Bridge Statistics for Battle Mountain, Nevada (NV) - Condition, Traffic, Stress, Structural Evaluation, Project CostsBack to: Battle Mountain, NV, Nevada, Nevada forum, All US cities. National Bridge Inventory (NBI) Statistics Number of bridges: 19 Total length: 73 meters (240ft) Total costs: $228,000 Total average daily traffic: 75,940 Total average daily truck traffic: 18,276 National Bridge Inventory (NBI) Registered Bridges for Battle Mountain
Bridge Condition - Superstructure Bridge Condition - Substructure Bridge Condition - Channel Bridge Condition - Culverts Find on map >>
Structure Number: B 34, Location: EAST OF BATTLE MOUNTAIN (Lat: 40.636667, Lng: -116.925000), Route carried "on" structure: State highway 304, Year Built: 1994, Status: Open, Structure Length: 0.79m (2.59ft), Average Daily Traffic: 1,950 (year 2006), Truck Traffic: 9%, Average Future Daily Traffic: 4,000 (year 2026), Design Load: HS 20, Features Intersected: REESE RVR Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 4.183, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 12.2m (40.0ft), Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 3, Length of Maximum Span: 2.4m (7.9ft) Condition: Channel: Fair, Culverts: Good, Operating Rating: 70.2 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 32.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: July 2007 Find on map >>
Structure Number: B 325, Location: SOUTH OF BATTLE MTN (Lat: 40.583333, Lng: -116.926667), Route carried "on" structure: County highway , Year Built: 1982, Status: Open, Structure Length: 1.40m (4.59ft), Average Daily Traffic: 110 (year 2006), Truck Traffic: 1%, Average Future Daily Traffic: 150 (year 2026), Design Load: HS 20+Mod, Features Intersected: REESE RVR, Facility Carried by Structure: JENKINS RD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 7.9m (25.9ft), Material/Design: Concrete, Design/Construction: Slab, Number Of Spans In Main Unit: 1, Length of Maximum Span: 13.7m (44.9ft), Curb-To-Curb Width: 7.9m (25.9ft), Out-to-Out Width: 8.8m (28.9ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Channel: Good, Operating Rating: 51.3 metric tons, Inventory Rating: 32.4 metric tons, Structural Evaluation: Better than present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: July 2007, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: B 88, Location: BATTLE MOUNTAIN (Lat: 40.625000, Lng: -116.923333), Route carried "on" structure: Interstate 80, Year Built: 1976, Status: Open, Structure Length: 1.55m (5.09ft), Average Daily Traffic: 6,700 (year 2006), Truck Traffic: 31%, Average Future Daily Traffic: 7,000 (year 2026), Design Load: HS 20+Mod, Features Intersected: W REESE RVR Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 4, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 23.2m (76.1ft), Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 4, Length of Maximum Span: 3.7m (12.1ft) Condition: Channel: Good, Culverts: Satisfactory, Operating Rating: 65.7 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 32.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: July 2007, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: B 881, Location: BATTLE MOUNTAIN (Lat: 40.616667, Lng: -116.916667), Route carried "on" structure: Interstate 80, Year Built: 1976, Status: Open, Structure Length: 1.55m (5.09ft), Average Daily Traffic: 6,700 (year 2006), Truck Traffic: 31%, Average Future Daily Traffic: 7,000 (year 2026), Design Load: HS 20+Mod, Features Intersected: E REESE RVR Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 4, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 23.2m (76.1ft), Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 4, Length of Maximum Span: 3.7m (12.1ft) Condition: Channel: Fair, Culverts: Satisfactory, Operating Rating: 65.7 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 32.