Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Berlin, Pennsylvania (PA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 12Number of bridges
  • 59ft / 18.1mTotal length
  • $3,067,000Total costs
  • 42,979Total average daily traffic
  • 12,037Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Berlin
  • No street view available for this location

New bridges in Berlin, PA - historical statistics
  • New bridges - historical statistics
  • 11900-1909
  • 11910-1919
  • 21940-1949
  • 11950-1959
  • 21990-1999
  • 22000-2009
  • 22010-2019
  • 12020-2022
Reconstructed bridges in Berlin, PA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11950-1959
  • 01960-1969
  • 01970-1979
  • 01980-1989
  • 21990-1999
Average Bridge Daily Traffic in Berlin, PA
Average Bridge Truck Traffic in Berlin, PA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 12.5%Excellent
  • 25.0%Very good
  • 37.5%Good
  • 25.0%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 20.0%Excellent
  • 20.0%Very good
  • 20.0%Good
  • 30.0%Fair
  • 10.0%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 10.0%Excellent
  • 20.0%Very good
  • 20.0%Good
  • 40.0%Satisfactory
  • 10.0%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 10.0%Excellent
  • 10.0%Very good
  • 20.0%Good
  • 30.0%Satisfactory
  • 20.0%Fair
  • 10.0%Poor
Find on map >>   Show street view

Structure Number: 31344,  Location: .6 MI.W.OF ROXBURY (Lat: 39.954092,  Lng: -78.920142),  Route carried "on" structure: State highway 31,  Year Built: 1941,  Year Reconstructed: 1956,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 2,006 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 3,266 (year 2032),  Design Load: H 20,  Features Intersected: TR.STONY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 34.335,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Poor,  Operating Rating: 50.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.50m (4.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $52,000,  Roadway Improvement Cost: $264,000,  Total Project Cost: $707,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 31359,  Location: 1.5 MI.S.OF BERLIN (Lat: 39.898419,  Lng: -78.954000),  Route carried "on" structure: State highway 160,  Year Built: 1900,  Year Reconstructed: 2001,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 1,968 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 3,014 (year 2032),  Features Intersected: BUFFALO CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 26.479,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Masonry,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Superstructure: Poor,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.10m (29.86ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: April 2020,  Other Special Inspection Date: April 2021
Find on map >>   Show street view

Structure Number: 31384,  Location: 2 MI.S.OF BERLIN (Lat: 39.902900,  Lng: -79.000725),  Route carried "on" structure: State highway ,  Year Built: 1997,  Status: Open,  Structure Length: 1.89m (6.20ft),  Average Daily Traffic: 1,031 (year 2020),  Truck Traffic: 23%,  Average Future Daily Traffic: 2,601 (year 2032),  Design Load: HS 25 or greater,  Features Intersected: BUFFALO CREEK,  Facility Carried by Structure: SR 2047
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.771,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.5m (41.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.3m (43.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.50m (8.20ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: December 2018,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 31386,  Location: 1.5 MI.N.OF BERLIN (Lat: 39.938867,  Lng: -78.983008),  Route carried "on" structure: State highway ,  Year Built: 1951,  Year Reconstructed: 2021,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 4,051 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 5,977 (year 2032),  Design Load: HS 20,  Features Intersected: TRIB MILLER RUN,  Facility Carried by Structure: SR 2047
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 23.511,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.8m (32.2ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.3m (43.6ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $49,000,  Roadway Improvement Cost: $264,000,  Total Project Cost: $660,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 31652,  Location: 1.5 MI.SW.OF BERLIN (Lat: 39.900442,  Lng: -78.978200),  Route carried "on" structure: State highway ,  Year Built: 1941,  Year Reconstructed: 2001,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 233 (year 2022),  Truck Traffic: 9%,  Average Future Daily Traffic: 549 (year 2032),  Design Load: H 20,  Features Intersected: BUFFALO CREEK,  Facility Carried by Structure: SR 2027
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.890,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.8m (42.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 64.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.70m (5.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $55,000,  Roadway Improvement Cost: $264,000,  Total Project Cost: $743,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Galvanized Reinforcing
Find on map >>   Show street view

