![]() |
Bridge Statistics for Chenango, New York (NY) - Condition, Traffic, Stress, Structural Evaluation, Project CostsBack to: Chenango, NY, New York, New York forum, All US cities. National Bridge Inventory (NBI) Statistics Number of bridges: 43 Total length: 515 meters (1,690ft) Total costs: $63,566,000 Total average daily traffic: 430,748 Total average daily truck traffic: 65,813 National Bridge Inventory (NBI) Registered Bridges for Chenango
Bridge Condition - Deck Bridge Condition - Superstructure Bridge Condition - Substructure Bridge Condition - Channel Bridge Condition - Culverts Find on map >>
Structure Number: 1008201, Location: 2.5 MI N OF N BING CTY LI (Lat: 42.152997, Lng: -75.897475), Route carried "on" structure: Interstate 81, Year Built: 1966, Status: Open, Structure Length: 6.09m (19.98ft), Average Daily Traffic: 10,989 (year 2005), Truck Traffic: 23%, Average Future Daily Traffic: 17,533 (year 2025), Design Load: HS 20+Mod, Features Intersected: RTE 11 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 5.279, Lanes on structure: 3, Lanes under structure: 3, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 14.3m (46.9ft), Skew: 5 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 5, Length of Maximum Span: 27.4m (89.9ft), Curb or Sidewalk Widths: Left: 0.4m (1.3ft), Right: 0.4m (1.3ft), Curb-To-Curb Width: 12.1m (39.7ft), Out-to-Out Width: 13.7m (44.9ft) Condition: Deck: Good, Superstructure: Good, Substructure: Fair, Operating Rating: 59.0 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of corrective action, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 6.09m (19.98ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2007, Bridge Improvement Cost: $1,808,000, Roadway Improvement Cost: $1,075,000, Total Project Cost: $2,883,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete Find on map >>
Structure Number: 1008202, Location: 2.5 MI N OF N BING CTY LI (Lat: 42.153350, Lng: -75.897314), Route carried "on" structure: Interstate 81, Year Built: 1966, Status: Open, Structure Length: 6.37m (20.90ft), Average Daily Traffic: 10,989 (year 2005), Truck Traffic: 23%, Average Future Daily Traffic: 17,533 (year 2025), Design Load: HS 20+Mod, Features Intersected: RTE 11 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 5.278, Lanes on structure: 2, Lanes under structure: 3, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 10.6m (34.8ft), Skew: 5 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 5, Length of Maximum Span: 29.2m (95.8ft), Curb or Sidewalk Widths: Left: 0.4m (1.3ft), Right: 0.4m (1.3ft), Curb-To-Curb Width: 8.5m (27.9ft), Out-to-Out Width: 10.1m (33.1ft) Condition: Deck: Good, Superstructure: Good, Substructure: Fair, Operating Rating: 59.0 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 35.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of corrective action, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 6.37m (20.90ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2007, Bridge Improvement Cost: $1,388,000, Roadway Improvement Cost: $825,000, Total Project Cost: $2,213,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete Find on map >>
Structure Number: 100821, Location: 0.1 MI S JCT US 11 & SH 1 (Lat: 42.160356, Lng: -75.894628), Route carried "on" structure: US 11, Year Built: 1983, Status: Open, Structure Length: 1.24m (4.07ft), Average Daily Traffic: 28,326 (year 2005), Truck Traffic: 5%, Average Future Daily Traffic: 36,957 (year 2025), Design Load: HS 20, Features Intersected: DORMAN CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 4.965, Lanes on structure: 5, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 20.7m (67.9ft), Skew: 20 degrees, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Number Of Spans In Main Unit: 1, Length of Maximum Span: 12.1m (39.7ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 1.5m (4.9ft), Curb-To-Curb Width: 20.7m (67.9ft), Out-to-Out Width: 24.5m (80.4ft) Condition: Deck: Fair, Superstructure: Good, Substructure: Very good, Channel: Good, Operating Rating: 73.5 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 34.5 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.24m (4.07ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2006, Bridge Improvement Cost: $1,388,000, Roadway Improvement Cost: $825,000, Total Project Cost: $2,213,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 100822, Location: JCT US 11 & SH 12 (Lat: 42.161431, Lng: -75.893744), Route carried "on" structure: US 11, Year Built: 1975, Status: Open, Structure Length: 2.68m (8.79ft), Average Daily Traffic: 12,612 (year 2005), Truck Traffic: 6%, Average Future Daily Traffic: 15,741 (year 2025), Design Load: HS 20, Features Intersected: CASTLE CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 5.152, Lanes on structure: 5, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 18.8m (61.7ft), Skew: 2 degrees, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Number Of Spans In Main Unit: 1, Length of Maximum Span: 25.6m (84.0ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 1.5m (4.9ft), Curb-To-Curb Width: 18.8m (61.7ft), Out-to-Out Width: 22.7m (74.5ft) Condition: Deck: Fair, Superstructure: Satisfactory, Substructure: Good, Channel: Good, Operating Rating: 63.5 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 38.1 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Meets minimum limits, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.68m (8.79ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2006, Bridge Improvement Cost: $518,000, Roadway Improvement Cost: $296,000, Total Project Cost: $814,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Integral Concrete Find on map >>
