Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Artesia, New Mexico (NM)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 16Number of bridges
  • 246ft / 74.6mTotal length
  • $3,894,000Total costs
  • 89,491Total average daily traffic
  • 11,991Total average daily truck traffic
  • 118,185Total future (year 2040) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Artesia
  • No street view available for this location

New bridges in Artesia, NM - historical statistics
  • New bridges - historical statistics
  • 11930-1939
  • 31940-1949
  • 31960-1969
  • 51970-1979
  • 21980-1989
  • 22010-2019
Reconstructed bridges in Artesia, NM - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11960-1969
  • 01970-1979
  • 01980-1989
  • 01990-1999
  • 42000-2009
Average Bridge Daily Traffic in Artesia, NM
Average Bridge Truck Traffic in Artesia, NM
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 55.6%Good
  • 33.3%Satisfactory
  • 11.1%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 55.6%Good
  • 33.3%Satisfactory
  • 11.1%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 44.4%Good
  • 44.4%Satisfactory
  • 11.1%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 6.3%Excellent
  • 12.5%Very good
  • 68.8%Good
  • 12.5%Satisfactory
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 14.3%Excellent
  • 28.6%Very good
  • 28.6%Good
  • 14.3%Satisfactory
  • 14.3%Fair
Find on map >>   Show street view

Structure Number: 2116,  Location: 0.6 M N JCT US-82/ARTESIA (Lat: 32.851494,  Lng: -104.398128),  Route carried "on" structure: US 285,  Year Built: 1934,  Year Reconstructed: 1969,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 10,901 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 12,241 (year 2040),  Design Load: H 15,  Features Intersected: UNNAMED WATERWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 112.582,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 35.4m (116.1ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.7m (8.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 38.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2019
Find on map >>   Show street view

Structure Number: 5567,  Location: 3.4 M E JCT US285/ARTESIA (Lat: 32.842242,  Lng: -104.339517),  Route carried "on" structure: US 82,  Year Built: 1979,  Year Reconstructed: 2014,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 7,502 (year 2020),  Truck Traffic: 20%,  Average Future Daily Traffic: 10,889 (year 2040),  Design Load: H 20,  Features Intersected: PECOS RIVER OVERFLOW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 177.832,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 1.7m (5.6ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 40.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.05m (10.01ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: May 2018,  Bridge Improvement Cost: $10,000,  Roadway Improvement Cost: $15,000,  Total Project Cost: $30,000 ( Estimate for 2020)
Find on map >>   Show street view

Structure Number: 5568,  Location: 3.5 MI E OF JCT US-285 (Lat: 32.842033,  Lng: -104.337742),  Route carried "on" structure: US 82,  Year Built: 1941,  Year Reconstructed: 2014,  Status: Open,  Structure Length: 6.10m (20.01ft),  Average Daily Traffic: 7,502 (year 2020),  Truck Traffic: 20%,  Average Future Daily Traffic: 10,889 (year 2040),  Design Load: H 20,  Features Intersected: PECOS RIVER OVERFLOW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 178.042,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 30,  Length of Maximum Span: 1.8m (5.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 40.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.05m (10.01ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: May 2018,  Bridge Improvement Cost: $10,000,  Roadway Improvement Cost: $15,000,  Total Project Cost: $30,000 ( Estimate for 2020)
Find on map >>   Show street view

Structure Number: 5569,  Location: 3.6 MI E OF JCT US-285 (Lat: 32.841875,  Lng: -104.336433),  Route carried "on" structure: US 82,  Year Built: 1941,  Year Reconstructed: 2014,  Status: Open,  Structure Length: 4.02m (13.19ft),  Average Daily Traffic: 7,502 (year 2020),  Truck Traffic: 20%,  Average Future Daily Traffic: 10,889 (year 2040),  Design Load: H 20,  Features Intersected: PECOS RIVER OVERFLOW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 178.122,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 20,  Length of Maximum Span: 1.8m (5.9ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 40.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.05m (10.01ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: May 2018,  Bridge Improvement Cost: $10,000,  Roadway Improvement Cost: $15,000,  Total Project Cost: $30,000 ( Estimate for 2020)
Find on map >>   Show street view

Structure Number: 557,  Location: 3.8 MI E OF JCT US-285 (Lat: 32.841594,  Lng: -104.334117),  Route carried "on" structure: US 82,  Year Built: 1941,  Year Reconstructed: 2014,  Status: Open,  Structure Length: 4.08m (13.39ft),  Average Daily Traffic: 7,502 (year 2020),  Truck Traffic: 20%,  Average Future Daily Traffic: 10,889 (year 2040),  Design Load: H 20,  Features Intersected: PECOS RIVER OVERFLOW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 178.315,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 20,  Length of Maximum Span: 1.7m (5.6ft)

Condition: Channel: Excellent,  Culverts: Excellent,  Operating Rating: 40.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.05m (10.01ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: May 2018,  Bridge Improvement Cost: $10,000,  Roadway Improvement Cost: $15,000,  Total Project Cost: $30,000 ( Estimate for 2020)
Find on map >>   Show street view

