Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Arapahoe, Nebraska (NE)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 16Number of bridges
  • 184ft / 56.0mTotal length
  • $46,000Total costs
  • 14,280Total average daily traffic
  • 2,802Total average daily truck traffic
  • 20,140Total future (year 2033) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Arapahoe
  • No street view available for this location

New bridges in Arapahoe, NE - historical statistics
  • New bridges - historical statistics
  • 71930-1939
  • 31940-1949
  • 11960-1969
  • 21980-1989
  • 31990-1999
Reconstructed bridges in Arapahoe, NE - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21960-1969
  • 11970-1979
  • 31980-1989
  • 31990-1999
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 33.3%Very good
  • 8.3%Good
  • 16.7%Satisfactory
  • 41.7%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 41.7%Very good
  • 8.3%Good
  • 8.3%Satisfactory
  • 33.3%Fair
  • 8.3%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 25.0%Very good
  • 8.3%Good
  • 16.7%Satisfactory
  • 25.0%Fair
  • 25.0%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 6.7%Excellent
  • 33.3%Very good
  • 33.3%Good
  • 13.3%Satisfactory
  • 6.7%Fair
  • 6.7%Serious
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 25.0%Very good
  • 50.0%Good
  • 25.0%Satisfactory
Find on map >>   Show street view

Structure Number: NKA-CAMB-021,  Location: 1 mi NE of Arapahoe (Lat: 40.314850,  Lng: -99.893108),  Route carried "on" structure: County highway 424,  Year Built: 1949,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 1.17m (3.84ft),  Average Daily Traffic: 100 (year 2003),  Average Future Daily Traffic: 170 (year 2040),  Design Load: HS 20,  Features Intersected: Cambridge Canal
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Bureau of Reclamation,  Maintenance Responsibility: Local Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.5m (37.7ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 58.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $24,000,  Roadway Improvement Cost: $23,000,  Total Project Cost: $46,000 ( Estimate for 2020),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: C003303305,  Location: N EDGE OF ARAPAHOE (Lat: 40.315000,  Lng: -99.893300),  Route carried "on" structure: County highway 33,  Year Built: 1935,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 100 (year 2003),  Truck Traffic: 10%,  Average Future Daily Traffic: 170 (year 2042),  Features Intersected: CAMBRIDGE-OXFORD-ORLEANS,  Facility Carried by Structure: COUNTY HIGHWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Local Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.6m (38.1ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Fair,  Superstructure: Very good,  Substructure: Poor,  Channel: Excellent,  Operating Rating: 53.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: C003311225,  Location: JCT US6/US283 2S .6E (Lat: 40.276600,  Lng: -99.886500),  Route carried "on" structure: County highway 1450,  Year Built: 1935,  Year Reconstructed: 1979,  Status: Posted for load,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 155 (year 2011),  Average Future Daily Traffic: 155 (year 2042),  Features Intersected: CRUM CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.083,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Serious,  Operating Rating: 33.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 0.94m (3.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: C003312915,  Location: 2W OF ARAPAHOE (Lat: 40.314000,  Lng: -99.931200),  Route carried "on" structure: County highway 129,  Year Built: 1930,  Year Reconstructed: 1974,  Status: Posted for load,  Structure Length: 5.06m (16.60ft),  Average Daily Traffic: 40 (year 2003),  Average Future Daily Traffic: 68 (year 2033),  Features Intersected: MUDDY CREEK,  Facility Carried by Structure: ROAD 422
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 13.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 7.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 5.03m (16.50ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Critical Feature Inspection Date: October 2021,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: C00332042,  Location: 3E 2N OF HOLBROOK (Lat: 40.335000,  Lng: -99.953300),  Route carried "on" structure: County highway 204,  Year Built: 1992,  Status: Open,  Structure Length: 4.18m (13.71ft),  Average Daily Traffic: 20 (year 2003),  Average Future Daily Traffic: 34 (year 2033),  Design Load: HS 20,  Features Intersected: MUDDY CREEK,  Facility Carried by Structure: COUNTY HIGHWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 16.5m (54.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 69.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: C003321003P,  Location: 2E .2S ARAPAHOE (Lat: 40.303300,  Lng: -99.855000),  Route carried "on" structure: County highway P210,  Year Built: 1980,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 30 (year 2003),  Average Future Daily Traffic: 51 (year 2042),  Features Intersected: LITTLE ANTELOPE CREEK,  Facility Carried by Structure: COUNTY HIGHWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.7m (8.9ft)

Condition: Culverts: Good,  Operating Rating: 33.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 22.0 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021
Find on map >>   Show street view

