Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Bonifay, Florida (FL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 27Number of bridges
  • 253ft / 77.1mTotal length
  • 152,908Total average daily traffic
  • 39,435Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Bonifay
  • No street view available for this location

New bridges in Bonifay, FL - historical statistics
  • New bridges - historical statistics
  • 41950-1959
  • 21960-1969
  • 131970-1979
  • 21980-1989
  • 11990-1999
  • 22000-2009
  • 32010-2019
Reconstructed bridges in Bonifay, FL - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 12000-2009
  • 02010-2019
  • 12020-2022
Average Bridge Daily Traffic in Bonifay, FL
Average Bridge Truck Traffic in Bonifay, FL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 42.9%Good
  • 42.9%Satisfactory
  • 14.3%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 7.1%Very good
  • 64.3%Good
  • 14.3%Satisfactory
  • 7.1%Fair
  • 7.1%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 57.1%Good
  • 35.7%Satisfactory
  • 7.1%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 21.1%Very good
  • 36.8%Good
  • 26.3%Satisfactory
  • 5.3%Fair
  • 5.3%Poor
  • 5.3%Serious
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 44.4%Good
  • 44.4%Satisfactory
  • 11.1%Serious
Find on map >>   Show street view

Structure Number: 520002,  Location: 2.7mi. West of SR79 (Lat: 30.794614,  Lng: -85.723617),  Route carried "on" structure: US 90,  Year Built: 1954,  Status: Open,  Structure Length: 1.36m (4.46ft),  Average Daily Traffic: 3,200 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 5,552 (year 2042),  Design Load: H 15,  Features Intersected: Gum Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 33.507,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 62.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020
Find on map >>   Show street view

Structure Number: 520056,  Location: 0.6 miles West of SR79 (Lat: 30.763142,  Lng: -85.695997),  Route carried "on" structure: County highway 173,  Year Built: 1974,  Status: Open,  Structure Length: 7.42m (24.34ft),  Average Daily Traffic: 750 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 1,301 (year 2042),  Design Load: H 20,  Features Intersected: I10 SR8
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.184,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 27.2m (89.2ft),  Curb-To-Curb Width: 9.7m (31.8ft),  Out-to-Out Width: 9.7m (31.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 47.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 520065,  Location: 3.1Mi. West of SR79 (Lat: 30.793972,  Lng: -85.730611),  Route carried "on" structure: US 90,  Year Built: 1954,  Status: Open,  Structure Length: 0.63m (2.07ft),  Average Daily Traffic: 3,200 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 5,552 (year 2042),  Design Load: HS 20+Mod,  Features Intersected: Little Gum Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 32.787,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 72.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020
Find on map >>   Show street view

Structure Number: 520066,  Location: 1.7Mi. West of SR79 (Lat: 30.791028,  Lng: -85.708111),  Route carried "on" structure: US 90,  Year Built: 1954,  Year Reconstructed: 2000,  Status: Open,  Structure Length: 0.63m (2.07ft),  Average Daily Traffic: 5,700 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 9,890 (year 2042),  Design Load: HS 20+Mod,  Features Intersected: Branch
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 35.052,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 75.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020
Find on map >>   Show street view

