U.S. Cities - City-Data Homepage  
City-Data Forum
City-Data.com Homepage

Bridge Statistics for Barkhamsted, Connecticut (CT) - Condition, Traffic, Stress, Structural Evaluation, Project Costs

Back to: Barkhamsted, CT, Connecticut, Connecticut forum, All US cities.





National Bridge Inventory (NBI) Statistics
Number of bridges: 11
Total length: 25 meters (82ft)
Total costs: $22,000
Total average daily traffic: 38,400
Total average daily truck traffic: 1,704
Total future (year 2028) average daily traffic: 19,200
National Bridge Inventory (NBI) Registered Bridges for Barkhamsted

New bridges - Historical Statistics

  • 1920-1929: 1
  • 1930-1939: 3
  • 1940-1949: 3
  • 1950-1959: 4

Average Daily Traffic

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Find on map >>

Structure Number: 874,  Location: 1.1 MI FROM WINCHESTER TL (Lat: 41.951667,  Lng: -73.020000),  Route carried "on" structure: State highway 20,  Year Built: 1953,  Status: Open,  Structure Length: 4.97m (16.31ft),  Average Daily Traffic: 1,900 (year 2007),  Truck Traffic: 2%,  Average Future Daily Traffic: 950 (year 2028),  Design Load: H 20,  Features Intersected: STILL RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.218,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 12.5m (41.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 11.9m (39.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 70.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2008,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 875,  Location: 1.4 MI W OF WINCHESTER TL (Lat: 41.956667,  Lng: -73.016667),  Route carried "on" structure: State highway 20,  Year Built: 1940,  Status: Open,  Structure Length: 4.66m (15.29ft),  Average Daily Traffic: 1,500 (year 2007),  Truck Traffic: 2%,  Average Future Daily Traffic: 750 (year 2028),  Design Load: H 20,  Features Intersected: W BRNCH FARMINGTON RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.701,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete continuous,  Design/Construction: Frame,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 21.3m (69.9ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 11.9m (39.0ft)

Condition: Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 52.2 metric tons,  Inventory Rating: 30.6 metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2008,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000
Find on map >>

Structure Number: 972,  Location: 150' EAST OF DEW ROAD (Lat: 41.905000,  Lng: -73.008333),  Route carried "on" structure: US 44,  Year Built: 1947,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 13,100 (year 2008),  Truck Traffic: 6%,  Average Future Daily Traffic: 6,550 (year 2028),  Design Load: H 20,  Features Intersected: MORGAN BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 50.700,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 28.2m (92.5ft)

Condition: Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 89.1 metric tons,  Inventory Rating: 89.1 metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2009,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000
Find on map >>

Structure Number: 1495,  Location: 0.3 MILE NORTH OF U.S. 44 (Lat: 41.911667,  Lng: -72.990000),  Route carried "on" structure: State highway 181,  Year Built: 1957,  Status: Open,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 2,000 (year 2007),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,000 (year 2028),  Features Intersected: MORGAN BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.499,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.3m (37.1ft),  Curb or Sidewalk Widths: Left: 1.1m (3.6ft),  Right: 1.1m (3.6ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 14.4m (47.2ft)

Condition: Deck: Very good,  Superstructure: Fair,  Substructure: Good,  Channel: Very good,  Inventory Rating: 54.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2008,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 1496,  Location: INTERSECT RTS 181 & 318 (Lat: 41.905000,  Lng: -72.988333),  Route carried "on" structure: State highway 181,  Year Built: 1939,  Year Reconstructed: 1986,  Status: Open,  Structure Length: 7.28m (23.88ft),  Average Daily Traffic: 6,700 (year 2007),  Truck Traffic: 6%,  Average Future Daily Traffic: 3,350 (year 2028),  Features Intersected: W BR FARMINGTON RIVER
Minimum Vertical Clearance: 4.78m (15.68ft),  Kilometerpoint: 1.738,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 70.7m (232.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 54.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 24 months,  Inspection Date: January 2009,  Critical Feature Inspection Date: January 2009,  Other Special Inspection Date: January 2009,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000,  Deck Structure Type: Closed Grating,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>

Structure Number: 1497,  Location: 0.5 MI NORTH OF ROUTE 318 (Lat: 41.930000,  Lng: -72.971667),  Route carried "on" structure: State highway 181,  Year Built: 1929,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 1,000 (year 2007),  Truck Traffic: 2%,  Average Future Daily Traffic: 500 (year 2028),  Features Intersected: BEAVER BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.781,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 52.2 metric tons,  Inventory Rating: 30.6 metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2008,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 1589,  Location: 100 FEET EAST OF ROUTE 44 (Lat: 41.915000,  Lng: -73.000000),  Route carried "on" structure: State highway 318,  Year Built: 1947,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 5,500 (year 2007),  Truck Traffic: 3%,  Average Future Daily Traffic: 2,750 (year 2028),  Design Load: H 20,  Features Intersected: MORGAN BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.032,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 9.2m (30.2ft),  Out-to-Out Width: 14.7m (48.2ft)

Condition: Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 52.2 metric tons,  Inventory Rating: 30.6 metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2008,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 159,  Location: 0.2 MILE EAST OF RTE. 181 (Lat: 41.911667,  Lng: -72.973333),  Route carried "on" structure: State highway 318,  Year Built: 1937,  Status: Open,  Structure Length: 0.61m (2.00ft),  Average Daily Traffic: 5,000 (year 2007),  Truck Traffic: 3%,  Average Future Daily Traffic: 2,500 (year 2028),  Features Intersected: BEAVER BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.655,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 58.5 metric tons,  Inventory Rating: 40.5 metric tons,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2008,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000
Find on map >>

Structure Number: 5123,  Location: .25 MI WEST OF ROUTE 181 (Lat: 41.925000,  Lng: -72.971667),  Route carried "on" structure: City street ,  Year Built: 1956,  Status: Open,  Structure Length: 1.43m (4.69ft),  Average Daily Traffic: 230 (year 2008),  Truck Traffic: 7%,  Average Future Daily Traffic: 115 (year 2028),  Features Intersected: BEAVER BROOK,  Facility Carried by Structure: DAY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.032,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.8m (42.0ft),  Curb-To-Curb Width: 6.9m (22.6ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 52.2 metric tons,  Inventory Rating: 30.6 metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2008,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 5124,  Location: 200 FEET EAST OF ROUTE 44 (Lat: 41.905000,  Lng: -72.993333),  Route carried "on" structure: City street ,  Year Built: 1957,  Status: Open,  Structure Length: 1.86m (6.10ft),  Average Daily Traffic: 570 (year 2008),  Truck Traffic: 7%,  Average Future Daily Traffic: 285 (year 2028),  Features Intersected: MORGAN BROOK,  Facility Carried by Structure: MORGAN BROOK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.352,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.7m (58.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 12.0m (39.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 54.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2008,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 5125,  Location: 50 FT SOUTH OF ROUTE 44 (Lat: 41.913333,  Lng: -73.018333),  Route carried "on" structure: City street ,  Year Built: 1930,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 900 (year 2008),  Truck Traffic: 2%,  Average Future Daily Traffic: 450 (year 2028),  Features Intersected: MORGAN BROOK,  Facility Carried by Structure: EAST WEST HILL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.940,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 52.2 metric tons,  Inventory Rating: 30.6 metric tons,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2008,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000
Jump to a detailed profile or search site with Google Custom Search
Business Search - 14 Million verified businesses
Search for: near: 

Discuss this city on our hugely popular Connecticut forum

Back to: Barkhamsted, CT, Connecticut, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2009 Advameg, Inc.