Bridge Statistics for Elmo, Missouri (MO)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 17Number of bridges
  • 125ft / 38.3mTotal length
  • $2,655,000Total costs
  • 1,682Total average daily traffic
  • 219Total average daily truck traffic
  • 2,146Total future (year 2041) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Elmo
  • No street view available for this location

New bridges in Elmo, MO - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 31930-1939
  • 21950-1959
  • 21960-1969
  • 21990-1999
  • 32000-2009
  • 42010-2019
Reconstructed bridges in Elmo, MO - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11970-1979
  • 21980-1989
  • 01990-1999
  • 12000-2009
Average Bridge Truck Traffic in Elmo, MO
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 18.2%Excellent
  • 45.5%Very good
  • 18.2%Good
  • 9.1%Satisfactory
  • 9.1%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 9.1%Excellent
  • 9.1%Very good
  • 54.5%Good
  • 9.1%Satisfactory
  • 18.2%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 9.1%Very good
  • 36.4%Good
  • 9.1%Satisfactory
  • 18.2%Fair
  • 18.2%Poor
  • 9.1%Imminent failure
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 29.4%Satisfactory
  • 35.3%Fair
  • 23.5%Poor
  • 5.9%Serious
  • 5.9%Critical
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 16.7%Good
  • 16.7%Satisfactory
  • 33.3%Fair
  • 16.7%Poor
  • 16.7%Serious
Find on map >>   Show street view

Structure Number: 1144,  Location: S 20 T 66 N R 37 W (Lat: 40.518467,  Lng: -95.122622),  Route carried "on" structure: State highway C,  Year Built: 1965,  Year Reconstructed: 2014,  Status: Open,  Structure Length: 6.19m (20.31ft),  Average Daily Traffic: 513 (year 2021),  Truck Traffic: 11%,  Average Future Daily Traffic: 667 (year 2041),  Design Load: H 15,  Features Intersected: MILL CR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 24.568,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.0m (29.5ft)

Condition: Deck: Very good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 31.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 18.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 12167,  Location: S 7 T 66 N R 37 W (Lat: 40.547461,  Lng: -95.140639),  Route carried "on" structure: County highway 10,  Year Built: 1995,  Status: Open,  Structure Length: 4.27m (14.01ft),  Average Daily Traffic: 10 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 12 (year 2041),  Design Load: HS 20,  Features Intersected: MILL CR,  Facility Carried by Structure: 120TH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.253,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.2m (46.6ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 81.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 45.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 12178,  Location: S 7 T 66 N R 37 W (Lat: 40.547467,  Lng: -95.134811),  Route carried "on" structure: County highway 18,  Year Built: 1997,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 5 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 6 (year 2041),  Features Intersected: MID MILL CR,  Facility Carried by Structure: 120TH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.5m (41.0ft),  Curb-To-Curb Width: 5.9m (19.4ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Poor,  Channel: Poor,  Operating Rating: 45.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 30.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.20m (0.66ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $149,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 12211,  Location: S 18 T 66 N R 37 W (Lat: 40.527439,  Lng: -95.135656),  Route carried "on" structure: County highway 25,  Year Built: 1920,  Year Reconstructed: 1983,  Status: Posted for load,  Structure Length: 2.83m (9.28ft),  Average Daily Traffic: 35 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 40 (year 2041),  Features Intersected: SMALL CR,  Facility Carried by Structure: BLUEBIRD TRAIL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.414,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 1,  Length of Maximum Span: 22.3m (73.2ft),  Curb-To-Curb Width: 5.9m (19.4ft),  Out-to-Out Width: 5.9m (19.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 18.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 8.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 0.37m (1.21ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $183,000,  Roadway Improvement Cost: $18,000,  Total Project Cost: $274,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 12252,  Location: S 29 T 66 N R 37 W (Lat: 40.492764,  Lng: -95.119944),  Route carried "on" structure: County highway 39,  Year Built: 1930,  Year Reconstructed: 1980,  Status: Open,  Structure Length: 3.96m (12.99ft),  Average Daily Traffic: 35 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 40 (year 2041),  Features Intersected: MILL CR,  Facility Carried by Structure: 160TH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.322,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 5.3m (17.4ft),  Out-to-Out Width: 5.5m (18.0ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 53.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 38.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.49m (1.61ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Critical Feature Inspection Date: December 2020,  Bridge Improvement Cost: $243,000,  Roadway Improvement Cost: $24,000,  Total Project Cost: $364,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 29819,  Location: S 16 T 66 N R 37 W (Lat: 40.522011,  Lng: -95.100589),  Route carried "on" structure: County highway 30,  Year Built: 2000,  Status: Open,  Structure Length: 2.13m (6.99ft),  Average Daily Traffic: 100 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 115 (year 2041),  Design Load: HS 20,  Features Intersected: MOSS CR,  Facility Carried by Structure: 140TH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Poor,  Channel: Poor,  Operating Rating: 63.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.29m (0.95ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $143,000,  Roadway Improvement Cost: $14,000,  Total Project Cost: $215,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 311,  Location: S 13 T 66 N R 38 W (Lat: 40.533225,  Lng: -95.154469),  Route carried "on" structure: County highway 25,  Year Built: 2005,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 20 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 23 (year 2041),  Design Load: HS 20,  Features Intersected: MILL CR,  Facility Carried by Structure: BLUEBIRD TRAIL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.805,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Poor,  Culverts: Fair,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020
Find on map >>   Show street view

