  • National Bridge Inventory (NBI) Statistics
  • 36Number of bridges
  • 558ft / 170mTotal length
  • $74,367,000Total costs
  • 180,375Total average daily traffic
  • 27,999Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Cortlandville
  • No street view available for this location

New bridges in Cortlandville, NY - historical statistics
  • New bridges - historical statistics
  • 21930-1939
  • 21940-1949
  • 11950-1959
  • 191960-1969
  • 11970-1979
  • 31990-1999
  • 62000-2009
  • 22010-2019
Reconstructed bridges in Cortlandville, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11990-1999
  • 12000-2009
  • 12010-2019
Average Bridge Daily Traffic in Cortlandville, NY
Average Bridge Truck Traffic in Cortlandville, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 9.5%Excellent
  • 4.8%Very good
  • 9.5%Good
  • 33.3%Satisfactory
  • 38.1%Fair
  • 4.8%Serious
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 8.7%Excellent
  • 13.0%Very good
  • 17.4%Good
  • 17.4%Satisfactory
  • 34.8%Fair
  • 4.3%Poor
  • 4.3%Serious
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 8.7%Excellent
  • 13.0%Very good
  • 26.1%Good
  • 26.1%Satisfactory
  • 21.7%Fair
  • 4.3%Critical
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 5.3%Excellent
  • 10.5%Very good
  • 21.1%Good
  • 15.8%Satisfactory
  • 36.8%Fair
  • 10.5%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 66.7%Good
  • 33.3%Satisfactory
Find on map >>   Show street view

Structure Number: 100835,  Location: 4.1 Mi N Jct Rt 11 & 90 (Lat: 42.545683,  Lng: -76.096431),  Route carried "on" structure: US 11,  Year Built: 2004,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 1,724 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 2,410 (year 2040),  Design Load: HS 20,  Features Intersected: Hoxie Gorge Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.007,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.2m (30.2ft),  Curb-To-Curb Width: 10.8m (35.4ft),  Out-to-Out Width: 11.8m (38.7ft)

