Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Corydon, Iowa (IA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 15Number of bridges
  • 95ft / 28.7mTotal length
  • 5,480Total average daily traffic
  • 480Total average daily truck traffic
  • 5,480Total future (year 2031) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Corydon
  • No street view available for this location

New bridges in Corydon, IA - historical statistics
  • New bridges - historical statistics
  • 21950-1959
  • 11960-1969
  • 51980-1989
  • 11990-1999
  • 22000-2009
  • 42010-2019
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 14.3%Very good
  • 14.3%Good
  • 28.6%Satisfactory
  • 14.3%Fair
  • 14.3%Poor
  • 14.3%Failed
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 14.3%Very good
  • 14.3%Good
  • 42.9%Satisfactory
  • 14.3%Fair
  • 14.3%Failed
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 28.6%Very good
  • 14.3%Good
  • 28.6%Satisfactory
  • 14.3%Poor
  • 14.3%Failed
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 13.3%Very good
  • 33.3%Good
  • 40.0%Satisfactory
  • 13.3%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 25.0%Very good
  • 37.5%Good
  • 25.0%Satisfactory
  • 12.5%Fair
Find on map >>   Show street view

Structure Number: 5196,  Location: 1.7 MI. E OF IA 14 (Lat: 40.753536,  Lng: -93.285983),  Route carried "on" structure: State highway 2,  Year Built: 1962,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 2,320 (year 2020),  Truck Traffic: 14%,  Average Future Daily Traffic: 2,320 (year 2041),  Design Load: H 20,  Features Intersected: STREAM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 233.229,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 46.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021
Find on map >>   Show street view

Structure Number: 51991,  Location: 2.0 MI. N OF IA #2 (Lat: 40.785108,  Lng: -93.317767),  Route carried "on" structure: State highway 14,  Year Built: 1989,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 1,740 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 1,740 (year 2041),  Design Load: HS 20,  Features Intersected: WILDCAT CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.170,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 56.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021
Find on map >>   Show street view

Structure Number: 339011,  Location: 068210401 (Lat: 40.724536,  Lng: -93.288031),  Route carried "on" structure: County highway ,  Year Built: 1995,  Status: Open,  Structure Length: 1.40m (4.59ft),  Average Daily Traffic: 20 (year 2018),  Average Future Daily Traffic: 20 (year 2040),  Design Load: HS 20,  Features Intersected: STREAM,  Facility Carried by Structure: LOCAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.208,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.7m (44.9ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Inventory Rating: 60.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 4.60m (15.09ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $17,000,  Roadway Improvement Cost: $5,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 33919,  Location: 068220105 (Lat: 40.724381,  Lng: -93.328278),  Route carried "on" structure: County highway ,  Year Built: 1959,  Status: Closed,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 10 (year 2018),  Average Future Daily Traffic: 10 (year 2031),  Features Intersected: STREAM,  Facility Carried by Structure: LOCAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.013,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 4.8m (15.7ft),  Out-to-Out Width: 4.8m (15.7ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Poor,  Channel: Satisfactory,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 5.00m (16.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2011,  Bridge Improvement Cost: $110,000,  Roadway Improvement Cost: $11,000,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 33983,  Location: 069210504 (Lat: 40.802944,  Lng: -93.289781),  Route carried "on" structure: County highway ,  Year Built: 1958,  Status: Posted for load,  Structure Length: 5.43m (17.81ft),  Average Daily Traffic: 90 (year 2018),  Average Future Daily Traffic: 90 (year 2040),  Design Load: H 15,  Features Intersected: CHARITON RIVER,  Facility Carried by Structure: FM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.926,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.9m (71.9ft),  Curb-To-Curb Width: 6.2m (20.3ft),  Out-to-Out Width: 6.9m (22.6ft)

Condition: Deck: Poor,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 29.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 9.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of replacement,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 21.40m (70.21ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $577,000,  Roadway Improvement Cost: $58,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 339971,  Location: 069212704 (Lat: 40.739942,  Lng: -93.269428),  Route carried "on" structure: County highway ,  Year Built: 2001,  Status: Open,  Structure Length: 3.54m (11.61ft),  Average Daily Traffic: 690 (year 2018),  Average Future Daily Traffic: 690 (year 2039),  Design Load: HS 20,  Features Intersected: JACKSON CREEK,  Facility Carried by Structure: FM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.226,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.4m (44.0ft),  Curb-To-Curb Width: 9.3m (30.5ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 83.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 11.20m (36.75ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2019,  Bridge Improvement Cost: $15,000,  Roadway Improvement Cost: $2,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 339981,  Location: 069212904 (Lat: 40.743275,  Lng: -93.307586),  Route carried "on" structure: County highway ,  Year Built: 1988,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 130 (year 2018),  Average Future Daily Traffic: 130 (year 2041),  Design Load: HS 20,  Features Intersected: JACKSON CREEK,  Facility Carried by Structure: 140TH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.347,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.80m (12.47ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $15,000,  Roadway Improvement Cost: $2,000
Find on map >>   Show street view