Structure Number: 1008231, Location: 0.2 MI NW JCT RTS 11 + 12 (Lat: 42.164992, Lng: -75.896156), Route carried "on" structure: Interstate 81, Year Built: 1966, Status: Open, Structure Length: 5.88m (19.29ft), Average Daily Traffic: 12,573 (year 2006), Truck Traffic: 23%, Average Future Daily Traffic: 20,060 (year 2026), Design Load: HS 20+Mod, Features Intersected: RTE 11 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 5.812, Lanes on structure: 2, Lanes under structure: 4, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 10.9m (35.8ft), Skew: 4 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 26.2m (86.0ft), Curb or Sidewalk Widths: Left: 0.4m (1.3ft), Right: 0.4m (1.3ft), Curb-To-Curb Width: 8.5m (27.9ft), Out-to-Out Width: 10.1m (33.1ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Good, Operating Rating: 86.2 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 51.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 5.88m (19.29ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2007, Bridge Improvement Cost: $506,000, Roadway Improvement Cost: $289,000, Total Project Cost: $795,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 1008232, Location: 0.2 MI NW JCT RTS 11 + 12 (Lat: 42.164750, Lng: -75.895928), Route carried "on" structure: Interstate 81, Year Built: 1966, Status: Open, Structure Length: 5.57m (18.27ft), Average Daily Traffic: 12,573 (year 2006), Truck Traffic: 23%, Average Future Daily Traffic: 20,060 (year 2026), Design Load: HS 20+Mod, Features Intersected: RTE 11 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 5.813, Lanes on structure: 2, Lanes under structure: 4, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 10.9m (35.8ft), Skew: 4 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 26.5m (86.9ft), Curb-To-Curb Width: 9.2m (30.2ft), Out-to-Out Width: 10.1m (33.1ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 86.2 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 51.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 5.57m (18.27ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2007, Bridge Improvement Cost: $1,215,000, Roadway Improvement Cost: $723,000, Total Project Cost: $1,938,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 100824, Location: 0.6MI N JCT RTS 11 & 12 (Lat: 42.168850, Lng: -75.899481), Route carried "on" structure: US 11, Year Built: 1990, Status: Open, Structure Length: 2.19m (7.19ft), Average Daily Traffic: 1,536 (year 2006), Truck Traffic: 4%, Average Future Daily Traffic: 1,536 (year 2026), Design Load: HS 20, Features Intersected: CASTLE CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 7.519, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 12.8m (42.0ft), Skew: 1 degrees, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Number Of Spans In Main Unit: 1, Length of Maximum Span: 20.7m (67.9ft), Curb-To-Curb Width: 12.8m (42.0ft), Out-to-Out Width: 13.5m (44.3ft) Condition: Deck: Satisfactory, Superstructure: Very good, Substructure: Good, Channel: Good, Operating Rating: 80.7 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 36.3 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Better than present minimum criteria, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.19m (7.19ft), Designated Inspection Frequency: Every 24 months, Inspection Date: May 2006, Bridge Improvement Cost: $1,215,000, Roadway Improvement Cost: $723,000, Total Project Cost: $1,938,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 100825, Location: 1.5 MI N JCT US 11 & SH 1 (Lat: 42.180186, Lng: -75.910139), Route carried "on" structure: US 11, Year Built: 1974, Status: Open, Structure Length: 0.88m (2.89ft), Average Daily Traffic: 1,611 (year 2006), Truck Traffic: 8%, Average Future Daily Traffic: 1,937 (year 2026), Design Load: HS 20, Features Intersected: GLEN CASTLE CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 20.109, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 9.7m (31.8ft), Skew: 1 degrees, Material/Design: Concrete continuous, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 3.9m (12.8ft), Curb-To-Curb Width: 10.3m (33.8ft), Out-to-Out Width: 11.0m (36.1ft) Condition: Channel: Satisfactory, Culverts: Satisfactory, Operating Rating: 75.1 metric tons, Inventory Rating: 29.3 metric tons, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 0.88m (2.89ft), Designated Inspection Frequency: Every 24 months, Inspection Date: May 2006, Bridge Improvement Cost: $211,000, Roadway Improvement Cost: $126,000, Total Project Cost: $337,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 100826, Location: 1 MI S EXIT 7 OF I81 (Lat: 42.218897, Lng: -75.914383), Route carried "on" structure: US 11, Year Built: 1960, Status: Open, Structure Length: 1.03m (3.38ft), Average Daily Traffic: 1,509 (year 2007), Truck Traffic: 8%, Average Future Daily Traffic: 1,815 (year 2027), Design Load: HS 20+Mod, Features Intersected: BROOKS CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 12.111, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 12.1m (39.7ft), Skew: 2 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 10.3m (33.8ft), Curb or Sidewalk Widths: Left: 0.5m (1.6ft), Right: 0.5m (1.6ft), Curb-To-Curb Width: 11.5m (37.7ft), Out-to-Out Width: 13.2m (43.3ft) Condition: Deck: Satisfactory, Superstructure: Very good, Substructure: Very good, Channel: Good, Operating Rating: 87.