Condition: Superstructure: Good,  Substructure: Very good,  Channel: Good,  Operating Rating: 70.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.94m (3.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $458,000,  Roadway Improvement Cost: $268,000,  Total Project Cost: $726,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 100836,  Location: 0.5 MI S JCT RTS 11 + 41 (Lat: 42.585928,  Lng: -76.129228),  Route carried "on" structure: US 11,  Year Built: 1956,  Status: Open,  Structure Length: 2.26m (7.41ft),  Average Daily Traffic: 1,724 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 2,133 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: TROUT BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.365,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 10.9m (35.8ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 80.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.25m (7.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $1,126,000,  Roadway Improvement Cost: $660,000,  Total Project Cost: $1,786,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 100837,  Location: JCT RTE 11+TIOUGHNIOGA R (Lat: 42.598400,  Lng: -76.158242),  Route carried "on" structure: US 11,  Year Built: 1933,  Year Reconstructed: 1995,  Status: Open,  Structure Length: 5.97m (19.59ft),  Average Daily Traffic: 8,195 (year 2018),  Truck Traffic: 8%,  Average Future Daily Traffic: 8,233 (year 2040),  Design Load: HS 20,  Features Intersected: TIOUGHNIOGA RIVER
Minimum Vertical Clearance: 4.47m (14.67ft),  Kilometerpoint: 25.197,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 57.9m (190.0ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Fair,  Channel: Fair,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.97m (19.59ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 12 months,  Inspection Date: December 2021,  Critical Feature Inspection Date: December 2021,  Bridge Improvement Cost: $4,626,000,  Roadway Improvement Cost: $2,709,000,  Total Project Cost: $7,334,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 100839,  Location: 1.3 MI N JCT US11 & SH222 (Lat: 42.616994,  Lng: -76.184572),  Route carried "on" structure: US 11,  Year Built: 1998,  Status: Open,  Structure Length: 7.65m (25.10ft),  Average Daily Traffic: 5,160 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 6,268 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: NY SUSQUEHNNA & W
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 29.429,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 23 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 35.0m (114.8ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 15.8m (51.8ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 76.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.65m (25.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $2,567,000,  Roadway Improvement Cost: $1,503,000,  Total Project Cost: $4,070,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1024911,  Location: .1 MI NW OF EXIT 10 - I81 (Lat: 42.591181,  Lng: -76.132603),  Route carried "on" structure: Interstate 81,  Year Built: 1966,  Status: Open,  Structure Length: 8.93m (29.30ft),  Average Daily Traffic: 9,861 (year 2009),  Truck Traffic: 31%,  Design Load: HS 20,  Features Intersected: RTE 41
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.848,  Lanes on structure: 3,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.1m (43.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 34.7m (113.8ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 14.4m (47.2ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 70.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.93m (29.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $2,611,000,  Roadway Improvement Cost: $1,529,000,  Total Project Cost: $4,140,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1024912,  Location: .1 MI NW OF EXIT 10 - I81 (Lat: 42.591106,  Lng: -76.131689),  Route carried "on" structure: Interstate 81,  Year Built: 1966,  Status: Open,  Structure Length: 8.32m (27.30ft),  Average Daily Traffic: 7,486 (year 2019),  Truck Traffic: 27%,  Average Future Daily Traffic: 10,798 (year 2040),  Design Load: HS 20,  Features Intersected: RTE 41
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.848,  Lanes on structure: 3,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.3m (46.9ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 33.8m (110.9ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 14.4m (47.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 79.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.32m (27.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $2,483,000,  Roadway Improvement Cost: $1,454,000,  Total Project Cost: $3,937,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1031331,  Location: 7.9 Mi N Jct Rts I-81 & 2 (Lat: 42.546786,  Lng: -76.094294),  Route carried "on" structure: Interstate 81,  Year Built: 2006,  Status: Open,  Structure Length: 19.93m (65.39ft),  Average Daily Traffic: 9,861 (year 2009),  Truck Traffic: 30%,  Design Load: HL 93,  Features Intersected: Hoxie Gorge Rd, HOXIE GO
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.846,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 56.1m (184.1ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 55.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 42.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 19.93m (65.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $4,960,000,  Roadway Improvement Cost: $2,905,000,  Total Project Cost: $7,865,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1031332,  Location: 7.9 Mi N Jct Rts I81 & 22 (Lat: 42.546908,  Lng: -76.093956),  Route carried "on" structure: Interstate 81,  Year Built: 2007,  Status: Open,  Structure Length: 19.78m (64.90ft),  Average Daily Traffic: 7,486 (year 2019),  Truck Traffic: 27%,  Average Future Daily Traffic: 8,391 (year 2040),  Design Load: HL 93,  Features Intersected: Hoxie Gorge Rd, HOXIE GO
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.846,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 56.0m (183.7ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 75.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 19.78m (64.90ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $4,953,000,  Roadway Improvement Cost: $2,901,000,  Total Project Cost: $7,854,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1031341,  Location: 8.3 MI N JCT RTS I-81+221 (Lat: 42.551514,  Lng: -76.098200),  Route carried "on" structure: Interstate 81,  Year Built: 1966,  Status: Open,  Structure Length: 4.24m (13.91ft),  Average Daily Traffic: 9,861 (year 2009),  Truck Traffic: 30%,  Design Load: HS 20+Mod,  Features Intersected: SOUTH HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.570,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.0m (45.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 35.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 26.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.23m (13.88ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $952,000,  Roadway Improvement Cost: $558,000,  Total Project Cost: $1,510,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1031342,  Location: 8.3 MI N JCT RTS I-81+221 (Lat: 42.551814,  Lng: -76.097867),  Route carried "on" structure: Interstate 81,  Year Built: 1966,  Status: Open,  Structure Length: 4.27m (14.01ft),  Average Daily Traffic: 7,486 (year 2019),  Truck Traffic: 27%,  Average Future Daily Traffic: 8,391 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: SOUTH HILL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.570,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.3m (46.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 48.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.26m (13.98ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $960,000,  Roadway Improvement Cost: $562,000,  Total Project Cost: $1,523,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1031351,  Location: 0.6 MI S JCT RTS I-81 +41 (Lat: 42.586389,  Lng: -76.127631),  Route carried "on" structure: Interstate 81,  Year Built: 1966,  Status: Open,  Structure Length: 8.29m (27.20ft),  Average Daily Traffic: 9,861 (year 2009),  Truck Traffic: 30%,  Design Load: HS 20+Mod,  Features Intersected: RIDGE ROAD, TROUT BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.220,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 27.7m (90.9ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 14.4m (47.2ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present desirable criteria,  Underclear: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.29m (27.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $2,316,000,  Roadway Improvement Cost: $1,356,000,  Total Project Cost: $3,672,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1031352,  Location: 0.6 MI S JCT RTS I-81 +41 (Lat: 42.586553,  Lng: -76.127111),  Route carried "on" structure: Interstate 81,  Year Built: 1966,  Status: Open,  Structure Length: 9.08m (29.79ft),  Average Daily Traffic: 7,486 (year 2019),  Truck Traffic: 27%,  Average Future Daily Traffic: 10,798 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: RIDGE ROAD, TROUT BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.220,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 27.7m (90.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 61.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.08m (29.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $1,910,000,  Roadway Improvement Cost: $1,118,000,  Total Project Cost: $3,028,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 103136,  Location: 1.6 MI N JCT RTS I-81 +41 (Lat: 42.604072,  Lng: -76.157072),  Route carried "on" structure: County highway ,  Year Built: 1966,  Status: Open,  Structure Length: 12.47m (40.91ft),  Average Daily Traffic: 716 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,002 (year 2040),  Design Load: HS 20,  Features Intersected: 81I 81I32021159, 81I 81I,  Facility Carried by Structure: EAST RIVER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.644,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 23.7m (77.8ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 12.46m (40.88ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $2,637,000,  Roadway Improvement Cost: $1,544,000,  Total Project Cost: $4,180,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1031371,  Location: JCT RTE 81I+TIOUGHNIOGA R (Lat: 42.606628,  Lng: -76.158103),  Route carried "on" structure: Interstate 81,  Year Built: 1966,  Year Reconstructed: 2009,  Status: Open,  Structure Length: 12.41m (40.72ft),  Average Daily Traffic: 9,431 (year 2008),  Truck Traffic: 31%,  Design Load: HS 20,  Features Intersected: TIOUGHNIOGA RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 23.7m (77.8ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 38.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 12.40m (40.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $2,771,000,  Roadway Improvement Cost: $1,623,000,  Total Project Cost: $4,394,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 1031372,  Location: JCT RTE 81I+TIOUGHNIOGA R (Lat: 42.607225,  Lng: -76.157956),  Route carried "on" structure: Interstate 81,  Year Built: 1966,  Status: Open,  Structure Length: 12.22m (40.09ft),  Average Daily Traffic: 7,217 (year 2019),  Truck Traffic: 26%,  Average Future Daily Traffic: 10,410 (year 2040),  Design Load: HS 20,  Features Intersected: TIOUGHNIOGA RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.841,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 23.4m (76.8ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Fair,  Operating Rating: 42.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 12.22m (40.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $2,593,000,  Roadway Improvement Cost: $1,518,000,  Total Project Cost: $4,111,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 103139,  Location: 1.9 MI N JCT I81 & SH 13 (Lat: 42.625369,  Lng: -76.177478),  Route carried "on" structure: Ramp Interstate ,  Year Built: 1966,  Status: Open,  Structure Length: 10.64m (34.91ft),  Average Daily Traffic: 2,527 (year 2017),  Truck Traffic: 10%,  Average Future Daily Traffic: 2,832 (year 2040),  Design Load: HS 20,  Features Intersected: 81I 81I32023008 SB, RTE,  Facility Carried by Structure: RAMP TO HOMER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.225,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 23 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 23.7m (77.8ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.63m (34.88ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $1,591,000,  Total Project Cost: $4,309,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 104441,  Location: 0.1 MI NE JCT RTS 281+222 (Lat: 42.599414,  Lng: -76.203631),  Route carried "on" structure: State highway 281,  Year Built: 2017,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 15,939 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 16,013 (year 2040),  Design Load: HS 20,  Features Intersected: DRY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.767,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.4m (76.8ft),  Skew: 21 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft),  Curb or Sidewalk Widths: Left: 2.7m (8.9ft),  Right: 2.7m (8.9ft),  Curb-To-Curb Width: 23.4m (76.8ft),  Out-to-Out Width: 32.6m (107.0ft)

