Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Dudley, Massachusetts (MA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 12Number of bridges
  • 98ft / 30.3mTotal length
  • $26,333,000Total costs
  • 37,915Total average daily traffic
  • 2,425Total average daily truck traffic
  • 81,869Total future (year 2032) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Dudley
  • No street view available for this location

New bridges in Dudley, MA - historical statistics
  • New bridges - historical statistics
  • 2Before 1900
  • 11920-1929
  • 21930-1939
  • 11950-1959
  • 11990-1999
  • 12000-2009
  • 42010-2019
Reconstructed bridges in Dudley, MA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21950-1959
  • 01960-1969
  • 11970-1979
Average Bridge Daily Traffic in Dudley, MA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 36.4%Very good
  • 27.3%Good
  • 9.1%Satisfactory
  • 18.2%Fair
  • 9.1%Serious
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 41.7%Very good
  • 8.3%Good
  • 33.3%Satisfactory
  • 8.3%Poor
  • 8.3%Serious
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 33.3%Very good
  • 33.3%Good
  • 25.0%Satisfactory
  • 8.3%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 16.7%Very good
  • 33.3%Good
  • 33.3%Satisfactory
  • 16.7%Fair
Find on map >>   Show street view

Structure Number: D1200192CMUNNBI,  Location: .2 MI E OF ST-12 (Lat: 42.024717,  Lng: -71.884006),  Route carried "on" structure: City street ,  Year Built: 2011,  Status: Open,  Structure Length: 2.77m (9.09ft),  Average Daily Traffic: 723 (year 2019),  Truck Traffic: 5%,  Design Load: HS 25 or greater,  Features Intersected: WATER FRENCH RIVER,  Facility Carried by Structure: HWY PERRYVLLE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.354,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 8.0m (26.2ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 26.0m (85.3ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 10.6m (34.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 92.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 66.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.80m (9.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $1,109,000,  Roadway Improvement Cost: $111,000,  Total Project Cost: $1,664,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: D1200290KMUNNBI,  Location: .1 MI EAST OF ST12 (Lat: 42.024894,  Lng: -71.885753),  Route carried "on" structure: City street ,  Year Built: 2010,  Status: Open,  Structure Length: 2.25m (7.38ft),  Average Daily Traffic: 723 (year 2019),  Truck Traffic: 1%,  Design Load: HS 25 or greater,  Features Intersected: WATER CANAL,  Facility Carried by Structure: HWY PERRYVLLE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.145,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.2m (23.6ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.0m (68.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 9.6m (31.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Fair,  Operating Rating: 93.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 56.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.30m (7.55ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $1,085,000,  Roadway Improvement Cost: $109,000,  Total Project Cost: $1,628,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: D1200390JMUNNBI,  Location: E. OF RT 12 AT CT. BORDER (Lat: 42.025192,  Lng: -71.885500),  Route carried "on" structure: City street ,  Year Built: 2010,  Status: Open,  Structure Length: 1.77m (5.81ft),  Average Daily Traffic: 100 (year 2019),  Truck Traffic: 1%,  Design Load: HS 25 or greater,  Features Intersected: WATER CANAL,  Facility Carried by Structure: HWY UPPER PERRVL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.400,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.0m (19.7ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.0m (52.5ft),  Curb-To-Curb Width: 6.0m (19.7ft),  Out-to-Out Width: 7.0m (23.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 86.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.80m (5.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $645,000,  Roadway Improvement Cost: $65,000,  Total Project Cost: $968,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: D120041BGMUNNBI,  Location: .1 MILE EAST OF CHASE AVE (Lat: 42.043167,  Lng: -71.887369),  Route carried "on" structure: City street ,  Year Built: 1925,  Status: Open,  Structure Length: 1.40m (4.59ft),  Average Daily Traffic: 1,875 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 2,843 (year 2032),  Features Intersected: WATER FRENCH RIVER,  Facility Carried by Structure: HWY BRANDON RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.161,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.6m (18.4ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.8m (42.0ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 5.6m (18.4ft),  Out-to-Out Width: 6.2m (20.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 50.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.50m (4.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $366,000,  Roadway Improvement Cost: $37,000,  Total Project Cost: $550,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: D120051BEMUNNBI,  Location: .25 MI S OF RTE 12 (Lat: 42.046631,  Lng: -71.887069),  Route carried "on" structure: City street ,  Year Built: 1956,  Status: Open,  Structure Length: 2.62m (8.60ft),  Average Daily Traffic: 2,500 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 3,948 (year 2031),  Design Load: H 20,  Features Intersected: WATER FRENCH RIVER,  Facility Carried by Structure: HWY CHASE AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.772,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.3m (83.0ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 62.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.70m (8.86ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: June 2020,  Underwater Inspection Date: Febuary 2021,  Bridge Improvement Cost: $2,249,000,  Roadway Improvement Cost: $225,000,  Total Project Cost: $3,374,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: D120061YRDOTNBI,  Location: AT WEBSTER-DUDLEY T.L. (Lat: 42.049264,  Lng: -71.887439),  Route carried "on" structure: State highway 12,  Year Built: 1868,  Year Reconstructed: 1956,  Status: Open,  Structure Length: 1.77m (5.81ft),  Average Daily Traffic: 11,288 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 31,586 (year 2032),  Design Load: H 20,  Features Intersected: WATER FRENCH RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.953,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Masonry,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.8m (42.0ft),  Curb or Sidewalk Widths: Left: 2.9m (9.5ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 12.4m (40.7ft),  Out-to-Out Width: 16.8m (55.1ft)