Structure Number: 32593,  Location: S 9 T 66 N R 37 W (Lat: 40.540083,  Lng: -95.087861),  Route carried "on" structure: County highway 32,  Year Built: 2007,  Status: Closed,  Structure Length: 2.13m (6.99ft),  Average Daily Traffic: 10 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 12 (year 2041),  Design Load: HS 20,  Features Intersected: MASS BR,  Facility Carried by Structure: 125TH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.966,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.2m (69.6ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Imminent failure,  Channel: Critical,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 0.29m (0.95ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2018,  Bridge Improvement Cost: $211,000,  Roadway Improvement Cost: $21,000,  Total Project Cost: $316,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 33478,  Location: S 10 T 66 N R 37 W (Lat: 40.543611,  Lng: -95.086750),  Route carried "on" structure: County highway 13,  Year Built: 2010,  Status: Open,  Structure Length: 2.74m (8.99ft),  Average Daily Traffic: 15 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 17 (year 2041),  Design Load: HS 20,  Features Intersected: MASS BR,  Facility Carried by Structure: DANUBE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.575,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.0m (88.6ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 43.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 33865,  Location: S 16 T 66 N R 37 W (Lat: 40.529219,  Lng: -95.095492),  Route carried "on" structure: County highway 28,  Year Built: 2011,  Status: Open,  Structure Length: 2.74m (8.99ft),  Average Daily Traffic: 15 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 17 (year 2041),  Design Load: HS 20,  Features Intersected: MASS BR,  Facility Carried by Structure: 135TH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.1m (88.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 65.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 34488,  Location: S 14 T 66 N R 38 W (Lat: 40.534928,  Lng: -95.163889),  Route carried "on" structure: County highway 2,  Year Built: 2013,  Status: Open,  Structure Length: 2.44m (8.01ft),  Average Daily Traffic: 15 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 17 (year 2041),  Features Intersected: MILL CR,  Facility Carried by Structure: BURR OAK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.6m (77.4ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Excellent,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 74.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 35451,  Location: S 3 T 66 N R 37 W (Lat: 40.550839,  Lng: -95.082472),  Route carried "on" structure: County highway 16,  Year Built: 2016,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 5 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 6 (year 2041),  Design Load: HS 20,  Features Intersected: MASS BR,  Facility Carried by Structure: 120 ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.483,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 54.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 7824,  Location: S 29 T 66 N R 37 W (Lat: 40.495931,  Lng: -95.125908),  Route carried "on" structure: State highway KK,  Year Built: 1955,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 124 (year 2021),  Truck Traffic: 28%,  Average Future Daily Traffic: 161 (year 2041),  Design Load: H 10,  Features Intersected: SALEM CR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.020,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Channel: Serious,  Culverts: Serious,  Operating Rating: 36.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 21.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: High priority of corrective action,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.13m (0.43ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $250,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $375,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 7825,  Location: S 1 T 65 N R 38 W (Lat: 40.473692,  Lng: -95.120389),  Route carried "on" structure: State highway KK,  Year Built: 1955,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 124 (year 2021),  Truck Traffic: 28%,  Average Future Daily Traffic: 161 (year 2041),  Design Load: H 10,  Features Intersected: ADKINS CR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.730,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 45.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022
Find on map >>   Show street view

Structure Number: 8255,  Location: S 17 T 66 N R 37 W (Lat: 40.532672,  Lng: -95.121167),  Route carried "on" structure: State highway KK,  Year Built: 1962,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 144 (year 2021),  Truck Traffic: 11%,  Average Future Daily Traffic: 187 (year 2041),  Design Load: H 15,  Features Intersected: JERRY CR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.920,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 16.8m (55.1ft),  Out-to-Out Width: 17.4m (57.1ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 54.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022
Find on map >>   Show street view

Structure Number: 8941,  Location: S 20 T 66 N R 37 W (Lat: 40.511536,  Lng: -95.116428),  Route carried "on" structure: State highway C,  Year Built: 1932,  Year Reconstructed: 1994,  Status: Posted for load,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 374 (year 2021),  Truck Traffic: 11%,  Average Future Daily Traffic: 486 (year 2041),  Design Load: H 10,  Features Intersected: MOSS BR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.862,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.9m (39.0ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.4m (21.0ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 25.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 14.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 0.46m (1.51ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $471,000,  Roadway Improvement Cost: $47,000,  Total Project Cost: $707,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 932,  Location: S 24 T 66 N R 38 W (Lat: 40.522256,  Lng: -95.154828),  Route carried "on" structure: State highway C,  Year Built: 1936,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 138 (year 2021),  Truck Traffic: 12%,  Average Future Daily Traffic: 179 (year 2041),  Design Load: H 10,  Features Intersected: STEVENS CR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.678,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.2m (10.5ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Channel: Poor,  Culverts: Poor,  Operating Rating: 43.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.13m (0.43ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $170,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $255,000 ( Estimate for 2022)