average Future Daily Traffic: 49,950 (year 2021), Design Load: HS 20, Features Intersected: CAL SAG CHANNEL Minimum Vertical Clearance: 5.26m (17.26ft), Kilometerpoint: 64.650, Lanes on structure: 4, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 13.4m (44.0ft), Navigation Control: Yes ( Vertical Clearance: 7.3m (24.0ft), Horizontal Clearance: 60.3m (197.8ft)), Material/Design: Steel, Design/Construction: Truss - Thru, Number Of Spans In Main Unit: 1, Number Of Approach Spans: 2, Length of Maximum Span: 82.3m (270.0ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 1.5m (4.9ft), Curb-To-Curb Width: 13.3m (43.6ft), Out-to-Out Width: 17.6m (57.7ft) Condition: Deck: Fair, Superstructure: Poor, Substructure: Poor, Channel: Very good, Operating Rating: 53.1 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 33.3 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Meets minimum limits, Deck Geometry: High priority of replacement, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 11.52m (37.80ft), Designated Inspection Frequency: Every 12 months, Critical Feature Inspection Frequency: Every 12 months, Inspection Date: November 2007, Critical Feature Inspection Date: November 2007, Bridge Improvement Cost: $1,307,000, Roadway Improvement Cost: $131,000, Total Project Cost: $1,963,000, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 16056904139, Location: AT 127TH ST (Lat: 41.661483, Lng: -87.752919), Route carried "on" structure: State highway 83, Year Built: 1935, Status: Open, Structure Length: 0.98m (3.22ft), Average Daily Traffic: 32,600 (year 2007), Truck Traffic: 8%, Average Future Daily Traffic: 44,010 (year 2029), Design Load: HS 20, Features Intersected: TINLEY CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 34.223, Lanes on structure: 8, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 11.6m (38.1ft), Skew: 9 degrees, Material/Design: Concrete, Design/Construction: Slab, Number Of Spans In Main Unit: 1, Length of Maximum Span: 9.4m (30.8ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 1.5m (4.9ft), Curb-To-Curb Width: 25.4m (83.3ft), Out-to-Out Width: 28.5m (93.5ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Good, Channel: Good, Operating Rating: 50.4 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 28.8 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: July 2007, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 16057004242, Location: 0.2 M E IL 83 (Lat: 41.661514, Lng: -87.750481), Route carried "on" structure: State highway 83, Year Built: 1968, Year Reconstructed: 1991, Status: Open, Structure Length: 18.60m (61.02ft), Average Daily Traffic: 16,700 (year 2007), Truck Traffic: 8%, Average Future Daily Traffic: 25,000 , Design Load: HS 20, Features Intersected: CAL SAG CHANNEL, Facility Carried by Structure: 127TH ST Minimum Vertical Clearance: 5.49m (18.01ft), Kilometerpoint: 33.998, Lanes on structure: 4, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 14.3m (46.9ft), Skew: 34 degrees, Navigation Control: Yes ( Vertical Clearance: 7.0m (23.0ft), Horizontal Clearance: 68.5m (224.7ft)), Material/Design: Steel, Design/Construction: Truss - Thru, Number Of Spans In Main Unit: 1, Number Of Approach Spans: 4, Length of Maximum Span: 120.7m (396.0ft), Curb or Sidewalk Widths: Left: 2.7m (8.9ft), Right: 2.7m (8.9ft), Curb-To-Curb Width: 16.2m (53.1ft), Out-to-Out Width: 22.6m (74.1ft) Condition: Deck: Good, Superstructure: Fair, Substructure: Fair, Channel: Very good, Operating Rating: 58.5 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 38.7 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Meets minimum limits, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 19.29m (63.29ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Underwater Inspection Frequency: Every 60 months, Inspection Date: April 2006, Critical Feature Inspection Date: April 2006, Underwater Inspection Date: August 2006, Bridge Improvement Cost: $5,413,000, Roadway Improvement Cost: $541,000, Total Project Cost: $8,120,000, Deck Structure Type: Concrete Cast-file-Place Find on map >>