Structure Number: C003330215,  Location: 1E US283 GOSPER CL (Lat: 40.351500,  Lng: -99.896200),  Route carried "on" structure: County highway 302,  Year Built: 1935,  Status: Posted for load,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 10 (year 2003),  Average Future Daily Traffic: 17 (year 2033),  Features Intersected: STREAM,  Facility Carried by Structure: ROAD 726
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 4.8m (15.7ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 5.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 4.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.58m (5.18ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Critical Feature Inspection Date: October 2021,  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: C00333372,  Location: 1.5E OF ARAPAHOE (Lat: 40.303900,  Lng: -99.855300),  Route carried "on" structure: County highway 337,  Year Built: 1935,  Status: Posted for load,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 10 (year 2003),  Average Future Daily Traffic: 17 (year 2033),  Features Intersected: CAMBRIDGE-OXFORD-ORLEANS,  Facility Carried by Structure: COUNTY HIGHWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Local Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 2 degrees,  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.2m (17.1ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Fair,  Channel: Good,  Operating Rating: 17.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 11.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: High priority of corrective action,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.07m (3.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: S006 12568,  Location: 1W ARAPAHOE (Lat: 40.306200,  Lng: -99.911800),  Route carried "on" structure: US 6,  Year Built: 1936,  Year Reconstructed: 1974,  Status: Open,  Structure Length: 6.13m (20.11ft),  Average Daily Traffic: 2,475 (year 2018),  Truck Traffic: 16%,  Average Future Daily Traffic: 3,465 (year 2038),  Features Intersected: MUDDY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.226,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 24.4m (80.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 39.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.13m (20.11ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: S006 12735,  Location: 1E ARAPAHOE (Lat: 40.305800,  Lng: -99.879800),  Route carried "on" structure: US 6,  Year Built: 1936,  Year Reconstructed: 1980,  Status: Open,  Structure Length: 4.02m (13.19ft),  Average Daily Traffic: 2,555 (year 2018),  Truck Traffic: 22%,  Average Future Daily Traffic: 3,577 (year 2038),  Design Load: H 15,  Features Intersected: ELK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.495,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.5m (50.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Poor,  Channel: Good,  Operating Rating: 44.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.02m (13.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: S006 12961,  Location: 3E ARAPAHOE (Lat: 40.307100,  Lng: -99.838900),  Route carried "on" structure: US 6,  Year Built: 1980,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 2,555 (year 2018),  Truck Traffic: 22%,  Average Future Daily Traffic: 3,577 (year 2038),  Design Load: HS 20,  Features Intersected: BIG ANTELOPE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.859,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Satisfactory,  Operating Rating: 43.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 33.0 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: April 2019
Find on map >>   Show street view

Structure Number: S283 01682,  Location: 4S ARAPAHOE (Lat: 40.242300,  Lng: -99.896400),  Route carried "on" structure: US 283,  Year Built: 1948,  Year Reconstructed: 1998,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 955 (year 2018),  Truck Traffic: 23%,  Average Future Daily Traffic: 1,433 (year 2038),  Features Intersected: CRUM CREEK TRIBUTARY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.681,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 33.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 22.0 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021
Find on map >>   Show street view

Structure Number: S283 01725,  Location: 3S ARAPAHOE (Lat: 40.250500,  Lng: -99.898100),  Route carried "on" structure: US 283,  Year Built: 1998,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 955 (year 2018),  Truck Traffic: 23%,  Average Future Daily Traffic: 1,433 (year 2038),  Design Load: HS 20,  Features Intersected: CRUM CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.776,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 43.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 33.0 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: April 2019
Find on map >>   Show street view

Structure Number: S283 01953,  Location: 1S ARAPAHOE (Lat: 40.283900,  Lng: -99.897800),  Route carried "on" structure: US 283,  Year Built: 1991,  Status: Open,  Structure Length: 15.30m (50.20ft),  Average Daily Traffic: 1,410 (year 2018),  Truck Traffic: 20%,  Average Future Daily Traffic: 1,974 (year 2038),  Design Load: HS 20,  Features Intersected: REPUBLICAN RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.143,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 25.6m (84.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 83.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: April 2019,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: S283 02014,  Location: 0S ARAPAHOE (Lat: 40.292100,  Lng: -99.897700),  Route carried "on" structure: US 283,  Year Built: 1941,  Year Reconstructed: 1991,  Status: Open,  Structure Length: 6.98m (22.90ft),  Average Daily Traffic: 1,410 (year 2018),  Truck Traffic: 20%,  Average Future Daily Traffic: 1,974 (year 2038),  Design Load: H 20,  Features Intersected: MUDDY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.241,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 23.2m (76.1ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 63.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: S283 02407,  Location: 3N ARAPAHOE (Lat: 40.349100,  Lng: -99.901100),  Route carried "on" structure: US 283,  Year Built: 1960,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 5.06m (16.60ft),  Average Daily Traffic: 1,500 (year 2018),  Truck Traffic: 18%,  Average Future Daily Traffic: 2,025 (year 2038),  Design Load: HS 20,  Features Intersected: ELK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.874,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 19.8m (65.0ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 11.7m (38.4ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 74.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Discuss Arapahoe, Nebraska (NE) on our hugely popular Nebraska forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.