Structure Number: 339991,  Location: 069213002 (Lat: 40.739033,  Lng: -93.321844),  Route carried "on" structure: County highway ,  Year Built: 2017,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 80 (year 2018),  Average Future Daily Traffic: 80 (year 2039),  Design Load: HL 93,  Features Intersected: JACKSON CREEK,  Facility Carried by Structure: 135TH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.345,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 67.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 52.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2019
Find on map >>   Show street view

Structure Number: 340001,  Location: 069213202 (Lat: 40.727797,  Lng: -93.307572),  Route carried "on" structure: County highway ,  Year Built: 2017,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 130 (year 2018),  Average Future Daily Traffic: 130 (year 2041),  Design Load: HL 93,  Features Intersected: STREAM,  Facility Carried by Structure: S34 140TH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.628,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 65.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 50.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: November 2021
Find on map >>   Show street view

Structure Number: 340021,  Location: 069213302 (Lat: 40.736147,  Lng: -93.288511),  Route carried "on" structure: County highway ,  Year Built: 1987,  Status: Closed,  Structure Length: 2.41m (7.91ft),  Average Daily Traffic: 25 (year 2018),  Average Future Daily Traffic: 25 (year 2039),  Features Intersected: JACKSON CREEK,  Facility Carried by Structure: LOCAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.498,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Failed,  Superstructure: Failed,  Substructure: Failed,  Channel: Satisfactory,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 11.00m (36.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2019,  Bridge Improvement Cost: $264,000,  Roadway Improvement Cost: $26,000,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 340041,  Location: 069213502 (Lat: 40.730911,  Lng: -93.250381),  Route carried "on" structure: County highway ,  Year Built: 1984,  Status: Posted for load,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 25 (year 2018),  Average Future Daily Traffic: 25 (year 2041),  Design Load: H 20,  Features Intersected: JACKSON CREEK,  Facility Carried by Structure: LOCAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.359,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.9m (39.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 35.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 10.00m (32.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $15,000,  Roadway Improvement Cost: $2,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 340131,  Location: 069221206 (Lat: 40.785478,  Lng: -93.329756),  Route carried "on" structure: County highway ,  Year Built: 1987,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 90 (year 2018),  Average Future Daily Traffic: 90 (year 2041),  Design Load: H 20,  Features Intersected: STREAM,  Facility Carried by Structure: LOCAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.210,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 36.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.20m (10.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $15,000,  Roadway Improvement Cost: $2,000
Find on map >>   Show street view

Structure Number: 340211,  Location: 069222503 (Lat: 40.746139,  Lng: -93.331458),  Route carried "on" structure: County highway ,  Year Built: 2000,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 60 (year 2018),  Average Future Daily Traffic: 60 (year 2039),  Design Load: HS 20,  Features Intersected: STREAM,  Facility Carried by Structure: LOCAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.653,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.50m (8.20ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2019,  Bridge Improvement Cost: $15,000,  Roadway Improvement Cost: $2,000
Find on map >>   Show street view

Structure Number: 341141,  Location: 070223504 (Lat: 40.812533,  Lng: -93.365325),  Route carried "on" structure: County highway ,  Year Built: 2018,  Status: Open,  Structure Length: 4.66m (15.29ft),  Average Daily Traffic: 35 (year 2018),  Average Future Daily Traffic: 35 (year 2041),  Design Load: HL 93,  Features Intersected: SOUTH CHARITON,  Facility Carried by Structure: 110TH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.974,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.0m (59.1ft),  Curb-To-Curb Width: 9.3m (30.5ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 42.1 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: November 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 36651,  Location: 069212102 (Lat: 40.755672,  Lng: -93.288483),  Route carried "on" structure: County highway ,  Year Built: 2019,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 35 (year 2018),  Average Future Daily Traffic: 35 (year 2040),  Features Intersected: TRIB TO W JACKSON CREEK,  Facility Carried by Structure: 150TH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.668,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020
Discuss Corydon, Iowa (IA) on our hugely popular Iowa forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.