Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Eclectic, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 32Number of bridges
  • 285ft / 86.7mTotal length
  • $29,932,000Total costs
  • 56,410Total average daily traffic
  • 4,231Total average daily truck traffic
  • 79,250Total future (year 2027) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Eclectic
  • No street view available for this location

New bridges in Eclectic, AL - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 11940-1949
  • 21950-1959
  • 21960-1969
  • 51970-1979
  • 121980-1989
  • 51990-1999
  • 12000-2009
  • 22010-2019
  • 12020-2022
Reconstructed bridges in Eclectic, AL - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11970-1979
  • 01980-1989
  • 01990-1999
  • 12000-2009
Average Bridge Daily Traffic in Eclectic, AL
Average Bridge Truck Traffic in Eclectic, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 57.1%Good
  • 38.1%Satisfactory
  • 4.8%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 71.4%Good
  • 23.8%Satisfactory
  • 4.8%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 61.9%Good
  • 28.6%Satisfactory
  • 9.5%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 3.1%Excellent
  • 18.8%Very good
  • 50.0%Good
  • 15.6%Satisfactory
  • 12.5%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 27.3%Excellent
  • 36.4%Good
  • 36.4%Satisfactory
Find on map >>   Show street view

Structure Number: 7396,  Location: SEC 35 T19N R20E (Lat: 32.586667,  Lng: -86.033333),  Route carried "on" structure: County highway 34,  Year Built: 1966,  Status: Open,  Structure Length: 2.90m (9.51ft),  Average Daily Traffic: 300 (year 1998),  Truck Traffic: 15%,  Average Future Daily Traffic: 310 (year 2031),  Design Load: H 15,  Features Intersected: TUMPKEHATCHEE CREEK,  Facility Carried by Structure: Claud Fleahop Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 45.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 3.81m (12.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $653,000,  Roadway Improvement Cost: $65,000,  Total Project Cost: $718,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 8024,  Location: SEC 5 T19N R21E (Lat: 32.658333,  Lng: -85.980000),  Route carried "on" structure: County highway 67,  Year Built: 1967,  Year Reconstructed: 2007,  Status: Posted for load,  Structure Length: 5.79m (19.00ft),  Average Daily Traffic: 160 (year 1998),  Truck Traffic: 6%,  Average Future Daily Traffic: 180 (year 2030),  Design Load: H 15,  Features Intersected: CHANNAHATCHEE CREEK,  Facility Carried by Structure: Double Bridge
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 10,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 34.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 6.83m (22.41ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: August 2021,  Other Special Inspection Date: August 2021,  Bridge Improvement Cost: $1,171,000,  Roadway Improvement Cost: $117,000,  Total Project Cost: $1,288,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 10936,  Location: SEC 17 T17N R19E (Lat: 32.458303,  Lng: -86.181986),  Route carried "on" structure: County highway 8,  Year Built: 1973,  Status: Open,  Structure Length: 3.47m (11.38ft),  Average Daily Traffic: 8,500 (year 2004),  Truck Traffic: 20%,  Average Future Daily Traffic: 15,000 (year 2031),  Design Load: H 15,  Features Intersected: HARWELL MILL CREEK,  Facility Carried by Structure: Redland Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Fair,  Operating Rating: 45.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 4.37m (14.34ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $809,000,  Roadway Improvement Cost: $81,000,  Total Project Cost: $890,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 11257,  Location: SEC 1 T19N R20E (Lat: 32.654975,  Lng: -86.022739),  Route carried "on" structure: County highway 73,  Year Built: 1974,  Status: Open,  Structure Length: 4.63m (15.19ft),  Average Daily Traffic: 350 (year 1998),  Truck Traffic: 4%,  Average Future Daily Traffic: 370 (year 2031),  Design Load: H 15,  Features Intersected: CHANNAHATCHEE CREEK,  Facility Carried by Structure: North Ann Street