Structure Number: 31815,  Location: NEAR BROTHERTON (Lat: 39.975000,  Lng: -78.941667),  Route carried "on" structure: City street ,  Year Built: 2002,  Status: Open,  Structure Length: 4.75m (15.58ft),  Average Daily Traffic: 200 (year 1992),  Truck Traffic: 8%,  Average Future Daily Traffic: 315 (year 2030),  Design Load: HL 93,  Features Intersected: PA TPK (I-76),  Facility Carried by Structure: T-513 Horse Track
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Toll Authority,  Approaching Roadway Width: 8.2m (26.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 46.9m (153.9ft),  Curb-To-Curb Width: 8.4m (27.6ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Inventory Rating: 66.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.40m (11.15ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: April 2019,  Bridge Improvement Cost: $17,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $228,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 3184,  Location: 2 MI.SW.OF BERLIN (Lat: 39.909211,  Lng: -78.997467),  Route carried "on" structure: City street ,  Year Built: 1916,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 50 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 63 (year 2041),  Features Intersected: MILLER RUN,  Facility Carried by Structure: T618, OLDMILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.0m (13.1ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.8m (42.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 4.6m (15.1ft),  Out-to-Out Width: 5.3m (17.4ft)

Condition: Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.60m (5.25ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $54,000,  Roadway Improvement Cost: $264,000,  Total Project Cost: $729,000
Find on map >>   Show street view

Structure Number: 47982,  Location: 2.5Mi SW of Berlin (Lat: 39.897661,  Lng: -78.992347),  Route carried "on" structure: City street ,  Year Built: 1990,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 50 (year 2021),  Truck Traffic: 2%,  Average Future Daily Traffic: 63 (year 2041),  Design Load: HS 20,  Features Intersected: Buffalo Creek,  Facility Carried by Structure: T616,Buffalo Crk R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 3.7m (12.1ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021
Find on map >>   Show street view

Structure Number: 48753,  Location: SALCO (Lat: 39.901122,  Lng: -78.940817),  Route carried "on" structure: State highway ,  Year Built: 2014,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 160 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 228 (year 2034),  Design Load: HL 93,  Features Intersected: BUFFALO CREEK,  Facility Carried by Structure: SR 2023
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.165,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.0m (36.1ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 56.7 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 38.9 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.13m (3.71ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: Febuary 2020,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 53981,  Location: 0.5 MI EAST OF SR 1005 (Lat: 39.964969,  Lng: -78.947725),  Route carried "on" structure: State highway 31,  Year Built: 2017,  Status: Open,  Structure Length: 2.23m (7.32ft),  Average Daily Traffic: 3,352 (year 2020),  Truck Traffic: 14%,  Average Future Daily Traffic: 3,321 (year 2032),  Design Load: HL 93,  Features Intersected: SANDY HOLLOW CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 31.672,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Maintenance Responsibility: Private,  Approaching Roadway Width: 9.4m (30.8ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.0m (68.9ft),  Curb-To-Curb Width: 12.4m (40.7ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Very good,  Channel: Good,  Operating Rating: 52.2 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 40.2 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 67796,  Location: .2 MI.NW.OF BERLIN (Lat: 39.929764,  Lng: -78.975228),  Route carried "on" structure: State highway ,  Year Built: 2020,  Status: Open,  Structure Length: 1.62m (5.31ft),  Average Daily Traffic: 426 (year 2022),  Truck Traffic: 13%,  Average Future Daily Traffic: 450 (year 2030),  Design Load: HL 93,  Features Intersected: MILLERS RUN,  Facility Carried by Structure: SR 3010
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 23.773,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Excellent,  Operating Rating: 52.5 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 36.0 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.60m (5.25ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 31815,  Location: NEAR BROTHERTON (Lat: 39.975000,  Lng: -78.941667),  Route carried "under" structure: Other road 76,  Year Built: 2002,  Structure Length: 0. m,  Average Daily Traffic: 29,452 (year 1999),  Truck Traffic: 36%,  Features Intersected: PA TPK (I-76),  Facility Carried by Structure: T-513 Horse Track
Minimum Vertical Clearance: 5.33m (17.49ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 46.9m (153.9ft)

Discuss Berlin, Pennsylvania (PA) on our hugely popular Pennsylvania forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.