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 51.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Equal to present minimum criteria, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.03m (3.38ft), Designated Inspection Frequency: Every 24 months, Inspection Date: May 2006, Bridge Improvement Cost: $211,000, Roadway Improvement Cost: $126,000, Total Project Cost: $337,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 100827, Location: .4 MI S EXIT 7 I81 ON US (Lat: 42.228208, Lng: -75.918489), Route carried "on" structure: US 11, Year Built: 1974, Status: Open, Structure Length: 0.85m (2.79ft), Average Daily Traffic: 1,509 (year 2007), Truck Traffic: 8%, Average Future Daily Traffic: 1,815 (year 2027), Design Load: HS 20, Features Intersected: POTATO CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 13.464, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 10.3m (33.8ft), Skew: 4 degrees, Material/Design: Concrete continuous, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 3.9m (12.8ft), Curb or Sidewalk Widths: Left: 1.4m (4.6ft), Right: 0.1m (0.3ft), Curb-To-Curb Width: 10.2m (33.5ft), Out-to-Out Width: 12.4m (40.7ft) Condition: Channel: Good, Culverts: Satisfactory, Operating Rating: 75.1 metric tons, Inventory Rating: 29.3 metric tons, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 0.85m (2.79ft), Designated Inspection Frequency: Every 24 months, Inspection Date: May 2006, Bridge Improvement Cost: $230,000, Roadway Improvement Cost: $137,000, Total Project Cost: $367,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 100828, Location: .1 MI S EXIT 7 OF I-81 (Lat: 42.232333, Lng: -75.916358), Route carried "on" structure: US 11, Year Built: 1965, Status: Open, Structure Length: 1.25m (4.10ft), Average Daily Traffic: 1,509 (year 2007), Truck Traffic: 8%, Average Future Daily Traffic: 1,815 (year 2027), Features Intersected: CASTLE CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 13.783, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 13.4m (44.0ft), Skew: 3 degrees, Material/Design: Concrete continuous, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 5.7m (18.7ft), Curb or Sidewalk Widths: Left: 0.1m (0.3ft), Right: 0.1m (0.3ft), Curb-To-Curb Width: 13.3m (43.6ft), Out-to-Out Width: 14.2m (46.6ft) Condition: Channel: Satisfactory, Culverts: Satisfactory, Operating Rating: 76.7 metric tons, Inventory Rating: 32.6 metric tons, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Better than present minimum criteria, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.25m (4.10ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2006, Bridge Improvement Cost: $385,000, Roadway Improvement Cost: $229,000, Total Project Cost: $614,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 1008291, Location: EXIT 7 I-81 INT (Lat: 42.233119, Lng: -75.915375), Route carried "on" structure: Interstate 81, Year Built: 1967, Status: Open, Structure Length: 5.02m (16.47ft), Average Daily Traffic: 25,892 (year 2007), Truck Traffic: 24%, Average Future Daily Traffic: 42,111 (year 2027), Design Load: HS 20+Mod, Features Intersected: RTE 11 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 14.071, Lanes on structure: 2, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 10.9m (35.8ft), Skew: 3 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 18.2m (59.7ft), Curb-To-Curb Width: 8.5m (27.9ft), Out-to-Out Width: 10.1m (33.1ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Fair, Operating Rating: 78.0 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 46.3 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 5.02m (16.47ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2007, Bridge Improvement Cost: $1,096,000, Roadway Improvement Cost: $652,000, Total Project Cost: $1,748,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 1008292, Location: EXIT 7 I-81 INT (Lat: 42.233539, Lng: -75.914800), Route carried "on" structure: Interstate 81, Year Built: 1967, Status: Open, Structure Length: 4.85m (15.91ft), Average Daily Traffic: 25,892 (year 2007), Truck Traffic: 24%, Average Future Daily Traffic: 42,111 (year 2027), Design Load: HS 20+Mod, Features Intersected: RTE 11 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 14.071, Lanes on structure: 2, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 10.9m (35.8ft), Skew: 3 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 18.2m (59.7ft), Curb-To-Curb Width: 8.5m (27.9ft), Out-to-Out Width: 10.1m (33.1ft) Condition: Deck: Good, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 78.0 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 46.3 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 4.85m (15.91ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2007, Bridge Improvement Cost: $1,056,000, Roadway Improvement Cost: $628,000, Total Project Cost: $1,684,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 100921, Location: 2 MI NE JCT SH 12 & SH 12 (Lat: 42.193433, Lng: -75.876311), Route carried "on" structure: State highway 12, Year Built: 1928, Status: Open, Structure Length: 0.91m (2.99ft), Average Daily Traffic: 10,810 (year 2006), Truck Traffic: 5%, Average Future Daily Traffic: 14,104 (year 2026), Design Load: H 20, Features Intersected: GILBERT CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 5.305, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 10.3m (33.8ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 9.1m (29.9ft), Curb-To-Curb Width: 9.8m (32.2ft), Out-to-Out Width: 10.4m (34.1ft) Condition: Deck: Fair, Superstructure: Fair, Substructure: Satisfactory, Channel: Good, Operating Rating: 81.6 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 41.