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 45.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 5.63m (18.47ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: July 2020,  Other Special Inspection Date: July 2021,  Bridge Improvement Cost: $1,042,000,  Roadway Improvement Cost: $104,000,  Total Project Cost: $1,146,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 11474,  Location: SEC 29 T20N R20E (Lat: 32.685000,  Lng: -86.091667),  Route carried "on" structure: County highway 80,  Year Built: 1975,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 450 (year 1998),  Truck Traffic: 12%,  Average Future Daily Traffic: 460 (year 2032),  Design Load: HS 15,  Features Intersected: CHANNAHATCHEE CREEK,  Facility Carried by Structure: Mt. Hebron Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 38.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 18.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.84m (6.04ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $340,000,  Roadway Improvement Cost: $34,000,  Total Project Cost: $374,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 11947,  Location: SEC 35 T20N R20E (Lat: 32.671228,  Lng: -86.040508),  Route carried "on" structure: County highway ,  Year Built: 1978,  Status: Open,  Structure Length: 4.05m (13.29ft),  Average Daily Traffic: 40 (year 1998),  Average Future Daily Traffic: 45 (year 2030),  Design Load: H 15,  Features Intersected: CHANNAHATCHEE CREEK,  Facility Carried by Structure: Avant Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 45.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 5.01m (16.44ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $928,000,  Roadway Improvement Cost: $93,000,  Total Project Cost: $1,021,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 12213,  Location: SEC 36 T20N R19E (Lat: 32.681667,  Lng: -86.126667),  Route carried "on" structure: County highway 80,  Year Built: 1979,  Status: Open,  Structure Length: 3.47m (11.38ft),  Average Daily Traffic: 300 (year 1998),  Truck Traffic: 8%,  Average Future Daily Traffic: 400 (year 2030),  Design Load: H 15,  Features Intersected: PATTERSON CREEK,  Facility Carried by Structure: West Central Road
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 45.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 4.38m (14.37ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $810,000,  Roadway Improvement Cost: $81,000,  Total Project Cost: $891,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 12586,  Location: SEC.22,T19N,R20E (Lat: 32.606511,  Lng: -86.078094),  Route carried "on" structure: County highway 42,  Year Built: 1981,  Status: Open,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 200 (year 1998),  Truck Traffic: 15%,  Average Future Daily Traffic: 300 (year 2031),  Design Load: H 15,  Features Intersected: TOWNSEND CREEK,  Facility Carried by Structure: Old Salem Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 46.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.44m (8.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $452,000,  Roadway Improvement Cost: $45,000,  Total Project Cost: $497,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 12858,  Location: 0.2 MI.E.OF AL 63 (Lat: 32.578208,  Lng: -86.066764),  Route carried "on" structure: State highway 14,  Year Built: 1929,  Year Reconstructed: 1983,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 4,060 (year 2013),  Truck Traffic: 3%,  Average Future Daily Traffic: 5,468 (year 2033),  Design Load: HS 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 290.984,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 63.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $203,000,  Roadway Improvement Cost: $20,000,  Total Project Cost: $223,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 12983,  Location: 1.0 MI.W.OF AL 63 (Lat: 32.580000,  Lng: -86.088333),  Route carried "on" structure: State highway 14,  Year Built: 1983,  Status: Open,  Structure Length: 8.75m (28.71ft),  Average Daily Traffic: 6,020 (year 2013),  Truck Traffic: 7%,  Average Future Daily Traffic: 8,108 (year 2033),  Design Load: HS 20,  Features Intersected: CHUBBEHATCHEE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 288.879,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 12.5m (41.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 9.73m (31.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $2,803,000,  Roadway Improvement Cost: $280,000,  Total Project Cost: $3,083,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 12984,  Location: 0.2 MI.W.OF AL 63 (Lat: 32.580000,  Lng: -86.073300),  Route carried "on" structure: State highway 14,  Year Built: 1983,  Status: Open,  Structure Length: 3.75m (12.30ft),  Average Daily Traffic: 5,250 (year 2013),  Truck Traffic: 5%,  Average Future Daily Traffic: 7,071 (year 2033),  Design Load: HS 20,  Features Intersected: HANEY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 290.334,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.5m (41.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 4.68m (15.35ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $1,347,000,  Roadway Improvement Cost: $135,000,  Total Project Cost: $1,482,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 12985,  Location: 2.2 MI.E.OF AL 63 (Lat: 32.573333,  Lng: -86.031667),  Route carried "on" structure: State highway 14,  Year Built: 1983,  Status: Open,  Structure Length: 3.75m (12.30ft),  Average Daily Traffic: 3,380 (year 2013),  Truck Traffic: 4%,  Average Future Daily Traffic: 4,552 (year 2033),  Design Load: HS 20,  Features Intersected: TUMPKEEHATCHEE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 294.196,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.5m (41.