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: August 2007, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: B1097, Location: EAST OF BATTLE MOUNTAIN (Lat: 40.620000, Lng: -116.918333), Route carried "on" structure: Interstate 80, Year Built: 1975, Status: Open, Structure Length: 1.65m (5.41ft), Average Daily Traffic: 6,700 (year 2006), Truck Traffic: 31%, Average Future Daily Traffic: 3,900 (year 2026), Design Load: HS 20+Mod, Features Intersected: REESE RVR Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 4, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 11.6m (38.1ft), Skew: 2 degrees, Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 4, Length of Maximum Span: 4.0m (13.1ft) Condition: Channel: Satisfactory, Culverts: Satisfactory, Operating Rating: 65.7 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 32.4 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Equal to present minimum criteria, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: July 2007, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: I 808, Location: WEST OF BATTLE MTN (Lat: 40.920000, Lng: -117.390000), Route carried "on" structure: Interstate 80, Year Built: 1959, Year Reconstructed: 1973, Status: Open, Structure Length: 0.49m (1.61ft), Average Daily Traffic: 7,500 (year 2006), Truck Traffic: 36%, Average Future Daily Traffic: 11,400 (year 2026), Design Load: HS 20+Mod, Features Intersected: SUMMIT ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 322.649, Lanes on structure: 4, Lanes under structure: 1, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 11.6m (38.1ft), Skew: 20 degrees, Material/Design: Concrete, Design/Construction: Frame, Number Of Spans In Main Unit: 1, Length of Maximum Span: 4.3m (14.1ft), Curb-To-Curb Width: 39.0m (128.0ft), Out-to-Out Width: 40.2m (131.9ft) Condition: Deck: Good, Superstructure: Good, Substructure: Satisfactory, Operating Rating: 65.7 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 32.4 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Superior to present desirable criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: July 2007, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: I 809E, Location: WEST OF BATTLE MTN (Lat: 40.908333, Lng: -117.318333), Route carried "on" structure: Interstate 80, Year Built: 1959, Status: Open, Structure Length: 0.49m (1.61ft), Average Daily Traffic: 3,750 (year 2006), Truck Traffic: 36%, Average Future Daily Traffic: 7,200 (year 2026), Design Load: HS 20+Mod, Features Intersected: IRON POINT RD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 328.501, Lanes on structure: 3, Lanes under structure: 1, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 11.6m (38.1ft), Material/Design: Concrete, Design/Construction: Frame, Number Of Spans In Main Unit: 1, Length of Maximum Span: 4.3m (14.1ft), Curb-To-Curb Width: 13.1m (43.0ft), Out-to-Out Width: 14.0m (45.9ft) Condition: Deck: Good, Superstructure: Good, Substructure: Satisfactory, Operating Rating: 65.7 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 32.4 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: July 2007, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: I 809W, Location: WEST OF BATTLE MTN (Lat: 40.908333, Lng: -117.318333), Route carried "on" structure: Interstate 80, Year Built: 1959, Status: Open, Structure Length: 0.49m (1.61ft), Average Daily Traffic: 3,750 (year 2006), Truck Traffic: 36%, Average Future Daily Traffic: 7,200 (year 2026), Design Load: HS 20+Mod, Features Intersected: IRON POINT RD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 328.501, Lanes on structure: 2, Lanes under structure: 1, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 11.6m (38.1ft), Material/Design: Concrete, Design/Construction: Frame, Number Of Spans In Main Unit: 1, Length of Maximum Span: 4.3m (14.1ft), Curb-To-Curb Width: 12.4m (40.7ft), Out-to-Out Width: 13.5m (44.3ft) Condition: Deck: Good, Superstructure: Good, Substructure: Satisfactory, Operating Rating: 65.7 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 32.4 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Better than present minimum criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: July 2007, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: I 877E, Location: WEST OF BATTLE MTN (Lat: 40.736667, Lng: -117.053333), Route carried "on" structure: Interstate 80, Year Built: 1963, Status: Open, Structure Length: 0.67m (2.20ft), Average Daily Traffic: 3,590 (year 2006), Truck Traffic: 37%, Average Future Daily Traffic: 7,350 (year 2026), Design Load: HS 20+Mod, Features Intersected: MOTE RD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 358.348, Lanes on structure: 2, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 11.6m (38.1ft), Skew: 10 degrees, Material/Design: Concrete, Design/Construction: Frame, Number Of Spans In Main Unit: 1, Length of Maximum Span: 6.1m (20.0ft), Curb-To-Curb Width: 11.6m (38.1ft), Out-to-Out Width: 13.1m (43.0ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Inventory Rating: 61.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Equal to present minimum criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: July 2007, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Preformed Fabric Find on map >>