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Meets minimum limits, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 0.91m (2.99ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2006, Bridge Improvement Cost: $206,000, Roadway Improvement Cost: $122,000, Total Project Cost: $328,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 100981, Location: .3 MI E JCT SH 12 & SH 12 (Lat: 42.168903, Lng: -75.881822), Route carried "on" structure: Alternate State highway 12A, Year Built: 2003, Status: Open, Structure Length: 2.37m (7.78ft), Average Daily Traffic: 13,210 (year 2006), Truck Traffic: 6%, Average Future Daily Traffic: 16,487 (year 2026), Design Load: HS 25, Features Intersected: THOMAS CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 1.204, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 12.5m (41.0ft), Skew: 3 degrees, Material/Design: Concrete, Design/Construction: Box Beam or Girders - Multiple, Number Of Spans In Main Unit: 1, Length of Maximum Span: 22.6m (74.1ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 1.8m (5.9ft), Curb-To-Curb Width: 12.5m (41.0ft), Out-to-Out Width: 15.3m (50.2ft) Condition: Deck: Very good, Superstructure: Excellent, Substructure: Very good, Channel: Very good, Operating Rating: 77.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 45.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.37m (7.78ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2006, Bridge Improvement Cost: $3,575,000, Roadway Improvement Cost: $2,074,000, Total Project Cost: $5,649,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 100983, Location: JCT.RTE 12A & CHENANGO R. (Lat: 42.165650, Lng: -75.873014), Route carried "on" structure: State highway 12A, Year Built: 1988, Status: Open, Structure Length: 15.30m (50.20ft), Average Daily Traffic: 15,758 (year 1998), Truck Traffic: 6%, Average Future Daily Traffic: 19,668 (year 2018), Design Load: HS 20, Features Intersected: CHENANGO RIVER Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 162.477, Lanes on structure: 4, Owner: State Highway Agency, Approaching Roadway Width: 17.6m (57.7ft), Skew: 9 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 58.8m (192.9ft), Curb or Sidewalk Widths: Left: 2.1m (6.9ft), Right: 0.0m, Curb-To-Curb Width: 17.6m (57.7ft), Out-to-Out Width: 20.7m (67.9ft) Condition: Deck: Very good, Superstructure: Very good, Substructure: Fair, Channel: Good, Operating Rating: 94.3 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 56.2 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 15.30m (50.20ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2007, Bridge Improvement Cost: $3,575,000, Roadway Improvement Cost: $2,074,000, Total Project Cost: $5,649,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 1031201, Location: 3.0 MI N OF N BING CTY LI (Lat: 42.159414, Lng: -75.897467), Route carried "on" structure: Interstate 81, Year Built: 1966, Status: Open, Structure Length: 3.77m (12.37ft), Average Daily Traffic: 10,989 (year 2005), Truck Traffic: 23%, Average Future Daily Traffic: 17,533 (year 2025), Design Load: HS 20+Mod, Features Intersected: RAMP FB Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 5.292, Lanes on structure: 2, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 10.6m (34.8ft), Skew: 1 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 12.4m (40.7ft), Curb-To-Curb Width: 9.2m (30.2ft), Out-to-Out Width: 10.1m (33.1ft) Condition: Deck: Good, Superstructure: Good, Substructure: Satisfactory, Operating Rating: 98.0 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 59.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 3.77m (12.37ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2007, Bridge Improvement Cost: $964,000, Roadway Improvement Cost: $574,000, Total Project Cost: $1,538,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete Find on map >>
Structure Number: 1031202, Location: 3.0 MI N OF N BING CTY LI (Lat: 42.159453, Lng: -75.897156), Route carried "on" structure: Interstate 81, Year Built: 1966, Status: Open, Structure Length: 3.77m (12.37ft), Average Daily Traffic: 10,989 (year 2005), Truck Traffic: 23%, Average Future Daily Traffic: 17,533 (year 2025), Design Load: HS 20+Mod, Features Intersected: RAMP FB Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 5.292, Lanes on structure: 2, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 9.7m (31.8ft), Skew: 1 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 12.4m (40.7ft), Curb-To-Curb Width: 9.2m (30.2ft), Out-to-Out Width: 10.1m (33.1ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Inventory Rating: 59.9 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 3.77m (12.37ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2007, Bridge Improvement Cost: $964,000, Roadway Improvement Cost: $574,000, Total Project Cost: $1,538,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete Find on map >>