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Excellent,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 4.68m (15.35ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $1,347,000,  Roadway Improvement Cost: $135,000,  Total Project Cost: $1,482,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 12986,  Location: 4.3 MI.E.OF AL 63 (Lat: 32.580636,  Lng: -85.992450),  Route carried "on" structure: State highway 14,  Year Built: 1983,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 3,620 (year 2013),  Truck Traffic: 4%,  Average Future Daily Traffic: 4,876 (year 2033),  Design Load: HS 20,  Features Intersected: WALLAHATCHEE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 297.518,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 75.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.55m (5.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $688,000,  Roadway Improvement Cost: $69,000,  Total Project Cost: $757,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 12987,  Location: 4.6 MI.E.OF AL 63 (Lat: 32.580233,  Lng: -86.000097),  Route carried "on" structure: State highway 14,  Year Built: 1983,  Status: Open,  Structure Length: 5.00m (16.40ft),  Average Daily Traffic: 3,620 (year 2013),  Truck Traffic: 4%,  Average Future Daily Traffic: 4,876 (year 2033),  Design Load: HS 20,  Features Intersected: WALLAHATCHEE CREEK#1
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 298.047,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 12.5m (41.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 6.02m (19.75ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $1,732,000,  Roadway Improvement Cost: $173,000,  Total Project Cost: $1,905,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 13391,  Location: SEC 25 T19N R20E (Lat: 32.608333,  Lng: -86.010000),  Route carried "on" structure: County highway 180,  Year Built: 1984,  Status: Open,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 330 (year 1998),  Truck Traffic: 12%,  Average Future Daily Traffic: 380 (year 2031),  Design Load: H 15,  Features Intersected: WALLAHATCHEE CREEK,  Facility Carried by Structure: Claud Fleahop Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 45.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.44m (8.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $452,000,  Roadway Improvement Cost: $45,000,  Total Project Cost: $497,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 13395,  Location: SEC 30 T19N R20E (Lat: 32.600000,  Lng: -86.093333),  Route carried "on" structure: County highway 192,  Year Built: 1984,  Status: Open,  Structure Length: 2.99m (9.81ft),  Average Daily Traffic: 300 (year 1998),  Truck Traffic: 12%,  Average Future Daily Traffic: 350 (year 2031),  Design Load: H 15,  Features Intersected: CHUBBEHATCHEE CREEK,  Facility Carried by Structure: Old Salem Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 14.9m (48.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 44.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.88m (12.73ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $719,000,  Roadway Improvement Cost: $72,000,  Total Project Cost: $791,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 13972,  Location: 3.0 MI.N.OF ECLECTIC (Lat: 32.669550,  Lng: -86.037367),  Route carried "on" structure: State highway 63,  Year Built: 1986,  Status: Open,  Structure Length: 5.00m (16.40ft),  Average Daily Traffic: 3,620 (year 2013),  Truck Traffic: 6%,  Average Future Daily Traffic: 5,022 (year 2033),  Design Load: HS 20,  Features Intersected: CHANNAHATCHEE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.311,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 12.5m (41.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 6.02m (19.75ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $1,732,000,  Roadway Improvement Cost: $173,000,  Total Project Cost: $1,905,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 14008,  Location: SEC 9 T19N R21E (Lat: 32.641667,  Lng: -85.958333),  Route carried "on" structure: County highway 173,  Year Built: 1986,  Status: Open,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 235 (year 1998),  Truck Traffic: 4%,  Average Future Daily Traffic: 250 (year 2030),  Design Load: H 15,  Features Intersected: CHANNAHATCHEE CREEKSPUR,  Facility Carried by Structure: Atkins Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 45.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.44m (8.