Structure Number: 16074704375, Location: 0.1 M S OF 123RD ST (Lat: 41.667508, Lng: -87.719381), Route carried "on" structure: Other road 3778, Year Built: 1935, Year Reconstructed: 1998, Status: Open, Structure Length: 7.12m (23.36ft), Average Daily Traffic: 24,600 (year 2006), Truck Traffic: 7%, Average Future Daily Traffic: 29,835 (year 2021), Design Load: HS 20, Features Intersected: RR - CSXT, Facility Carried by Structure: CRAWFORD AVE Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 5.953, Lanes on structure: 4, Owner: State Highway Agency, Approaching Roadway Width: 14.3m (46.9ft), Skew: 33 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 19.5m (64.0ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 1.5m (4.9ft), Curb-To-Curb Width: 14.3m (46.9ft), Out-to-Out Width: 19.6m (64.3ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 89.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 61.2 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: High priority of replacement, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 7.74m (25.39ft), Designated Inspection Frequency: Every 36 months, Inspection Date: July 2007, Bridge Improvement Cost: $1,720,000, Roadway Improvement Cost: $172,000, Total Project Cost: $2,580,000 ( Estimate for 2000), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 16090604505, Location: 0.1 M W IL 50 (Lat: 41.665047, Lng: -87.747692), Route carried "on" structure: State highway 83, Year Built: 1958, Status: Open, Structure Length: 3.72m (12.20ft), Average Daily Traffic: 16,700 (year 2007), Truck Traffic: 8%, Average Future Daily Traffic: 19,481 (year 2021), Design Load: HS 20, Features Intersected: I-294 TOLL RAMP, Facility Carried by Structure: 127TH ST Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 33.065, Lanes on structure: 5, Lanes under structure: 1, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 29.4m (96.5ft), Skew: 30 degrees, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 12.5m (41.0ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 1.5m (4.9ft), Curb-To-Curb Width: 30.6m (100.4ft), Out-to-Out Width: 35.4m (116.1ft) Condition: Deck: Very good, Superstructure: Very good, Substructure: Good, Operating Rating: 84.6 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 52.2 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Superior to present desirable criteria, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 36 months, Inspection Date: June 2007, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 16090704506, Location: 0.1 M E IL 50 (Lat: 41.661794, Lng: -87.736392), Route carried "on" structure: Other road 344, Year Built: 1958, Status: Open, Structure Length: 11.88m (38.98ft), Average Daily Traffic: 32,700 (year 2006), Truck Traffic: 12%, Average Future Daily Traffic: 36,450 (year 2021), Design Load: HS 20, Features Intersected: I-294 TRI STATE TOLL, Facility Carried by Structure: 127TH ST Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 39.710, Lanes on structure: 4, Lanes under structure: 6, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 23.4m (76.8ft), Skew: 35 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 40.2m (131.9ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 1.5m (4.9ft), Curb-To-Curb Width: 23.4m (76.8ft), Out-to-Out Width: 35.4m (116.1ft) Condition: Deck: Very good, Superstructure: Very good, Substructure: Very good, Operating Rating: 72.0 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 43.2 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Superior to present desirable criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 11.70m (38.39ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2007, Bridge Improvement Cost: $2,078,000, Roadway Improvement Cost: $208,000, Total Project Cost: $3,117,000 ( Estimate for 2000), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 16242918438, Location: 0.3 M S 115TH ST (Lat: 41.679414, Lng: -87.738842), Route carried "on" structure: State highway 50, Year Built: 1970, Year Reconstructed: 1990, Status: Open, Structure Length: 8.07m (26.48ft), Average Daily Traffic: 43,600 (year 2007), Truck Traffic: 7%, Average Future Daily Traffic: 55,755 (year 2021), Design Load: HS 20, Features Intersected: RR - CSXT Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 67.240, Lanes on structure: 4, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 17.1m (56.1ft), Skew: 35 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 31.5m (103.3ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 1.5m (4.9ft), Curb-To-Curb Width: 17.1m (56.1ft), Out-to-Out Width: 21.9m (71.9ft) Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Good, Operating Rating: 57.6 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 36.0 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: Somewhat better than minimum adequacy, Approach Roadway Alignment: Better than present minimum criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: July 2007, Deck Structure Type: Concrete Cast-file-Place Find on map >>
