Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Ardmore, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 10Number of bridges
  • 52ft / 16.3mTotal length
  • $4,959,000Total costs
  • 16,092Total average daily traffic
  • 875Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Ardmore
  • No street view available for this location

New bridges in Ardmore, AL - historical statistics
  • New bridges - historical statistics
  • 11910-1919
  • 31950-1959
  • 41960-1969
  • 11980-1989
  • 11990-1999
Average Bridge Daily Traffic in Ardmore, AL
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 50.0%Very good
  • 50.0%Good
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 50.0%Very good
  • 50.0%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 55.6%Good
  • 44.4%Satisfactory
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 71.4%Good
  • 14.3%Satisfactory
  • 14.3%Fair
Find on map >>   Show street view

Structure Number: 4952,  Location: SEC11 T1S R3W (Lat: 34.962633,  Lng: -86.809542),  Route carried "on" structure: County highway 117,  Year Built: 1954,  Status: Posted for load,  Structure Length: 2.56m (8.40ft),  Average Daily Traffic: 600 (year 2013),  Truck Traffic: 1%,  Average Future Daily Traffic: 890 (year 2033),  Design Load: H 15,  Features Intersected: LITTLE LIMESTONE CR,  Facility Carried by Structure: PINEDALE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 47.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 3.46m (11.35ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: November 2020,  Other Special Inspection Date: November 2021,  Bridge Improvement Cost: $569,000,  Roadway Improvement Cost: $57,000,  Total Project Cost: $626,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 5943,  Location: 3.7 M S JCT SR53 & SR251 (Lat: 34.973000,  Lng: -86.802600),  Route carried "on" structure: State highway 53,  Year Built: 1957,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 7,300 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 9,489 (year 2033),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 545.729,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 67.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.02m (6.63ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $629,000,  Roadway Improvement Cost: $63,000,  Total Project Cost: $692,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 7127,  Location: SEC9 T1S R3W (Lat: 34.962656,  Lng: -86.853261),  Route carried "on" structure: County highway 117,  Year Built: 1960,  Status: Open,  Structure Length: 0.62m (2.03ft),  Average Daily Traffic: 640 (year 2010),  Truck Traffic: 1%,  Average Future Daily Traffic: 950 (year 2030),  Design Load: H 15,  Features Intersected: BRANCH,  Facility Carried by Structure: SWEET SPRINGS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 1.8m (5.9ft),  Curb-To-Curb Width: 9.0m (29.5ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 43.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.23m (4.04ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $220,000,  Roadway Improvement Cost: $22,000,  Total Project Cost: $242,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 7128,  Location: SEC9 T1S R3W (Lat: 34.962619,  Lng: -86.848494),  Route carried "on" structure: County highway 117,  Year Built: 1960,  Status: Open,  Structure Length: 1.62m (5.31ft),  Average Daily Traffic: 740 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,100 (year 2031),  Design Load: H 15,  Features Intersected: PINEY CR,  Facility Carried by Structure: SWEET SPRINGS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 37.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.30m (7.55ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: Febuary 2021,  Underwater Inspection Date: November 2018,  Bridge Improvement Cost: $399,000,  Roadway Improvement Cost: $40,000,  Total Project Cost: $439,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 8433,  Location: SEC11 T1S R3W (Lat: 34.962681,  Lng: -86.809597),  Route carried "on" structure: Bypass County highway 117,  Year Built: 1964,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 867 (year 2014),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,288 (year 2034),  Design Load: H 15,  Features Intersected: LIMESTONE CREEK FORK,  Facility Carried by Structure: PINEDALE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.7m (8.9ft),  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 33.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.45m (4.76ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $251,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $276,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 9163,  Location: SEC23 T1S R3W (Lat: 34.933408,  Lng: -86.806653),  Route carried "on" structure: County highway 106,  Year Built: 1961,  Status: Open,  Structure Length: 2.41m (7.91ft),  Average Daily Traffic: 600 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 890 (year 2031),  Design Load: H 15,  Features Intersected: LITTLE LIMESTONE CR,  Facility Carried by Structure: BETHEL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 4.6m (15.1ft),  Curb-To-Curb Width: 9.0m (29.5ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 42.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.27m (10.73ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $585,000,  Roadway Improvement Cost: $59,000,  Total Project Cost: $644,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 13677,  Location: SEC2 T1S R3W (Lat: 34.977181,  Lng: -86.809456),  Route carried "on" structure: County highway 118,  Year Built: 1985,  Status: Open,  Structure Length: 1.79m (5.87ft),  Average Daily Traffic: 550 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 820 (year 2031),  Design Load: HS 20,  Features Intersected: LITTLE LIMESTONE CREEK,  Facility Carried by Structure: CEDAR HILL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 4.5m (14.8ft),  Curb-To-Curb Width: 12.4m (40.7ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 77.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.50m (8.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $634,000,  Roadway Improvement Cost: $63,000,  Total Project Cost: $697,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 15637,  Location: SEC21 T1S R3W (Lat: 34.933417,  Lng: -86.842639),  Route carried "on" structure: County highway 106,  Year Built: 1991,  Status: Open,  Structure Length: 4.15m (13.62ft),  Average Daily Traffic: 520 (year 2010),  Truck Traffic: 1%,  Average Future Daily Traffic: 770 (year 2030),  Design Load: HS 20,  Features Intersected: PINEY CREEK,  Facility Carried by Structure: BETHEL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 60.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 5.12m (16.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $948,000,  Roadway Improvement Cost: $95,000,  Total Project Cost: $1,043,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 21639,  Location: _ (Lat: 34.925511,  Lng: -86.846575),  Route carried "on" structure: County highway ,  Year Built: 1953,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 185 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 541 (year 2042),  Features Intersected: _HAUSKIN BRANCH,  Facility Carried by Structure: _SAND SPRINGS RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.1m (10.2ft),  Curb-To-Curb Width: 5.8m (19.0ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.69m (5.54ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $273,000,  Roadway Improvement Cost: $27,000,  Total Project Cost: $300,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 12453,  Location: 2 MI E JCT I 65 & SR 53 (Lat: 34.983333,  Lng: -86.851667),  Route carried "under" structure: State highway 53,  Year Built: 1913,  Structure Length: 0. m,  Average Daily Traffic: 4,090 (year 2013),  Truck Traffic: 4%,  Features Intersected: SR 53,  Facility Carried by Structure: CSX RAILROAD
Minimum Vertical Clearance: 3.54m (11.61ft),  Kilometerpoint: 552.359,  Lanes under structure: 1,  Material/Design: Concrete,  Design/Construction: Slab,  Length of Maximum Span: 6.7m (22.0ft)

Discuss Ardmore, Alabama (AL) on our hugely popular Alabama forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.