Structure Number: 6939,  Location: 0.3 MI N JCT US82 ARTESIA (Lat: 32.847150,  Lng: -104.398000),  Route carried "on" structure: US 285,  Year Built: 1969,  Status: Open,  Structure Length: 5.91m (19.39ft),  Average Daily Traffic: 10,901 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 12,241 (year 2040),  Design Load: HS 20,  Features Intersected: EAGLE DRAW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 111.688,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 25.0m (82.0ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 12.5m (41.0ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 25.0m (82.0ft),  Out-to-Out Width: 28.3m (92.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 48.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 694,  Location: 0.3 MI N OF US-82/ARTESIA (Lat: 32.845903,  Lng: -104.412739),  Route carried "on" structure: City street 4167,  Year Built: 1969,  Status: Open,  Structure Length: 3.72m (12.20ft),  Average Daily Traffic: 4,048 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 5,774 (year 2040),  Design Load: HS 20,  Features Intersected: EAGLE DRAW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 17.7m (58.1ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 13.1m (43.0ft),  Out-to-Out Width: 16.4m (53.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 50.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 6941,  Location: 0.3 MI N OF US-82/ARTESIA (Lat: 32.846019,  Lng: -104.404794),  Route carried "on" structure: City street 5266,  Year Built: 1969,  Status: Open,  Structure Length: 4.39m (14.40ft),  Average Daily Traffic: 2,696 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 1,256 (year 2040),  Design Load: HS 20,  Features Intersected: EAGLE DRAW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 9.4m (30.8ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 17.7m (58.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 7351,  Location: 1.8 MI W OF JCT US-285 (Lat: 32.842378,  Lng: -104.422311),  Route carried "on" structure: US 82,  Year Built: 1972,  Status: Open,  Structure Length: 2.44m (8.01ft),  Average Daily Traffic: 3,387 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 3,793 (year 2040),  Design Load: HS 20,  Features Intersected: EAGLE DRAW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 170.085,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.7m (67.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.5m (77.1ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 20.7m (67.9ft),  Out-to-Out Width: 28.3m (92.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 58.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.35m (7.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $357,000,  Roadway Improvement Cost: $36,000,  Total Project Cost: $536,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 7448,  Location: 5.1 MI E OF JCT US-285 (Lat: 32.836725,  Lng: -104.311556),  Route carried "on" structure: US 82,  Year Built: 1974,  Status: Open,  Structure Length: 1.86m (6.10ft),  Average Daily Traffic: 7,502 (year 2020),  Truck Traffic: 20%,  Average Future Daily Traffic: 10,889 (year 2040),  Design Load: HS 20,  Features Intersected: UNNAMED WATERWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 181.292,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 15.5m (50.9ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 43.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021
Find on map >>   Show street view

Structure Number: 7935,  Location: 4.1 MI E OF JCT US-285 (Lat: 32.840836,  Lng: -104.327800),  Route carried "on" structure: US 82,  Year Built: 1982,  Status: Open,  Structure Length: 17.50m (57.41ft),  Average Daily Traffic: 7,502 (year 2020),  Truck Traffic: 20%,  Average Future Daily Traffic: 10,889 (year 2040),  Design Load: HS 20,  Features Intersected: PECOS RIVER OVERFLOW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 178.798,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.5m (50.9ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 21.6m (70.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 53.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 17.50m (57.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $1,294,000,  Roadway Improvement Cost: $129,000,  Total Project Cost: $1,942,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 7936,  Location: 4.3 MI E OF JCT US-285 (Lat: 32.840364,  Lng: -104.323872),  Route carried "on" structure: US 82,  Year Built: 1982,  Status: Open,  Structure Length: 11.73m (38.48ft),  Average Daily Traffic: 7,502 (year 2020),  Truck Traffic: 20%,  Average Future Daily Traffic: 10,889 (year 2040),  Design Load: HS 20,  Features Intersected: PECOS RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 179.280,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.5m (50.9ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 53.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.67m (38.29ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $864,000,  Roadway Improvement Cost: $86,000,  Total Project Cost: $1,296,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 8588,  Location: 0.6 MI S OF US-82/ARTESIA (Lat: 32.834231,  Lng: -104.429861),  Route carried "on" structure: City street 4166,  Year Built: 1973,  Status: Open,  Structure Length: 2.35m (7.71ft),  Average Daily Traffic: 3,007 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 3,368 (year 2040),  Design Load: HS 20,  Features Intersected: EAGLE DRAW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.1m (26.6ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.6m (74.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 11.9m (39.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 12 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 8589,  Location: 1.4 MI W US-285/ARTESIA (Lat: 32.838919,  Lng: -104.423325),  Route carried "on" structure: City street 5265,  Year Built: 1973,  Status: Open,  Structure Length: 2.50m (8.20ft),  Average Daily Traffic: 1,435 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 2,338 (year 2040),  Design Load: HS 20,  Features Intersected: EAGLE DRAW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 14.3m (46.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.8m (78.1ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 20.4m (66.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 61.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 9588,  Location: 4.6 MI N OF JCT US-82 (Lat: 32.913289,  Lng: -104.895486),  Route carried "on" structure: State highway 13,  Year Built: 2013,  Status: Open,  Structure Length: 4.48m (14.70ft),  Average Daily Traffic: 231 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 433 (year 2040),  Design Load: HS 20,  Features Intersected: EAGLE DRAW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.419,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 22.7m (74.5ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 99.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 60.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 9675,  Location: 0.2 miles nof jct US 82 (Lat: 32.845992,  Lng: -104.421353),  Route carried "on" structure: City street 1501,  Year Built: 2013,  Status: Open,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 371 (year 2020),  Average Future Daily Traffic: 518 (year 2040),  Design Load: HS 20,  Features Intersected: US 82,  Facility Carried by Structure: Cetennial Drive
Minimum Vertical Clearance: 0.00m,  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 2.4m (7.9ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 53.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: July 2018
Discuss Artesia, New Mexico (NM) on our hugely popular New Mexico forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.