Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Church Hill, Pennsylvania (PA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 12Number of bridges
  • 131ft / 39.9mTotal length
  • $529,000Total costs
  • 62,235Total average daily traffic
  • 12,128Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Church Hill
  • No street view available for this location

New bridges in Church Hill, PA - historical statistics
  • New bridges - historical statistics
  • 11930-1939
  • 111990-1999
Average Bridge Daily Traffic in Church Hill, PA
Average Bridge Truck Traffic in Church Hill, PA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 83.3%Good
  • 16.7%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 16.7%Very good
  • 66.7%Good
  • 16.7%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 33.3%Very good
  • 50.0%Good
  • 16.7%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 66.7%Good
  • 33.3%Satisfactory
Find on map >>   Show street view

Structure Number: 26504,  Location: REEDSVILLE (Lat: 40.674067,  Lng: -77.600367),  Route carried "on" structure: State highway ,  Year Built: 1930,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 6,266 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 8,771 (year 2040),  Design Load: H 15,  Features Intersected: TEA CREEK,  Facility Carried by Structure: SR 1005
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.486,  Lanes on structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.7m (35.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.10m (3.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $39,000,  Roadway Improvement Cost: $250,000,  Total Project Cost: $529,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 40307,  Location: 1 MI N REEDSVILLE (Lat: 40.681853,  Lng: -77.607969),  Route carried "on" structure: US 322,  Year Built: 1998,  Status: Open,  Structure Length: 13.38m (43.90ft),  Average Daily Traffic: 7,724 (year 2021),  Truck Traffic: 24%,  Average Future Daily Traffic: 8,139 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: SR 4001 AND TEA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.259,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 37.5m (123.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Inventory Rating: 51.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 14.30m (46.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 40308,  Location: 1 MI N REEDSVILLE (Lat: 40.681742,  Lng: -77.607714),  Route carried "on" structure: US 322,  Year Built: 1998,  Status: Open,  Structure Length: 13.38m (43.90ft),  Average Daily Traffic: 7,899 (year 2021),  Truck Traffic: 23%,  Average Future Daily Traffic: 8,524 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: SR 4001 AND TEA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.249,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 37.5m (123.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Good,  Inventory Rating: 51.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 14.30m (46.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 40319,  Location: 2.5 MI N REEDSVILLE (Lat: 40.701947,  Lng: -77.597494),  Route carried "on" structure: State highway ,  Year Built: 1998,  Status: Open,  Structure Length: 6.37m (20.90ft),  Average Daily Traffic: 7,260 (year 2021),  Truck Traffic: 11%,  Average Future Daily Traffic: 8,330 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: US SR 322,  Facility Carried by Structure: SR 1006
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 10,  Owner: State Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Skew: 30 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 32.9m (107.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 17.8m (58.4ft),  Out-to-Out Width: 19.4m (63.6ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Inventory Rating: 65.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.30m (23.95ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 40637,  Location: 2 MI NW OF MILROY (Lat: 40.710625,  Lng: -77.598906),  Route carried "on" structure: US 322,  Year Built: 1999,  Status: Open,  Structure Length: 2.83m (9.28ft),  Average Daily Traffic: 7,724 (year 2021),  Truck Traffic: 24%,  Average Future Daily Traffic: 8,139 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: SR 4006
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.892,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.1m (88.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.3m (43.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 98.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.60m (11.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 40641,  Location: NORTH MILROY (Lat: 40.710592,  Lng: -77.598667),  Route carried "on" structure: US 322,  Year Built: 1999,  Status: Open,  Structure Length: 2.83m (9.28ft),  Average Daily Traffic: 7,899 (year 2021),  Truck Traffic: 23%,  Average Future Daily Traffic: 8,524 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: SR 4006
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.886,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.1m (88.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.3m (43.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 98.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.60m (11.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 40307,  Location: 1 MI N REEDSVILLE (Lat: 40.681853,  Lng: -77.607969),  Route carried "under" structure: State highway ,  Year Built: 1998,  Structure Length: 0. m,  Average Daily Traffic: 502 (year 2022),  Truck Traffic: 7%,  Features Intersected: SR 4001 AND TEA CREEK,  Facility Carried by Structure: SR 322-US 322
Minimum Vertical Clearance: 5.34m (17.52ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 37.5m (123.0ft)

Find on map >>   Show street view

Structure Number: 40308,  Location: 1 MI N REEDSVILLE (Lat: 40.681742,  Lng: -77.607714),  Route carried "under" structure: State highway ,  Year Built: 1998,  Structure Length: 0. m,  Average Daily Traffic: 502 (year 2022),  Truck Traffic: 7%,  Features Intersected: SR 4001 AND TEA CREEK,  Facility Carried by Structure: SR 322-US 322
Minimum Vertical Clearance: 5.88m (19.29ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 37.5m (123.0ft)

Find on map >>   Show street view

Structure Number: 40319,  Location: 2.5 MI N REEDSVILLE (Lat: 40.701947,  Lng: -77.597494),  Route carried "under" structure: US 322,  Year Built: 1998,  Structure Length: 0. m,  Average Daily Traffic: 7,724 (year 2021),  Truck Traffic: 24%,  Features Intersected: US SR 322,  Facility Carried by Structure: SR 1006
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 8.877,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.9m (107.9ft)

Find on map >>   Show street view

Structure Number: 40319,  Location: 2.5 MI N REEDSVILLE (Lat: 40.701947,  Lng: -77.597494),  Route carried "under" structure: US 322,  Year Built: 1998,  Structure Length: 0. m,  Average Daily Traffic: 7,899 (year 2021),  Truck Traffic: 23%,  Features Intersected: US SR 322,  Facility Carried by Structure: SR 1006
Minimum Vertical Clearance: 5.14m (16.86ft),  Kilometerpoint: 8.869,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.9m (107.9ft)

Find on map >>   Show street view

Structure Number: 40637,  Location: 2 MI NW OF MILROY (Lat: 40.710625,  Lng: -77.598906),  Route carried "under" structure: State highway ,  Year Built: 1999,  Structure Length: 0. m,  Average Daily Traffic: 418 (year 2021),  Truck Traffic: 8%,  Features Intersected: SR 4006,  Facility Carried by Structure: SR 322-US 322 E.B.
Minimum Vertical Clearance: 4.95m (16.24ft),  Kilometerpoint: 16.943,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 27.1m (88.9ft)

Find on map >>   Show street view

Structure Number: 40641,  Location: NORTH MILROY (Lat: 40.710592,  Lng: -77.598667),  Route carried "under" structure: State highway ,  Year Built: 1999,  Structure Length: 0. m,  Average Daily Traffic: 418 (year 2021),  Truck Traffic: 8%,  Features Intersected: SR 4006,  Facility Carried by Structure: SR 322-US 322 W.B.
Minimum Vertical Clearance: 5.47m (17.95ft),  Kilometerpoint: 16.943,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 27.1m (88.9ft)

Discuss Church Hill, Pennsylvania (PA) on our hugely popular Pennsylvania forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.