Condition: Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Inventory Rating: 68.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.80m (5.91ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: June 2021,  Underwater Inspection Date: December 2019,  Bridge Improvement Cost: $170,000,  Roadway Improvement Cost: $18,000,  Total Project Cost: $256,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: D12007AJTMUNNBI,  Location: .1 MILE NO. OF ST - 12 (Lat: 42.050814,  Lng: -71.885019),  Route carried "on" structure: City street ,  Year Built: 2000,  Status: Open,  Structure Length: 2.60m (8.53ft),  Average Daily Traffic: 3,418 (year 2015),  Truck Traffic: 3%,  Average Future Daily Traffic: 3,474 (year 2032),  Design Load: HS 20,  Features Intersected: WATER FRENCH RIVER,  Facility Carried by Structure: HWY OXFORD AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.177,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.0m (82.0ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 70.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.70m (8.86ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,248,000,  Roadway Improvement Cost: $125,000,  Total Project Cost: $1,873,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: D12010B8NMUNNBI,  Location: .2 MI. E. OF ST- 131 (Lat: 42.050022,  Lng: -71.981283),  Route carried "on" structure: City street ,  Year Built: 2013,  Status: Open,  Structure Length: 3.27m (10.73ft),  Average Daily Traffic: 428 (year 2018),  Truck Traffic: 4%,  Design Load: HL 93,  Features Intersected: WATER QUINEBAUG RIVER,  Facility Carried by Structure: HWY W DUDLEY RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.338,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 31.2m (102.4ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 97.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 74.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 4.20m (13.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $3,674,000,  Roadway Improvement Cost: $368,000,  Total Project Cost: $5,512,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: D120201FFMUNNBI,  Location: AT CEMETERY RD (Lat: 42.065081,  Lng: -71.879242),  Route carried "on" structure: City street ,  Year Built: 1993,  Status: Open,  Structure Length: 2.50m (8.20ft),  Average Daily Traffic: 6,300 (year 2002),  Truck Traffic: 2%,  Average Future Daily Traffic: 7,596 (year 2033),  Design Load: HS 20,  Features Intersected: WATER FRENCH RIVER,  Facility Carried by Structure: HWY N MAIN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.6m (74.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 11.1m (36.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 82.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 2.60m (8.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $1,202,000,  Roadway Improvement Cost: $121,000,  Total Project Cost: $1,804,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: D120221FGMUNNBI,  Location: .1 MI N OF ST-12 (Lat: 42.051081,  Lng: -71.882906),  Route carried "on" structure: City street ,  Year Built: 1890,  Year Reconstructed: 1957,  Status: Posted for load,  Structure Length: 2.04m (6.69ft),  Average Future Daily Traffic: 205 (year 2033),  Design Load: H 15,  Features Intersected: WATER FRENCH RIVER,  Facility Carried by Structure: HWY TRACY CT
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.2m (63.0ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 3.7m (12.1ft),  Out-to-Out Width: 5.6m (18.4ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 39.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 21.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.10m (6.89ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: March 2022,  Critical Feature Inspection Date: March 2022,  Bridge Improvement Cost: $462,000,  Roadway Improvement Cost: $47,000,  Total Project Cost: $694,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: D120261XXDOTNBI,  Location: 0.4 MI N OF THOM. CT. T.L (Lat: 42.027797,  Lng: -71.959525),  Route carried "on" structure: State highway 131,  Year Built: 1938,  Year Reconstructed: 1984,  Status: Temporarily open,  Structure Length: 5.58m (18.31ft),  Average Daily Traffic: 8,300 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 26,374 (year 2033),  Design Load: H 20,  Features Intersected: WATER QUINEBAUG RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.255,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.6m (57.7ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 11.4m (37.4ft),  Out-to-Out Width: 14.8m (48.6ft)

Condition: Deck: Serious,  Superstructure: Serious,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 57.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.60m (18.37ft),  Designated Inspection Frequency: Every 6 months,  Underwater Inspection Frequency: Every 36 months,  Other Special Inspection Frequency: Every 6 months,  Inspection Date: March 2020,  Underwater Inspection Date: June 2019,  Other Special Inspection Date: September 2021,  Bridge Improvement Cost: $3,256,000,  Roadway Improvement Cost: $326,000,  Total Project Cost: $4,885,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: D120271BJMUNNBI,  Location: .3MI. EST. OF ST-12 (Lat: 42.043244,  Lng: -71.888203),  Route carried "on" structure: City street ,  Year Built: 1937,  Status: Closed,  Structure Length: 1.71m (5.61ft),  Average Daily Traffic: 2,260 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 5,843 (year 2032),  Design Load: H 15,  Features Intersected: OTHER MILL RACE (DRY),  Facility Carried by Structure: HWY BRANDON RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.901,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.2m (49.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Good,  Channel: Good,  Operating Rating: 14.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 8.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.50m (8.20ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $2,083,000,  Roadway Improvement Cost: $209,000,  Total Project Cost: $3,125,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Discuss Dudley, Massachusetts (MA) on our hugely popular Massachusetts forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.