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $452,000,  Roadway Improvement Cost: $45,000,  Total Project Cost: $497,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 14969,  Location: SEC 3 T19N R20E (Lat: 32.663333,  Lng: -86.125000),  Route carried "on" structure: County highway 415,  Year Built: 1989,  Status: Open,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 60 (year 1998),  Average Future Daily Traffic: 70 (year 2030),  Design Load: HS 15,  Features Intersected: CHANNAHATCHEE CREEK,  Facility Carried by Structure: Union Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 37.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.44m (8.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $418,000,  Roadway Improvement Cost: $42,000,  Total Project Cost: $460,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 15072,  Location: SEC 17 T19N R20E (Lat: 32.635000,  Lng: -86.086667),  Route carried "on" structure: County highway ,  Year Built: 1990,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 20 (year 1998),  Average Future Daily Traffic: 25 (year 2031),  Design Load: HS 20,  Features Intersected: SAND CREEK,  Facility Carried by Structure: Whipporwill Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 47.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.84m (6.04ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $378,000,  Roadway Improvement Cost: $38,000,  Total Project Cost: $416,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 15073,  Location: SEC 17 T19N R20E (Lat: 32.633333,  Lng: -86.086667),  Route carried "on" structure: County highway ,  Year Built: 1990,  Status: Open,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 20 (year 1998),  Average Future Daily Traffic: 25 (year 2031),  Design Load: HS 20,  Features Intersected: SAND CREEK,  Facility Carried by Structure: Whipporwill Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 47.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.44m (8.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $502,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $552,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 16878,  Location: 6.9MI E OF AL 14 (Lat: 32.619567,  Lng: -86.102575),  Route carried "on" structure: State highway 170,  Year Built: 1998,  Status: Open,  Structure Length: 0.65m (2.13ft),  Average Daily Traffic: 3,640 (year 2013),  Truck Traffic: 7%,  Average Future Daily Traffic: 4,441 (year 2033),  Design Load: HS 20,  Features Intersected: CHUBBEHATCHEE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.497,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.1m (23.3ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.1m (10.2ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.27m (4.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $756,000,  Roadway Improvement Cost: $76,000,  Total Project Cost: $832,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 16879,  Location: 7.9MI E OF AL 14 (Lat: 32.628731,  Lng: -86.089314),  Route carried "on" structure: State highway 170,  Year Built: 1998,  Status: Open,  Structure Length: 1.50m (4.92ft),  Average Daily Traffic: 3,640 (year 2013),  Truck Traffic: 7%,  Average Future Daily Traffic: 4,441 (year 2033),  Design Load: HS 20,  Features Intersected: SAND CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.143,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.4m (24.3ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.9m (16.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.18m (7.15ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $1,610,000,  Roadway Improvement Cost: $161,000,  Total Project Cost: $1,771,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 17364,  Location: 1.0 MI S OF CO RD 55 (Lat: 32.716667,  Lng: -86.066667),  Route carried "on" structure: County highway ,  Year Built: 1998,  Status: Open,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 30 (year 1998),  Average Future Daily Traffic: 60 (year 2030),  Design Load: HS 15,  Features Intersected: STEARNS CREEK,  Facility Carried by Structure: Lindsey Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 47.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.44m (8.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $419,000,  Roadway Improvement Cost: $42,000,  Total Project Cost: $461,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 20132,  Location: 4 MI NE OF AL 9 (Lat: 32.739722,  Lng: -86.063333),  Route carried "on" structure: County highway 55,  Year Built: 2008,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 100 (year 2007),  Average Future Daily Traffic: 300 (year 2032),  Design Load: HS 20,  Features Intersected: UNNAMED CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 74.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.71m (5.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $351,000,  Roadway Improvement Cost: $35,000,  Total Project Cost: $386,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 20621,  Location: ????????????????????????? (Lat: 32.671853,  Lng: -85.960022),  Route carried "on" structure: County highway 407,  Year Built: 1954,  Status: Open,  Structure Length: 3.47m (11.38ft),  Average Daily Traffic: 671 (year 2011),  Average Future Daily Traffic: 1,000 (year 2030),  Design Load: H 15,  Features Intersected: GOLD BRANCH,  Facility Carried by Structure: East Cotton Road