Condition: Superstructure: Excellent,  Substructure: Excellent,  Channel: Satisfactory,  Operating Rating: 78.8 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $977,000,  Roadway Improvement Cost: $572,000,  Total Project Cost: $1,549,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 109376,  Location: 3.6 MI N VIRGIL ON RTE 90 (Lat: 42.560728,  Lng: -76.190531),  Route carried "on" structure: State highway 215,  Year Built: 1971,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 1,371 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,919 (year 2040),  Design Load: HS 20,  Features Intersected: OTTER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.825,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.3m (10.8ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 74.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 29.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.73m (2.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $248,000,  Roadway Improvement Cost: $145,000,  Total Project Cost: $393,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 220722,  Location: 3.5 MI S OF MCGRAW (Lat: 42.546983,  Lng: -76.093583),  Route carried "on" structure: Other road ,  Year Built: 1940,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 289 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 405 (year 2037),  Features Intersected: HOXIE GORGE CREEK,  Facility Carried by Structure: HOXIE GORGE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.306,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.6m (15.1ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.7m (18.7ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Critical,  Channel: Poor,  Operating Rating: 73.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 29.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: High priority of replacement,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.28m (4.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $321,000,  Roadway Improvement Cost: $188,000,  Total Project Cost: $509,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 220723,  Location: 3.5 MI S OF MCGRAW (Lat: 42.547347,  Lng: -76.091689),  Route carried "on" structure: Other road ,  Year Built: 1940,  Status: Open,  Structure Length: 1.40m (4.59ft),  Average Daily Traffic: 289 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 405 (year 2037),  Features Intersected: HOXIE GORGE,  Facility Carried by Structure: HOXIE GORGE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.451,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.6m (15.1ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.7m (18.7ft),  Curb-To-Curb Width: 6.8m (22.3ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Poor,  Operating Rating: 73.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $399,000,  Roadway Improvement Cost: $233,000,  Total Project Cost: $632,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 331186,  Location: 1 MI NW JCT SH222 & SH281 (Lat: 42.604389,  Lng: -76.214931),  Route carried "on" structure: County highway ,  Year Built: 2018,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 1,600 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,979 (year 2040),  Features Intersected: BLUE CREEK,  Facility Carried by Structure: KINNEY GULF ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.094,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.4m (57.1ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Excellent,  Superstructure: Very good,  Substructure: Excellent,  Channel: Excellent,  Operating Rating: 84.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.82m (5.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $335,000,  Roadway Improvement Cost: $196,000,  Total Project Cost: $532,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 331199,  Location: 1.4 MILES SE OF MCGRAW (Lat: 42.585219,  Lng: -76.070667),  Route carried "on" structure: County highway ,  Year Built: 2005,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 837 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 1,035 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: SMITH BROOK,  Facility Carried by Structure: COUNTY ROAD 116
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.747,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.6m (31.5ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 97.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 58.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.97m (3.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $306,000,  Roadway Improvement Cost: $179,000,  Total Project Cost: $485,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 33123,  Location: 1.5 MI NW OF CORTLAND (Lat: 42.626603,  Lng: -76.147853),  Route carried "on" structure: County highway ,  Year Built: 1937,  Status: Open,  Structure Length: 5.46m (17.91ft),  Average Daily Traffic: 828 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,159 (year 2038),  Design Load: H 20,  Features Intersected: EAST BRANCH TIOUGHNIOGA,  Facility Carried by Structure: Loring Crossing Ro
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.386,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Frame,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 26.2m (86.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.7m (31.8ft)