Structure Number: 16270932258, Location: .1M SO 127TH (Lat: 41.654658, Lng: -87.726450), Route carried "on" structure: Ramp Interstate 294, Status: Open, Structure Length: 11.26m (36.94ft), Average Daily Traffic: 6,800 (year 2006), Average Future Daily Traffic: 990 (year 2021), Features Intersected: SB I-294, Facility Carried by Structure: FLY-OVER RAMP Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.998, Lanes on structure: 1, Lanes under structure: 1, Owner: State Toll Authority, Approaching Roadway Width: 9.8m (32.2ft), Skew: 3 degrees, Material/Design: Concrete, Design/Construction: Slab, Number Of Spans In Main Unit: 2, Number Of Approach Spans: 1, Length of Maximum Span: 53.7m (176.2ft), Curb-To-Curb Width: 9.8m (32.2ft), Out-to-Out Width: 10.7m (35.1ft) Condition: Deck: Very good, Superstructure: Very good, Substructure: Very good, Deck Geometry: Superior to present desirable criteria, Underclear: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: June 2007, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 16271332363, Location: E. OF PULASKI RD. (Lat: 41.669394, Lng: -87.717167), Route carried "on" structure: Other road 1588, Year Reconstructed: 1974, Status: Open, Structure Length: 0.82m (2.69ft), Average Daily Traffic: 7,400 (year 2002), Average Future Daily Traffic: 11,640 (year 2021), Features Intersected: STONY CREEK, Facility Carried by Structure: 123RD STREET Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 1.802, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 6.1m (20.0ft), Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 0.0m, Curb-To-Curb Width: 7.6m (24.9ft) Condition: Channel: Satisfactory, Culverts: Satisfactory, Operating Rating: 44.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 32.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Waterway Adequacy: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: March 2008 Find on map >>
Structure Number: 16984403954, Location: 0.5 M S 127TH P26 (Lat: 41.654050, Lng: -87.726119), Route carried "on" structure: Interstate 294, Year Built: 1958, Status: Open, Structure Length: 2.29m (7.51ft), Average Daily Traffic: 49,200 (year 2006), Truck Traffic: 14%, Average Future Daily Traffic: 64,400 (year 2021), Features Intersected: 131ST ST Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 67.111, Lanes on structure: 2, Lanes under structure: 2, Base Highway Network: Yes, Toll: On toll road, Owner: State Toll Authority, Approaching Roadway Width: 12.2m (40.0ft), Skew: 2 degrees, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 21.9m (71.9ft), Curb-To-Curb Width: 10.7m (35.1ft), Out-to-Out Width: 18.7m (61.4ft) Condition: Deck: Fair, Superstructure: Satisfactory, Substructure: Poor, Operating Rating: 89.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 46.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Meets minimum limits, Deck Geometry: Meets minimum limits, Underclear: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: July 2007, Deck Structure Type: Other, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Built-up Find on map >>
Structure Number: 16984503955, Location: 0.5 M S 127TH P26 (Lat: 41.653922, Lng: -87.726061), Route carried "on" structure: Interstate 294, Year Built: 1958, Status: Open, Structure Length: 2.29m (7.51ft), Average Daily Traffic: 49,200 (year 2006), Truck Traffic: 14%, Average Future Daily Traffic: 64,400 (year 2021), Features Intersected: 131ST ST Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 67.127, Lanes on structure: 2, Lanes under structure: 2, Base Highway Network: Yes, Toll: On toll road, Owner: State Toll Authority, Approaching Roadway Width: 12.2m (40.0ft), Skew: 2 degrees, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 21.9m (71.9ft), Curb-To-Curb Width: 10.7m (35.1ft), Out-to-Out Width: 18.7m (61.4ft) Condition: Deck: Poor, Superstructure: Good, Substructure: Poor, Operating Rating: 89.1 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 46.8 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Meets minimum limits, Deck Geometry: Meets minimum limits, Underclear: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: July 2007, Deck Structure Type: Other, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Built-up Find on map >>