Structure Number: 520075,  Location: 1.8Mi South of US90 SR10 (Lat: 30.762611,  Lng: -85.684725),  Route carried "on" structure: Interstate 10,  Year Built: 1974,  Status: Open,  Structure Length: 6.55m (21.49ft),  Average Daily Traffic: 9,150 (year 2020),  Truck Traffic: 35%,  Average Future Daily Traffic: 15,875 (year 2042),  Design Load: HS 20,  Features Intersected: SR79
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 27.686,  Lanes on structure: 2,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 21.6m (70.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 57.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 520076,  Location: 1.8mi South of US90 SR10 (Lat: 30.762856,  Lng: -85.684747),  Route carried "on" structure: Interstate 10,  Year Built: 1974,  Status: Open,  Structure Length: 6.45m (21.16ft),  Average Daily Traffic: 9,150 (year 2020),  Truck Traffic: 35%,  Average Future Daily Traffic: 15,875 (year 2042),  Design Load: HL 93,  Features Intersected: SR79
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 27.686,  Lanes on structure: 2,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 21.7m (71.2ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 50.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 39.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 520077,  Location: 2.2mi. East of SR79 (Lat: 30.759886,  Lng: -85.647497),  Route carried "on" structure: Interstate 10,  Year Built: 1974,  Status: Open,  Structure Length: 5.49m (18.01ft),  Average Daily Traffic: 9,150 (year 2020),  Truck Traffic: 35%,  Average Future Daily Traffic: 15,875 (year 2042),  Design Load: HS 20,  Features Intersected: Camp Branch
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 31.299,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 13.7m (44.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 520078,  Location: 2.2mi. East of SR79 (Lat: 30.759586,  Lng: -85.647378),  Route carried "on" structure: Interstate 10,  Year Built: 1974,  Status: Open,  Structure Length: 5.49m (18.01ft),  Average Daily Traffic: 9,150 (year 2020),  Truck Traffic: 35%,  Average Future Daily Traffic: 15,875 (year 2042),  Design Load: HS 20,  Features Intersected: Camp Branch
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 31.299,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 13.7m (44.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 520079,  Location: 3.2mi. East of SR79 (Lat: 30.756661,  Lng: -85.629744),  Route carried "on" structure: County highway ,  Year Built: 1975,  Status: Open,  Structure Length: 7.47m (24.51ft),  Average Daily Traffic: 55 (year 2014),  Average Future Daily Traffic: 99 (year 2036),  Design Load: HS 20,  Features Intersected: I10 SR8,  Facility Carried by Structure: Holmestead Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.381,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 26.8m (87.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 520082,  Location: 2.6 Miles North of SR 79 (Lat: 30.855456,  Lng: -85.687986),  Route carried "on" structure: County highway 177,  Year Built: 1977,  Status: Open,  Structure Length: 3.06m (10.04ft),  Average Daily Traffic: 1,800 (year 2019),  Truck Traffic: 11%,  Average Future Daily Traffic: 2,250 (year 2039),  Features Intersected: Gum Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.202,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.2m (33.5ft),  Curb-To-Curb Width: 12.1m (39.7ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 520183,  Location: 1.9 miles East of SR79 (Lat: 30.782506,  Lng: -85.648150),  Route carried "on" structure: US 90,  Year Built: 2014,  Status: Open,  Structure Length: 5.24m (17.19ft),  Average Daily Traffic: 6,000 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 10,410 (year 2042),  Design Load: HL 93,  Features Intersected: Camp Branch
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 40.927,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 26.2m (86.0ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.4m (47.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 41.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 52402,  Location: 0.4 Mi North of US90/SR10 (Lat: 30.792653,  Lng: -85.658933),  Route carried "on" structure: Other road ,  Year Built: 1981,  Status: Posted for load,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 36 (year 2020),  Average Future Daily Traffic: 40 (year 2040),  Design Load: HL 93,  Features Intersected: Unnamed Branch,  Facility Carried by Structure: Joe White Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.629,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.1m (13.5ft),  Curb-To-Curb Width: 4.3m (14.1ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 16.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 12.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: January 2021,  Other Special Inspection Date: January 2022,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 524023,  Location: 1.46 Miles East of SR 79 (Lat: 30.751700,  Lng: -85.668233),  Route carried "on" structure: County highway ,  Year Built: 1992,  Year Reconstructed: 2020,  Status: Open,  Structure Length: 1.40m (4.59ft),  Average Daily Traffic: 900 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 990 (year 2040),  Design Load: HL 93,  Features Intersected: Open Creek,  Facility Carried by Structure: Thomas Drive
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.358,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.9m (22.6ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.6m (15.1ft),  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: December 2020,  Underwater Inspection Date: December 2021,  Other Special Inspection Date: December 2021,  Deck Structure Type: Steel plate
Find on map >>   Show street view