Condition: Deck: Serious,  Superstructure: Serious,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 61.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 15.1 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: High priority of corrective action,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.45m (17.88ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,270,000,  Roadway Improvement Cost: $744,000,  Total Project Cost: $2,014,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 331252,  Location: 0.2 MI E OF BLODGETT MILL (Lat: 42.568231,  Lng: -76.121122),  Route carried "on" structure: County highway ,  Year Built: 1965,  Year Reconstructed: 2019,  Status: Open,  Structure Length: 5.94m (19.49ft),  Average Daily Traffic: 865 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,211 (year 2038),  Design Load: HS 20+Mod,  Features Intersected: TIOUGHNIOGA RIVER,  Facility Carried by Structure: BLODGETT MLLS W R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.354,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 29.0m (95.1ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Very good,  Channel: Very good,  Operating Rating: 86.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.94m (19.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $1,271,000,  Roadway Improvement Cost: $744,000,  Total Project Cost: $2,015,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 336774,  Location: 1.0 MI W OF CORTLAND (Lat: 42.613617,  Lng: -76.214128),  Route carried "on" structure: Other road ,  Year Built: 1996,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 373 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 522 (year 2039),  Features Intersected: BLUE CREEK,  Facility Carried by Structure: BLUE CREEK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.853,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 1 degrees,  Material/Design: Aluminum, Iron,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 22.0m (72.2ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 77.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.85m (2.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $436,000,  Roadway Improvement Cost: $255,000,  Total Project Cost: $691,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 336961,  Location: W VILLAGE LINE MCGRAW (Lat: 42.591867,  Lng: -76.107950),  Route carried "on" structure: County highway ,  Year Built: 1999,  Status: Open,  Structure Length: 3.35m (10.99ft),  Average Daily Traffic: 671 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 939 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: TROUT BROOK,  Facility Carried by Structure: ELM STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 32.9m (107.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 73.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.35m (10.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $699,000,  Roadway Improvement Cost: $409,000,  Total Project Cost: $1,108,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1024911,  Location: .1 MI NW OF EXIT 10 - I81 (Lat: 42.591181,  Lng: -76.132603),  Route carried "under" structure: State highway 41,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 9,340 (year 1998),  Features Intersected: RTE 41,  Facility Carried by Structure: RTE I81
Minimum Vertical Clearance: 6.14m (20.14ft),  Kilometerpoint: 36.235,  Lanes on structure: 3,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 34.7m (113.8ft)