Structure Number: 16042004128, Location: 0.1 M N 127TH (Lat: 41.663000, Lng: -87.738650), Route carried "under" structure: Interstate 294, Year Built: 1958, Structure Length: 8.11m (26.61ft), Average Daily Traffic: 49,200 (year 2006), Truck Traffic: 14%, Features Intersected: I-294 TRI STATE TOLL, Facility Carried by Structure: IL 50 (CICERO AVE Minimum Vertical Clearance: 4.65m (15.26ft), Kilometerpoint: 65.712, Lanes on structure: 4, Lanes under structure: 5, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 27.4m (89.9ft) Find on map >>
Structure Number: 16090604505, Location: 0.1 M W IL 50 (Lat: 41.665047, Lng: -87.747692), Route carried "under" structure: Ramp Interstate 294, Year Built: 1958, Structure Length: 3.72m (12.20ft), Average Daily Traffic: 6,800 (year 2006), Features Intersected: I-294 TOLL RAMP, Facility Carried by Structure: 127TH ST Minimum Vertical Clearance: 4.65m (15.26ft), Kilometerpoint: 0.145, Lanes on structure: 5, Lanes under structure: 1, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 12.5m (41.0ft) Find on map >>
Structure Number: 16090704506, Location: 0.1 M E IL 50 (Lat: 41.661794, Lng: -87.736392), Route carried "under" structure: Interstate 294, Year Built: 1958, Structure Length: 11.88m (38.98ft), Average Daily Traffic: 98,400 (year 2006), Truck Traffic: 14%, Features Intersected: I-294 TRI STATE TOLL, Facility Carried by Structure: 127TH ST Minimum Vertical Clearance: 0.47m (1.54ft), Kilometerpoint: 65.921, Lanes on structure: 4, Lanes under structure: 6, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 40.2m (131.9ft) Find on map >>
Structure Number: 16251102407, Location: 0.35 W KEDZIE AVE (Lat: 41.662278, Lng: -87.707492), Route carried "under" structure: Other road 344, Year Built: 1983, Structure Length: 6.02m (19.75ft), Average Daily Traffic: 29,100 (year 2006), Truck Traffic: 10%, Features Intersected: 127TH ST, Facility Carried by Structure: RR - CSXT Minimum Vertical Clearance: 5.03m (16.50ft), Kilometerpoint: 42.124, Lanes under structure: 4, Material/Design: Steel, Design/Construction: Girder and Floorbeam System, Length of Maximum Span: 28.3m (92.8ft) Find on map >>
Structure Number: 16263232332, Location: 0.34 M E OF CENTRAL (Lat: 41.690683, Lng: -87.752289), Route carried "under" structure: Other road 1581, Year Built: 1997, Structure Length: 5.86m (19.23ft), Average Daily Traffic: 29,700 (year 2006), Truck Traffic: 6%, Features Intersected: 111TH ST, Facility Carried by Structure: RR - CSXT Minimum Vertical Clearance: 5.33m (17.49ft), Kilometerpoint: 8.608, Lanes under structure: 4, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 17.7m (58.1ft) Find on map >>
Structure Number: 16270932258, Location: .1M SO 127TH (Lat: 41.654658, Lng: -87.726450), Route carried "under" structure: Ramp Interstate 294, Structure Length: 11.26m (36.94ft), Average Daily Traffic: 6,800 (year 2006), Features Intersected: SB I-294, Facility Carried by Structure: FLY-OVER RAMP Minimum Vertical Clearance: 0.50m (1.64ft), Kilometerpoint: 0.998, Lanes on structure: 1, Lanes under structure: 1, Material/Design: Concrete, Design/Construction: Slab, Length of Maximum Span: 53.7m (176.2ft) Find on map >>
Structure Number: 16984403954, Location: 0.5 M S 127TH P26 (Lat: 41.654050, Lng: -87.726119), Route carried "under" structure: City street 4160, Year Built: 1958, Structure Length: 2.29m (7.51ft), Average Daily Traffic: 509 (year 1998), Features Intersected: 131ST ST, Facility Carried by Structure: I-294 SB Minimum Vertical Clearance: 4.34m (14.24ft), Kilometerpoint: 0.103, Lanes on structure: 2, Lanes under structure: 2, Toll: On toll road, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 21.9m (71.9ft) Find on map >>
Structure Number: 16984503955, Location: 0.5 M S 127TH P26 (Lat: 41.653922, Lng: -87.726061), Route carried "under" structure: City street 4160, Year Built: 1958, Structure Length: 2.29m (7.51ft), Average Daily Traffic: 509 (year 1998), Features Intersected: 131ST ST, Facility Carried by Structure: I-294 NB Minimum Vertical Clearance: 4.34m (14.24ft), Kilometerpoint: 1.046, Lanes on structure: 2, Lanes under structure: 2, Toll: On toll road, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 21.9m (71.9ft) Discuss this city on our hugely popular Illinois forum Back to: Alsip, IL, Illinois, All US cities.
|
![]() |