Structure Number: I 877W, Location: WEST OF BATTLE MTN (Lat: 40.736667, Lng: -117.053333), Route carried "on" structure: Interstate 80, Year Built: 1963, Status: Open, Structure Length: 0.67m (2.20ft), Average Daily Traffic: 3,590 (year 2006), Truck Traffic: 37%, Average Future Daily Traffic: 7,350 (year 2026), Design Load: HS 20+Mod, Features Intersected: MOTE RD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 358.348, Lanes on structure: 2, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 11.6m (38.1ft), Skew: 10 degrees, Material/Design: Concrete, Design/Construction: Frame, Number Of Spans In Main Unit: 1, Length of Maximum Span: 6.1m (20.0ft), Curb-To-Curb Width: 11.6m (38.1ft), Out-to-Out Width: 13.1m (43.0ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Inventory Rating: 61.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Equal to present minimum criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: July 2007, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Preformed Fabric Find on map >>
Structure Number: I 878, Location: BATTLE MOUNTAIN (Lat: 40.658333, Lng: -116.956667), Route carried "on" structure: Business State highway 304, Year Built: 1976, Status: Open, Structure Length: 9.85m (32.32ft), Average Daily Traffic: 2,400 (year 2006), Truck Traffic: 9%, Average Future Daily Traffic: 3,525 (year 2026), Design Load: HS 20+Mod, Features Intersected: I 80 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 370.477, Lanes on structure: 3, Lanes under structure: 4, Owner: State Highway Agency, Approaching Roadway Width: 12.2m (40.0ft), Skew: 2 degrees, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Number Of Spans In Main Unit: 2, Length of Maximum Span: 48.8m (160.1ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 0.0m, Curb-To-Curb Width: 14.6m (47.9ft), Out-to-Out Width: 17.3m (56.8ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 74.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: August 2007, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Preformed Fabric Find on map >>
Structure Number: I 879, Location: BATTLE MOUNTAIN (Lat: 40.625000, Lng: -116.941667), Route carried "on" structure: State highway 305, Year Built: 1976, Status: Open, Structure Length: 8.93m (29.30ft), Average Daily Traffic: 2,100 (year 2006), Truck Traffic: 23%, Average Future Daily Traffic: 4,400 (year 2026), Design Load: HS 20+Mod, Features Intersected: I 80 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 4, Owner: State Highway Agency, Approaching Roadway Width: 11.0m (36.1ft), Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Number Of Spans In Main Unit: 2, Length of Maximum Span: 43.9m (144.0ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 1.5m (4.9ft), Curb-To-Curb Width: 11.0m (36.1ft), Out-to-Out Width: 15.4m (50.5ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Inventory Rating: 38.9 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: August 2007, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Preformed Fabric Find on map >>
Structure Number: I 882, Location: BATTLE MOUNTAIN (Lat: 40.621667, Lng: -116.908333), Route carried "on" structure: State highway 304, Year Built: 1976, Status: Open, Structure Length: 9.75m (31.99ft), Average Daily Traffic: 2,090 (year 2006), Truck Traffic: 9%, Average Future Daily Traffic: 3,000 (year 2026), Design Load: HS 20+Mod, Features Intersected: I 80 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 4, Owner: State Highway Agency, Approaching Roadway Width: 12.2m (40.0ft), Skew: 6 degrees, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Number Of Spans In Main Unit: 2, Length of Maximum Span: 48.8m (160.1ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 1.5m (4.9ft), Curb-To-Curb Width: 14.6m (47.9ft), Out-to-Out Width: 16.9m (55.4ft) Condition: Deck: Good, Superstructure: Satisfactory, Substructure: Good, Operating Rating: 71.2 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: August 2007, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: I 883E, Location: EAST OF BATTLE MTN (Lat: 40.695000, Lng: -116.553333), Route carried "on" structure: Interstate 80, Year Built: 1962, Year Reconstructed: 1983, Status: Open, Structure Length: 2.87m (9.42ft), Average Daily Traffic: 3,375 (year 2006), Truck Traffic: 31%, Average Future Daily Traffic: 6,000 (year 2026), Design Load: HS 20+Mod, Features Intersected: FRONTAGE ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 409.468, Lanes on structure: 2, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 11.6m (38.1ft), Material/Design: Concrete continuous, Design/Construction: Slab, Number Of Spans In Main Unit: 3, Length of Maximum Span: 10.7m (35.1ft), Curb-To-Curb Width: 11.6m (38.1ft), Out-to-Out Width: 13.1m (43.0ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 45.