Find on map >>   Show street view

Structure Number: 1024912,  Location: .1 MI NW OF EXIT 10 - I81 (Lat: 42.591106,  Lng: -76.131689),  Route carried "under" structure: State highway 41,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 9,340 (year 1998),  Features Intersected: RTE 41,  Facility Carried by Structure: RTE I81
Minimum Vertical Clearance: 6.14m (20.14ft),  Kilometerpoint: 36.235,  Lanes on structure: 3,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.8m (110.9ft)

Find on map >>   Show street view

Structure Number: 1031331,  Location: 7.9 Mi N Jct Rts I-81 & 2 (Lat: 42.546786,  Lng: -76.094294),  Route carried "under" structure: Other road ,  Year Built: 2006,  Structure Length: 0. m,  Average Daily Traffic: 145 (year 2017),  Truck Traffic: 8%,  Features Intersected: Hoxie Gorge Rd, HOXIE GO,  Facility Carried by Structure: RTE I81
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 56.1m (184.1ft)

Find on map >>   Show street view

Structure Number: 1031332,  Location: 7.9 Mi N Jct Rts I81 & 22 (Lat: 42.546908,  Lng: -76.093956),  Route carried "under" structure: Other road ,  Year Built: 2007,  Structure Length: 0. m,  Average Daily Traffic: 145 (year 2017),  Truck Traffic: 8%,  Features Intersected: Hoxie Gorge Rd, HOXIE GO,  Facility Carried by Structure: RTE I81
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.225,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 56.0m (183.7ft)

Find on map >>   Show street view

Structure Number: 1031341,  Location: 8.3 MI N JCT RTS I-81+221 (Lat: 42.551514,  Lng: -76.098200),  Route carried "under" structure: Other road ,  Year Built: 1966,  Structure Length: 0. m,  Features Intersected: SOUTH HILL ROAD,  Facility Carried by Structure: RTE I81
Minimum Vertical Clearance: 5.28m (17.32ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 14.0m (45.9ft)

Find on map >>   Show street view

Structure Number: 1031342,  Location: 8.3 MI N JCT RTS I-81+221 (Lat: 42.551814,  Lng: -76.097867),  Route carried "under" structure: Other road ,  Year Built: 1966,  Structure Length: 0. m,  Features Intersected: SOUTH HILL RD,  Facility Carried by Structure: RTE I81
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 0.338,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 14.3m (46.9ft)

Find on map >>   Show street view

Structure Number: 1031351,  Location: 0.6 MI S JCT RTS I-81 +41 (Lat: 42.586389,  Lng: -76.127631),  Route carried "under" structure: ServiceOther road ,  Year Built: 1966,  Structure Length: 0. m,  Features Intersected: RIDGE ROAD, TROUT BROOK,  Facility Carried by Structure: RTE I81
Minimum Vertical Clearance: 9.30m (30.51ft),  Kilometerpoint: 0.129,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.7m (90.9ft)

Find on map >>   Show street view

Structure Number: 1031352,  Location: 0.6 MI S JCT RTS I-81 +41 (Lat: 42.586553,  Lng: -76.127111),  Route carried "under" structure: ServiceOther road ,  Year Built: 1966,  Structure Length: 0. m,  Features Intersected: RIDGE ROAD, TROUT BROOK,  Facility Carried by Structure: RTE I81
Minimum Vertical Clearance: 9.45m (31.00ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.7m (90.9ft)

Find on map >>   Show street view

Structure Number: 103136,  Location: 1.6 MI N JCT RTS I-81 +41 (Lat: 42.604072,  Lng: -76.157072),  Route carried "under" structure: Interstate ,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 10,200 (year 1972),  Features Intersected: 81I 81I32021159, 81I 81I,  Facility Carried by Structure: EAST RIVER ROAD
Minimum Vertical Clearance: 5.44m (17.85ft),  Kilometerpoint: 25.615,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.7m (77.8ft)

Find on map >>   Show street view

Structure Number: 103139,  Location: 1.9 MI N JCT I81 & SH 13 (Lat: 42.625369,  Lng: -76.177478),  Route carried "under" structure: Interstate 81,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 22,061 (year 1999),  Features Intersected: 81I 81I32023008 SB, RTE,  Facility Carried by Structure: RAMP TO HOMER
Minimum Vertical Clearance: 5.36m (17.59ft),  Kilometerpoint: 1.352,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.7m (77.8ft)

Discuss Cortlandville, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.