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 9.7m (31.8ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 40.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 4.38m (14.37ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $935,000,  Roadway Improvement Cost: $94,000,  Total Project Cost: $1,029,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 20915,  Location: SEC9 T20 R19 (Lat: 32.728569,  Lng: -86.180886),  Route carried "on" structure: County highway 465,  Year Built: 1988,  Status: Open,  Structure Length: 3.13m (10.27ft),  Average Daily Traffic: 100 (year 2014),  Average Future Daily Traffic: 125 (year 2031),  Design Load: HS 20,  Features Intersected: LITTLE WEOKA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.98m (13.06ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $874,000,  Roadway Improvement Cost: $87,000,  Total Project Cost: $961,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 21306,  Location: Sec9 T18N R17E (Lat: 32.556667,  Lng: -86.370000),  Route carried "on" structure: County highway 3,  Year Built: 2017,  Status: Open,  Structure Length: 1.77m (5.81ft),  Average Daily Traffic: 2,941 (year 2017),  Truck Traffic: 4%,  Average Future Daily Traffic: 4,370 (year 2037),  Design Load: HS 20,  Features Intersected: Middle Creek Spur,  Facility Carried by Structure: Ingram Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Very good,  Culverts: Excellent,  Operating Rating: 44.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.47m (8.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $828,000,  Roadway Improvement Cost: $83,000,  Total Project Cost: $911,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 21307,  Location: Sec9 T18N R17E (Lat: 32.556667,  Lng: -86.370000),  Route carried "on" structure: County highway 3,  Year Built: 2017,  Status: Open,  Structure Length: 1.77m (5.81ft),  Average Daily Traffic: 2,941 (year 2017),  Truck Traffic: 4%,  Average Future Daily Traffic: 4,370 (year 2037),  Design Load: HS 20,  Features Intersected: Middle Creek,  Facility Carried by Structure: Ingram Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Very good,  Culverts: Excellent,  Operating Rating: 67.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.47m (8.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $828,000,  Roadway Improvement Cost: $83,000,  Total Project Cost: $911,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 21494,  Location: SEC-20-T20N-R21E (Lat: 32.667300,  Lng: -86.023100),  Route carried "on" structure: County highway ,  Year Built: 1958,  Status: Open,  Structure Length: 2.93m (9.61ft),  Average Daily Traffic: 141 (year 2016),  Average Future Daily Traffic: 176 (year 2027),  Design Load: HS 20,  Features Intersected: Gold Branch,  Facility Carried by Structure: Landers Swink Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.8m (32.2ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 34.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.83m (12.57ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $708,000,  Roadway Improvement Cost: $71,000,  Total Project Cost: $779,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 21495,  Location: ????????????????????????? (Lat: 32.607750,  Lng: -86.028944),  Route carried "on" structure: County highway ,  Year Built: 1949,  Status: Open,  Structure Length: 0.61m (2.00ft),  Average Daily Traffic: 780 (year 2017),  Truck Traffic: 2%,  Average Future Daily Traffic: 951 (year 2027),  Design Load: H 20,  Features Intersected: Tumkeehatchee Creek,  Facility Carried by Structure: Fleahop Road
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 60.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.22m (4.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $253,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $278,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 21609,  Location: SEC 4 T18N R21E (Lat: 32.569300,  Lng: -85.969000),  Route carried "on" structure: County highway ,  Year Built: 2021,  Status: Open,  Structure Length: 2.01m (6.59ft),  Average Daily Traffic: 591 (year 2021),  Truck Traffic: 12%,  Average Future Daily Traffic: 878 (year 2041),  Design Load: HS 20,  Features Intersected: Wallahatchee Creek,  Facility Carried by Structure: CHEROKEE TRAIL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 4.9m (16.1ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Channel: Good,  Culverts: Excellent,  Operating Rating: 54.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.76m (9.06ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $671,000,  Roadway Improvement Cost: $67,000,  Total Project Cost: $738,000 ( Estimate for 2022)
Discuss Eclectic, Alabama (AL) on our hugely popular Alabama forum.