Structure Number: 1031211, Location: 3.1 MI N OF N BING CTY LI (Lat: 42.162253, Lng: -75.896786), Route carried "on" structure: Interstate 81, Year Built: 1966, Status: Open, Structure Length: 4.26m (13.98ft), Average Daily Traffic: 12,573 (year 2006), Truck Traffic: 23%, Average Future Daily Traffic: 20,060 (year 2026), Features Intersected: FULLER ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 5.820, Lanes on structure: 2, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 10.9m (35.8ft), Skew: 2 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 15.2m (49.9ft), Curb-To-Curb Width: 9.2m (30.2ft), Out-to-Out Width: 10.1m (33.1ft) Condition: Deck: Good, Superstructure: Satisfactory, Substructure: Good, Operating Rating: 78.9 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 47.2 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 4.26m (13.98ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2007, Bridge Improvement Cost: $964,000, Roadway Improvement Cost: $574,000, Total Project Cost: $1,538,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 1031212, Location: 3.1 MI N OF N BING CTY LI (Lat: 42.162100, Lng: -75.896528), Route carried "on" structure: Interstate 81, Year Built: 1966, Status: Open, Structure Length: 4.41m (14.47ft), Average Daily Traffic: 12,573 (year 2006), Truck Traffic: 23%, Average Future Daily Traffic: 20,060 (year 2026), Design Load: HS 20+Mod, Features Intersected: FULLER ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 5.820, Lanes on structure: 2, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 10.9m (35.8ft), Skew: 2 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 15.2m (49.9ft), Curb-To-Curb Width: 9.2m (30.2ft), Out-to-Out Width: 10.1m (33.1ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Good, Operating Rating: 92.5 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 55.3 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 4.41m (14.47ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2007, Bridge Improvement Cost: $964,000, Roadway Improvement Cost: $574,000, Total Project Cost: $1,538,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 1031221, Location: 3.2 MI N OF N BING CTY LI (Lat: 42.163750, Lng: -75.896436), Route carried "on" structure: Interstate 81, Year Built: 1966, Status: Open, Structure Length: 5.05m (16.57ft), Average Daily Traffic: 12,573 (year 2006), Truck Traffic: 23%, Average Future Daily Traffic: 20,060 (year 2026), Design Load: HS 20+Mod, Features Intersected: CASTLE CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 5.817, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 9.1m (29.9ft), Skew: 4 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 27.7m (90.9ft), Curb-To-Curb Width: 9.2m (30.2ft), Out-to-Out Width: 10.1m (33.1ft) Condition: Deck: Good, Superstructure: Satisfactory, Substructure: Good, Channel: Good, Operating Rating: 91.6 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 54.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 5.05m (16.57ft), Designated Inspection Frequency: Every 24 months, Inspection Date: May 2007, Bridge Improvement Cost: $964,000, Roadway Improvement Cost: $574,000, Total Project Cost: $1,538,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete Find on map >>
Structure Number: 1031222, Location: 3.2 MI N OF N BING CTY LI (Lat: 42.163572, Lng: -75.896203), Route carried "on" structure: Interstate 81, Year Built: 1966, Status: Open, Structure Length: 4.93m (16.17ft), Average Daily Traffic: 12,573 (year 2006), Truck Traffic: 23%, Average Future Daily Traffic: 20,060 (year 2026), Design Load: HS 20+Mod, Features Intersected: CASTLE CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 5.817, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 9.1m (29.9ft), Skew: 4 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 27.7m (90.9ft), Curb-To-Curb Width: 9.2m (30.2ft), Out-to-Out Width: 10.1m (33.1ft) Condition: Deck: Good, Superstructure: Satisfactory, Substructure: Very good, Channel: Satisfactory, Operating Rating: 96.2 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 57.2 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 4.93m (16.17ft), Designated Inspection Frequency: Every 24 months, Inspection Date: May 2007, Bridge Improvement Cost: $964,000, Roadway Improvement Cost: $574,000, Total Project Cost: $1,538,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete Find on map >>