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 26.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Equal to present minimum criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: July 2007, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: I 883W, Location: EAST OF BATTLE MTN (Lat: 40.695000, Lng: -116.553333), Route carried "on" structure: Interstate 80, Year Built: 1962, Year Reconstructed: 1983, Status: Open, Structure Length: 2.87m (9.42ft), Average Daily Traffic: 3,375 (year 2006), Truck Traffic: 31%, Average Future Daily Traffic: 6,000 (year 2026), Design Load: HS 20+Mod, Features Intersected: FRONTAGE ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 409.468, Lanes on structure: 2, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 11.6m (38.1ft), Material/Design: Concrete continuous, Design/Construction: Slab, Number Of Spans In Main Unit: 3, Length of Maximum Span: 10.7m (35.1ft), Curb-To-Curb Width: 11.6m (38.1ft), Out-to-Out Width: 13.1m (43.0ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 45.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 26.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Equal to present minimum criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: July 2007, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: M 818B, Location: NEAR BATTLE MOUNTAIN (Lat: 39.775000, Lng: -117.133333), Route carried "on" structure: State highway 305, Year Built: 1959, Status: Open, Structure Length: 1.22m (4.00ft), Average Daily Traffic: 230 (year 2005), Truck Traffic: 23%, Average Future Daily Traffic: 550 (year 2026), Features Intersected: REESE RVR Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 8.0m (26.2ft), Skew: 3 degrees, Material/Design: Steel, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 5.5m (18.0ft) Condition: Channel: Satisfactory, Culverts: Good, Operating Rating: 65.7 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 32.4 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Better than present minimum criteria, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.89m (6.20ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2007, Bridge Improvement Cost: $152,000, Roadway Improvement Cost: $15,000, Total Project Cost: $228,000 ( Estimate for 2004) Find on map >>
Structure Number: I 878, Location: BATTLE MOUNTAIN (Lat: 40.658333, Lng: -116.956667), Route carried "under" structure: Interstate 80, Year Built: 1976, Structure Length: 9.85m (32.32ft), Average Daily Traffic: 6,210 (year 2006), Truck Traffic: 6%, Features Intersected: I 80, Facility Carried by Structure: SR304 FRONT ST Minimum Vertical Clearance: 5.18m (16.99ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 48.8m (160.1ft) Find on map >>
Structure Number: I 879, Location: BATTLE MOUNTAIN (Lat: 40.625000, Lng: -116.941667), Route carried "under" structure: Interstate 80, Year Built: 1976, Structure Length: 8.93m (29.30ft), Average Daily Traffic: 5,620 (year 2006), Truck Traffic: 4%, Features Intersected: I 80, Facility Carried by Structure: SR305 BROAD ST Minimum Vertical Clearance: 5.38m (17.65ft), Kilometerpoint: 140.053, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 43.9m (144.0ft) Find on map >>
Structure Number: I 882, Location: BATTLE MOUNTAIN (Lat: 40.621667, Lng: -116.908333), Route carried "under" structure: Interstate 80, Year Built: 1976, Structure Length: 9.75m (31.99ft), Average Daily Traffic: 6,200 (year 2006), Truck Traffic: 3%, Features Intersected: I 80, Facility Carried by Structure: SR304 FRONT ST Minimum Vertical Clearance: 5.03m (16.50ft), Kilometerpoint: 375.873, Lanes on structure: 3, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 48.8m (160.1ft) Discuss this city on our hugely popular Nevada forum Back to: Battle Mountain, NV, Nevada, All US cities.
|
![]() |