Structure Number: 524176,  Location: 1.4 Miles East of SR 79 (Lat: 30.794000,  Lng: -85.656139),  Route carried "on" structure: Other road ,  Year Built: 2012,  Status: Open,  Structure Length: 0.87m (2.85ft),  Average Daily Traffic: 40 (year 2019),  Average Future Daily Traffic: 44 (year 2039),  Design Load: HL 93,  Features Intersected: Camp Branch,  Facility Carried by Structure: Bonifay Chipley Rd
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.251,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.5m (21.3ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 54.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 42.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020
Find on map >>   Show street view

Structure Number: 524503,  Location: 1.9 Mi West of SR79 (Lat: 30.808403,  Lng: -85.709278),  Route carried "on" structure: County highway 177A,  Year Built: 1965,  Status: Open,  Structure Length: 0.63m (2.07ft),  Average Daily Traffic: 1,700 (year 2019),  Truck Traffic: 17%,  Average Future Daily Traffic: 1,870 (year 2039),  Design Load: HS 20,  Features Intersected: Bear Bay Branch
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.169,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.1m (10.2ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 80.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021
Find on map >>   Show street view

Structure Number: 610001,  Location: 3.0Mi. West of SR277 (Lat: 30.778586,  Lng: -85.615833),  Route carried "on" structure: US 90,  Year Built: 1953,  Status: Open,  Structure Length: 14.08m (46.19ft),  Average Daily Traffic: 4,152 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 7,204 (year 2042),  Design Load: HS 20,  Features Intersected: Holmes Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.453,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 14,  Length of Maximum Span: 10.1m (33.1ft),  Curb-To-Curb Width: 10.6m (34.8ft),  Out-to-Out Width: 11.4m (37.4ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: August 2021,  Other Special Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 610026,  Location: 0.5Mi N of Bess Nook Rd (Lat: 30.731056,  Lng: -85.737286),  Route carried "on" structure: County highway 173,  Year Built: 1964,  Status: Open,  Structure Length: 1.35m (4.43ft),  Average Daily Traffic: 650 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,128 (year 2042),  Features Intersected: Gum Creek No. 2
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.746,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.8m (22.3ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.5m (11.5ft)

Condition: Channel: Serious,  Culverts: Serious,  Operating Rating: 65.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 50.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 6 months,  Other Special Inspection Frequency: Every 6 months,  Inspection Date: November 2020,  Underwater Inspection Date: November 2021,  Other Special Inspection Date: November 2021
Find on map >>   Show street view

Structure Number: 610054,  Location: 4.3mi. East of CR279 (Lat: 30.760917,  Lng: -85.741806),  Route carried "on" structure: Interstate 10,  Year Built: 1974,  Status: Open,  Structure Length: 0.87m (2.85ft),  Average Daily Traffic: 9,350 (year 2020),  Truck Traffic: 37%,  Average Future Daily Traffic: 16,222 (year 2042),  Design Load: HS 20,  Features Intersected: Gum Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.764,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.7m (8.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021
Find on map >>   Show street view

Structure Number: 610055,  Location: 4.3mi. East of CR279 (Lat: 30.759667,  Lng: -85.741806),  Route carried "on" structure: Interstate 10,  Year Built: 1974,  Status: Open,  Structure Length: 0.87m (2.85ft),  Average Daily Traffic: 9,350 (year 2020),  Truck Traffic: 37%,  Average Future Daily Traffic: 16,222 (year 2042),  Design Load: HS 20,  Features Intersected: Gum Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.774,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.7m (8.9ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021
Find on map >>   Show street view

Structure Number: 610148,  Location: 1.5 Miles S. of I10 SR8 (Lat: 30.740153,  Lng: -85.685156),  Route carried "on" structure: State highway 79,  Year Built: 2008,  Status: Open,  Structure Length: 3.90m (12.80ft),  Average Daily Traffic: 5,000 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 8,675 (year 2042),  Design Load: HS 20,  Features Intersected: Open Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 45.633,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 9.8m (32.2ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.4m (47.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 80.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 610154,  Location: 4.1 Miles South of I10 (Lat: 30.703139,  Lng: -85.686056),  Route carried "on" structure: State highway 79,  Year Built: 2017,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 3,300 (year 2016),  Truck Traffic: 9%,  Average Future Daily Traffic: 5,799 (year 2037),  Design Load: HL 93,  Features Intersected: Stream
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 41.553,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Satisfactory,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021
Find on map >>   Show street view