Structure Number: 104682, Location: 0.5 MI NE JCT RTS 369 & 7 (Lat: 42.168500, Lng: -75.831825), Route carried "on" structure: State highway 369, Year Built: 1991, Status: Open, Structure Length: 3.50m (11.48ft), Average Daily Traffic: 1,272 (year 2005), Truck Traffic: 6%, Average Future Daily Traffic: 1,588 (year 2025), Design Load: HS 20, Features Intersected: BALLYHACK CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.465, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 12.1m (39.7ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 34.4m (112.9ft), Curb-To-Curb Width: 12.1m (39.7ft), Out-to-Out Width: 13.0m (42.7ft) Condition: Deck: Very good, Superstructure: Very good, Substructure: Very good, Channel: Very good, Operating Rating: 70.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Equal to present minimum criteria, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 3.50m (11.48ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2007, Bridge Improvement Cost: $1,285,000, Roadway Improvement Cost: $764,000, Total Project Cost: $2,049,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 1073961, Location: JCT I81/I88 -CHENANGO RVR (Lat: 42.142067, Lng: -75.901056), Route carried "on" structure: Interstate 88, Year Built: 1989, Status: Open, Structure Length: 80.83m (265.19ft), Average Daily Traffic: 8,900 (year 2005), Truck Traffic: 23%, Average Future Daily Traffic: 14,200 (year 2025), Design Load: HS 20, Features Intersected: RTE I81, CHENANGO RIVER, Minimum Vertical Clearance: 6.40m (21.00ft), Kilometerpoint: 0.545, Lanes on structure: 2, Lanes under structure: 7, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 11.5m (37.7ft), Skew: 9 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 17, Length of Maximum Span: 54.8m (179.8ft), Curb-To-Curb Width: 11.4m (37.4ft), Out-to-Out Width: 12.3m (40.4ft) Condition: Deck: Good, Superstructure: Excellent, Substructure: Fair, Channel: Good, Operating Rating: 63.5 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Somewhat better than minimum adequacy, Underclear: Meets minimum limits, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 80.83m (265.19ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2007, Bridge Improvement Cost: $224,000, Roadway Improvement Cost: $133,000, Total Project Cost: $357,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 1073962, Location: JCT I81&I88 -CHENANGO RVR (Lat: 42.142828, Lng: -75.897558), Route carried "on" structure: Interstate 88, Year Built: 1989, Status: Open, Structure Length: 56.93m (186.78ft), Average Daily Traffic: 8,900 (year 2005), Truck Traffic: 23%, Average Future Daily Traffic: 14,200 (year 2025), Design Load: HS 20, Features Intersected: WEST SERVICE ROAD, CHENA Minimum Vertical Clearance: 6.29m (20.64ft), Kilometerpoint: 0.665, Lanes on structure: 2, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 11.5m (37.7ft), Skew: 4 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 12, Length of Maximum Span: 57.3m (188.0ft), Curb-To-Curb Width: 11.3m (37.1ft), Out-to-Out Width: 12.3m (40.4ft) Condition: Deck: Satisfactory, Superstructure: Excellent, Substructure: Good, Channel: Very good, Operating Rating: 81.6 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 49.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: High priority of corrective action, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 56.93m (186.78ft), Designated Inspection Frequency: Every 24 months, Inspection Date: December 2007, Bridge Improvement Cost: $5,991,000, Roadway Improvement Cost: $3,339,000, Total Project Cost: $9,330,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 107396A, Location: JCT I81 & I88-CHENANGO RV (Lat: 42.143128, Lng: -75.897453), Route carried "on" structure: Interstate 88, Year Built: 1989, Status: Open, Structure Length: 16.58m (54.40ft), Average Daily Traffic: 19,461 (year 1989), Truck Traffic: 23%, Average Future Daily Traffic: 31,050 (year 2009), Design Load: HS 20, Features Intersected: CHENANGO RIVER Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 1, Owner: State Highway Agency, Approaching Roadway Width: 8.8m (28.9ft), Skew: 9 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 46.0m (150.9ft), Curb-To-Curb Width: 8.6m (28.2ft), Out-to-Out Width: 9.6m (31.5ft) Condition: Deck: Very good, Superstructure: Very good, Substructure: Satisfactory, Channel: Good, Operating Rating: 63.5 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Meets minimum limits, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 16.58m (54.40ft), Designated Inspection Frequency: Every 24 months, Inspection Date: December 2007, Bridge Improvement Cost: $5,991,000, Roadway Improvement Cost: $3,339,000, Total Project Cost: $9,330,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 222536, Location: HAMLET OF CASTLE CREEK (Lat: 42.227747, Lng: -75.917753), Route carried "on" structure: City street , Year Built: 1935, Year Reconstructed: 1975, Status: Open, Structure Length: 0.79m (2.59ft), Average Daily Traffic: 24 (year 2006), Truck Traffic: 5%, Average Future Daily Traffic: 31 (year 2026), Features Intersected: POTATO CREEK, Facility Carried by Structure: WATER STREET Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Town or Township Highway Agency, Approaching Roadway Width: 5.1m (16.7ft), Skew: 4 degrees, Material/Design: Wood or Timber, Number Of Spans In Main Unit: 1, Length of Maximum Span: 7.3m (24.0ft), Curb-To-Curb Width: 7.1m (23.3ft), Out-to-Out Width: 7.6m (24.9ft) Condition: Deck: Excellent, Superstructure: Excellent, Substructure: Good, Channel: Satisfactory, Inventory Rating: 98.9 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Somewhat better than minimum adequacy, Length Of Structure Improvement: 0.79m (2.59ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2007, Bridge Improvement Cost: $280,000, Roadway Improvement Cost: $167,000, Total Project Cost: $447,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 225759, Location: 1.5 MI W OF CASTLE CREEK (Lat: 42.224069, Lng: -75.939186), Route carried "on" structure: Other road , Year Built: 1977, Status: Open, Structure Length: 0.76m (2.49ft), Average Daily Traffic: 99 (year 1995), Truck Traffic: 6%, Average Future Daily Traffic: 138 (year 2015), Features Intersected: BROOKS CREEK, Facility Carried by Structure: FOX ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Town or Township Highway Agency, Approaching Roadway Width: 6.0m (19.7ft), Material/Design: Steel, Design/Construction: Culvert, Number Of Spans In Main Unit: 3, Length of Maximum Span: 2.4m (7.9ft) Condition: Channel: Serious, Culverts: Fair, Operating Rating: 73.7 metric tons, Inventory Rating: 29.3 metric tons, Structural Evaluation: Somewhat better than minimum adequacy, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 0.76m (2.49ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2006, Bridge Improvement Cost: $130,000, Roadway Improvement Cost: $77,000, Total Project Cost: $207,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 334914, Location: 2.0 MI NE CHENANGO BRIDGE (Lat: 42.197158, Lng: -75.859353), Route carried "on" structure: County highway , Year Built: 1956, Year Reconstructed: 1983, Status: Open, Structure Length: 1.31m (4.30ft), Average Daily Traffic: 2,044 (year 2001), Truck Traffic: 4%, Average Future Daily Traffic: 2,044 (year 2021), Design Load: HS 20, Features Intersected: KATTEL CREEK, Facility Carried by Structure: CR153 KATTELVILLE Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 12.1m (39.7ft), Skew: 6 degrees, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 11.8m (38.7ft), Curb or Sidewalk Widths: Left: 1.6m (5.2ft), Right: 1.6m (5.2ft), Curb-To-Curb Width: 8.0m (26.2ft), Out-to-Out Width: 11.8m (38.7ft) Condition: Deck: Good, Superstructure: Fair, Substructure: Fair, Channel: Very good, Operating Rating: 80.2 metric tons, Inventory Rating: 29.3 metric tons, Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of corrective action, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.31m (4.30ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2006, Bridge Improvement Cost: $562,000, Roadway Improvement Cost: $334,000, Total Project Cost: $896,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 334915, Location: 2.0 MI SW OF CASTLE CREEK (Lat: 42.221683, Lng: -75.933603), Route carried "on" structure: County highway , Year Built: 1978, Status: Open, Structure Length: 1.15m (3.77ft), Average Daily Traffic: 605 (year 1997), Truck Traffic: 6%, Average Future Daily Traffic: 844 (year 2017), Features Intersected: BROOKS CREEK, Facility Carried by Structure: CR105 BROOKS RD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 1, Owner: County Highway Agency, Approaching Roadway Width: 12.1m (39.7ft), Skew: 4 degrees, Material/Design: Steel, Design/Construction: Arch - Deck, Number Of Spans In Main Unit: 1, Length of Maximum Span: 10.3m (33.8ft) Condition: Superstructure: Satisfactory, Substructure: Satisfactory, Channel: Fair, Operating Rating: 79.9 metric tons, Inventory Rating: 32.6 metric tons, Structural Evaluation: Equal to present minimum criteria, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.15m (3.77ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2006, Bridge Improvement Cost: $562,000, Roadway Improvement Cost: $334,000, Total Project Cost: $896,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 335002, Location: 1.3 MI E OF KATTELVILLE (Lat: 42.197447, Lng: -75.838086), Route carried "on" structure: County highway , Year Built: 1975, Status: Open, Structure Length: 3.29m (10.79ft), Average Daily Traffic: 803 (year 2007), Truck Traffic: 4%, Average Future Daily Traffic: 803 (year 2027), Design Load: HS 20, Features Intersected: NY SUSQUEHANNA& W, Facility Carried by Structure: COUNTY ROAD 96 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 10.9m (35.8ft), Skew: 1 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 12.1m (39.7ft), Curb or Sidewalk Widths: Left: 0.1m (0.3ft), Right: 1.2m (3.9ft), Curb-To-Curb Width: 9.6m (31.5ft), Out-to-Out Width: 11.6m (38.1ft) Condition: Deck: Poor, Superstructure: Fair, Substructure: Fair, Operating Rating: 97.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 58.1 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Equal to present minimum criteria, Underclear: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 3.29m (10.79ft), Designated Inspection Frequency: Every 24 months, Inspection Date: December 2006, Bridge Improvement Cost: $827,000, Roadway Improvement Cost: $492,000, Total Project Cost: $1,319,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 1008201, Location: 2.5 MI N OF N BING CTY LI (Lat: 42.152997, Lng: -75.897475), Route carried "under" structure: US 11, Year Built: 1966, Structure Length: 6.09m (19.98ft), Average Daily Traffic: 23,297 (year 2005), Truck Traffic: 5%, Features Intersected: RTE 11, Facility Carried by Structure: RTE I81 Minimum Vertical Clearance: 4.52m (14.83ft), Kilometerpoint: 4.119, Lanes on structure: 3, Lanes under structure: 3, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 27.4m (89.9ft) Find on map >>