Structure Number: 614139,  Location: 2.2 Mi East of Hwy 90 (Lat: 30.770369,  Lng: -85.740311),  Route carried "on" structure: County highway ,  Year Built: 1984,  Status: Posted for load,  Structure Length: 0.92m (3.02ft),  Average Daily Traffic: 50 (year 2021),  Average Future Daily Traffic: 87 (year 2042),  Design Load: HS 20,  Features Intersected: Gum Creek,  Facility Carried by Structure: Sandpath Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.330,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.6m (15.1ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.7m (15.4ft),  Curb-To-Curb Width: 5.0m (16.4ft),  Out-to-Out Width: 5.0m (16.4ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Poor,  Operating Rating: 26.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 19.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: September 2020,  Underwater Inspection Date: September 2021,  Other Special Inspection Date: September 2021,  Deck Structure Type: Wood or Timber
Find on map >>   Show street view

Structure Number: 614144,  Location: 0.25 Mi North of SR 173 (Lat: 30.738714,  Lng: -85.736103),  Route carried "on" structure: County highway ,  Year Built: 2002,  Status: Posted for load,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 75 (year 2021),  Average Future Daily Traffic: 130 (year 2042),  Features Intersected: Gum Creek,  Facility Carried by Structure: King Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.342,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.0m (13.1ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.7m (15.4ft),  Curb-To-Curb Width: 5.0m (16.4ft),  Out-to-Out Width: 5.0m (16.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 28.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 20.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: July 2020,  Other Special Inspection Date: July 2021,  Deck Structure Type: Wood or Timber
Find on map >>   Show street view

Structure Number: 520056,  Location: 0.6 miles West of SR79 (Lat: 30.763142,  Lng: -85.695997),  Route carried "under" structure: Interstate 10,  Year Built: 1974,  Structure Length: 0. m,  Average Daily Traffic: 18,700 (year 2020),  Truck Traffic: 37%,  Features Intersected: I10 SR8,  Facility Carried by Structure: CR173
Minimum Vertical Clearance: 5.00m (16.40ft),  Kilometerpoint: 26.630,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.2m (89.2ft)

Find on map >>   Show street view

Structure Number: 520075,  Location: 1.8Mi South of US90 SR10 (Lat: 30.762611,  Lng: -85.684725),  Route carried "under" structure: State highway 79,  Year Built: 1974,  Structure Length: 0. m,  Average Daily Traffic: 12,000 (year 2020),  Truck Traffic: 11%,  Features Intersected: SR79,  Facility Carried by Structure: I10 SR8
Minimum Vertical Clearance: 5.27m (17.29ft),  Kilometerpoint: 1.999,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.6m (70.9ft)

Find on map >>   Show street view

Structure Number: 520076,  Location: 1.8mi South of US90 SR10 (Lat: 30.762856,  Lng: -85.684747),  Route carried "under" structure: State highway 79,  Year Built: 1974,  Structure Length: 0. m,  Average Daily Traffic: 12,000 (year 2020),  Truck Traffic: 11%,  Features Intersected: SR79,  Facility Carried by Structure: I10 SR8
Minimum Vertical Clearance: 4.88m (16.01ft),  Kilometerpoint: 2.026,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.7m (71.2ft)

Find on map >>   Show street view

Structure Number: 520079,  Location: 3.2mi. East of SR79 (Lat: 30.756661,  Lng: -85.629744),  Route carried "under" structure: Interstate 10,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 18,300 (year 2020),  Truck Traffic: 35%,  Features Intersected: I10 SR8,  Facility Carried by Structure: Holmestead Road
Minimum Vertical Clearance: 4.82m (15.81ft),  Kilometerpoint: 33.048,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.8m (87.9ft)

Discuss Bonifay, Florida (FL) on our hugely popular Florida forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.