Structure Number: 1008202, Location: 2.5 MI N OF N BING CTY LI (Lat: 42.153350, Lng: -75.897314), Route carried "under" structure: US 11, Year Built: 1966, Structure Length: 6.37m (20.90ft), Average Daily Traffic: 23,297 (year 2005), Truck Traffic: 5%, Features Intersected: RTE 11, Facility Carried by Structure: RTE I81 Minimum Vertical Clearance: 4.75m (15.58ft), Kilometerpoint: 4.167, Lanes on structure: 2, Lanes under structure: 3, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 29.2m (95.8ft) Find on map >>
Structure Number: 1008231, Location: 0.2 MI NW JCT RTS 11 + 12 (Lat: 42.164992, Lng: -75.896156), Route carried "under" structure: US 11, Year Built: 1966, Structure Length: 5.88m (19.29ft), Average Daily Traffic: 5,052 (year 2006), Truck Traffic: 6%, Features Intersected: RTE 11, Facility Carried by Structure: RTE I81 Minimum Vertical Clearance: 5.25m (17.22ft), Kilometerpoint: 5.583, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 26.2m (86.0ft) Find on map >>
Structure Number: 1008232, Location: 0.2 MI NW JCT RTS 11 + 12 (Lat: 42.164750, Lng: -75.895928), Route carried "under" structure: US 11, Year Built: 1966, Structure Length: 5.57m (18.27ft), Average Daily Traffic: 5,052 (year 2006), Truck Traffic: 6%, Features Intersected: RTE 11, Facility Carried by Structure: RTE I81 Minimum Vertical Clearance: 4.77m (15.65ft), Kilometerpoint: 5.551, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 26.5m (86.9ft) Find on map >>
Structure Number: 1008291, Location: EXIT 7 I-81 INT (Lat: 42.233119, Lng: -75.915375), Route carried "under" structure: US 11, Year Built: 1967, Structure Length: 5.02m (16.47ft), Average Daily Traffic: 1,611 (year 2006), Truck Traffic: 8%, Features Intersected: RTE 11, Facility Carried by Structure: RTE I81 Minimum Vertical Clearance: 4.62m (15.16ft), Kilometerpoint: 13.805, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 18.2m (59.7ft) Find on map >>
Structure Number: 1008292, Location: EXIT 7 I-81 INT (Lat: 42.233539, Lng: -75.914800), Route carried "under" structure: US 11, Year Built: 1967, Structure Length: 4.85m (15.91ft), Average Daily Traffic: 1,611 (year 2006), Truck Traffic: 8%, Features Intersected: RTE 11, Facility Carried by Structure: RTE I81 Minimum Vertical Clearance: 4.54m (14.90ft), Kilometerpoint: 1.387, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 18.2m (59.7ft) Find on map >>
Structure Number: 1031201, Location: 3.0 MI N OF N BING CTY LI (Lat: 42.159414, Lng: -75.897467), Route carried "under" structure: Ramp Other road , Year Built: 1966, Structure Length: 3.77m (12.37ft), Average Daily Traffic: 8,100 (year 1977), Truck Traffic: 5%, Features Intersected: RAMP FB, Facility Carried by Structure: RTE I81 Minimum Vertical Clearance: 4.69m (15.39ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 12.4m (40.7ft) Find on map >>
Structure Number: 1031202, Location: 3.0 MI N OF N BING CTY LI (Lat: 42.159453, Lng: -75.897156), Route carried "under" structure: Ramp Other road , Year Built: 1966, Structure Length: 3.77m (12.37ft), Average Daily Traffic: 8,100 (year 1977), Truck Traffic: 5%, Features Intersected: RAMP FB, Facility Carried by Structure: RTE I81 Minimum Vertical Clearance: 0.48m (1.57ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 12.4m (40.7ft) Find on map >>
Structure Number: 1073961, Location: JCT I81/I88 -CHENANGO RVR (Lat: 42.142067, Lng: -75.901056), Route carried "under" structure: Interstate 81, Year Built: 1989, Structure Length: 80.83m (265.19ft), Average Daily Traffic: 29,742 (year 1989), Truck Traffic: 23%, Features Intersected: RTE I81, CHENANGO RIVER,, Facility Carried by Structure: RTE I88 Minimum Vertical Clearance: 5.79m (19.00ft), Kilometerpoint: 2.944, Lanes on structure: 2, Lanes under structure: 6, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 54.8m (179.8ft) Find on map >>
Structure Number: 1073961, Location: JCT I81/I88 -CHENANGO RVR (Lat: 42.142067, Lng: -75.901056), Route carried "under" structure: Ramp Other road , Year Built: 1989, Structure Length: 80.83m (265.19ft), Average Daily Traffic: 5,000 (year 2007), Truck Traffic: 5%, Features Intersected: RTE I81, CHENANGO RIVER,, Facility Carried by Structure: RTE I88 Minimum Vertical Clearance: 4.88m (16.01ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 1, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 54.8m (179.8ft) Find on map >>
Structure Number: 1073962, Location: JCT I81&I88 -CHENANGO RVR (Lat: 42.142828, Lng: -75.897558), Route carried "under" structure: Ramp Other road , Year Built: 1989, Structure Length: 56.93m (186.78ft), Average Daily Traffic: 5,000 (year 2007), Truck Traffic: 5%, Features Intersected: WEST SERVICE ROAD, CHENA, Facility Carried by Structure: RTE I88 Minimum Vertical Clearance: 6.27m (20.57ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 57.3m (188.0ft) Find on map >>
Structure Number: 700982, Location: 0.6 MI E JCT RTS 12A + 12 (Lat: 42.168308, Lng: -75.875386), Route carried "under" structure: State highway 12A, Year Built: 1941, Structure Length: 1.49m (4.89ft), Average Daily Traffic: 13,210 (year 2006), Truck Traffic: 6%, Features Intersected: RTE 12A, Facility Carried by Structure: NY SUSQUEHANNA &W Minimum Vertical Clearance: 5.38m (17.65ft), Kilometerpoint: 1.046, Lanes under structure: 2, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 13.4m (44.0ft) Discuss this city on our hugely popular New York forum Back to: Chenango, NY, New York, All US cities.
|
![]() |