Bridge Statistics for Fairburn, Georgia (GA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 35Number of bridges
  • 338ft / 103mTotal length
  • $31,733,000Total costs
  • 817,312Total average daily traffic
  • 8,912Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Fairburn
  • No street view available for this location

New bridges in Fairburn, GA - historical statistics
  • New bridges - historical statistics
  • 51950-1959
  • 71960-1969
  • 21970-1979
  • 41980-1989
  • 11990-1999
  • 22000-2009
  • 12010-2019
Reconstructed bridges in Fairburn, GA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21970-1979
  • 11980-1989
  • 11990-1999
Average Bridge Daily Traffic in Fairburn, GA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 15.8%Very good
  • 57.9%Good
  • 26.3%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 36.8%Very good
  • 57.9%Good
  • 5.3%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 5.3%Very good
  • 68.4%Good
  • 21.1%Satisfactory
  • 5.3%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 9.1%Very good
  • 54.5%Good
  • 27.3%Satisfactory
  • 9.1%Fair
Find on map >>   Show street view

Structure Number: 770064,  Location: 3 MI SE OF PALMETTO (Lat: 33.494908,  Lng: -84.622039),  Route carried "on" structure: County highway 846,  Year Built: 1987,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 6,490 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 9,735 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: PEEKS CREEK,  Facility Carried by Structure: COLLINSWORTH ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.7m (8.9ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $113,000,  Roadway Improvement Cost: $11,000,  Total Project Cost: $170,000
Find on map >>   Show street view

Structure Number: 1135004,  Location: 3 MI NE OF TYRONE (Lat: 33.527119,  Lng: -84.556628),  Route carried "on" structure: County highway 59,  Year Built: 1960,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 2,202 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,303 (year 2031),  Design Load: H 15,  Features Intersected: WHITEWATER CREEK,  Facility Carried by Structure: MILAM ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.828,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: May 2020,  Underwater Inspection Date: April 2019,  Bridge Improvement Cost: $129,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $193,000
Find on map >>   Show street view

Structure Number: 1210041,  Location: IN THE CITY OF FAIRBURN (Lat: 33.557400,  Lng: -84.591989),  Route carried "on" structure: US 29,  Year Built: 1981,  Status: Open,  Structure Length: 4.45m (14.60ft),  Average Daily Traffic: 10,010 (year 2011),  Truck Traffic: 8%,  Average Future Daily Traffic: 15,015 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: SR 74
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.656,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 22.9m (75.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 18.1m (59.4ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 46.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $882,000,  Roadway Improvement Cost: $88,000,  Total Project Cost: $1,322,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1210069,  Location: 1.5 M S OF FAIRBURN (Lat: 33.546003,  Lng: -84.577561),  Route carried "on" structure: State highway 74,  Year Built: 1965,  Year Reconstructed: 1987,  Status: Open,  Structure Length: 8.47m (27.79ft),  Average Daily Traffic: 19,920 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 29,880 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: I-85
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 11 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 23.2m (76.1ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 36.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $1,086,000,  Roadway Improvement Cost: $109,000,  Total Project Cost: $1,629,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1210071,  Location: 1.3 S OF FAIRBURN (Lat: 33.549831,  Lng: -84.568703),  Route carried "on" structure: State highway 92,  Year Built: 1965,  Status: Open,  Structure Length: 8.17m (26.80ft),  Average Daily Traffic: 5,490 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 8,235 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: I-85,  Facility Carried by Structure: SPENCE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.828,  Lanes on structure: 2,  Lanes under structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 21.6m (70.9ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 39.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $1,047,000,  Roadway Improvement Cost: $105,000,  Total Project Cost: $1,571,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1210263,  Location: 2 MILES SW OF FAIRBURN (Lat: 33.539128,  Lng: -84.591489),  Route carried "on" structure: County highway 627,  Year Built: 1965,  Status: Open,  Structure Length: 8.53m (27.99ft),  Average Daily Traffic: 490 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 735 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: I-85,  Facility Carried by Structure: BOHANNON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Lanes under structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 22.9m (75.1ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 46.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $1,094,000,  Roadway Improvement Cost: $109,000,  Total Project Cost: $1,641,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1210264,  Location: IN FAIRBURN (Lat: 33.557161,  Lng: -84.591606),  Route carried "on" structure: County highway 633,  Year Built: 1981,  Status: Open,  Structure Length: 4.69m (15.39ft),  Average Daily Traffic: 1,940 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,910 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: SR 74,  Facility Carried by Structure: BOHANNON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 22.9m (75.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 46.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $602,000,  Roadway Improvement Cost: $60,000,  Total Project Cost: $903,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1210265,  Location: 4 MI SW OF FAIRBURN (Lat: 33.520261,  Lng: -84.624672),  Route carried "on" structure: County highway 629,  Year Built: 1966,  Status: Open,  Structure Length: 11.89m (39.01ft),  Average Daily Traffic: 620 (year 2010),  Truck Traffic: 1%,  Average Future Daily Traffic: 930 (year 2030),  Design Load: HS 20+Mod,  Features Intersected: I-85,  Facility Carried by Structure: JOHNSON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Lanes under structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 33.2m (108.9ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 46.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 18.32m (60.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $1,524,000,  Roadway Improvement Cost: $152,000,  Total Project Cost: $2,286,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1210266,  Location: 3.5 MI SW OF FAIRBURN (Lat: 33.526808,  Lng: -84.614389),  Route carried "on" structure: County highway 634,  Year Built: 1966,  Status: Open,  Structure Length: 8.96m (29.40ft),  Average Daily Traffic: 490 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 735 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: I-85,  Facility Carried by Structure: GULLATT ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Lanes under structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 24.1m (79.1ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 46.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 49.29m (161.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $1,149,000,  Roadway Improvement Cost: $115,000,  Total Project Cost: $1,723,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1210267,  Location: 0.1 MI W OF FAIRBURN (Lat: 33.575475,  Lng: -84.599656),  Route carried "on" structure: County highway 9378,  Year Built: 1950,  Year Reconstructed: 1977,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 5,120 (year 2011),  Truck Traffic: 2%,  Average Future Daily Traffic: 7,680 (year 2031),  Design Load: HS 15,  Features Intersected: LINE CREEK,  Facility Carried by Structure: RIVERTOWN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb or Sidewalk Widths: Left: 0.9m (3.0ft),  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 10.9m (35.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 34.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.38m (24.21ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $121,000,  Roadway Improvement Cost: $12,000,  Total Project Cost: $182,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1210268,  Location: 1 MI W OF FAIRBURN (Lat: 33.570181,  Lng: -84.589742),  Route carried "on" structure: County highway 9378,  Year Built: 1950,  Year Reconstructed: 1977,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 3,950 (year 2007),  Truck Traffic: 1%,  Average Future Daily Traffic: 5,925 (year 2030),  Design Load: HS 15,  Features Intersected: KING BRANCH,  Facility Carried by Structure: RIVERTOWN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb or Sidewalk Widths: Left: 0.9m (3.0ft),  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.9m (35.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 34.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.35m (24.11ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $117,000,  Roadway Improvement Cost: $12,000,  Total Project Cost: $176,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1210269,  Location: 1.7 M SE OF FAIRBURN (Lat: 33.556369,  Lng: -84.554100),  Route carried "on" structure: City street 9379,  Year Built: 1965,  Status: Open,  Structure Length: 10.52m (34.51ft),  Average Daily Traffic: 1,760 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,640 (year 2032),  Design Load: HS 15,  Features Intersected: I-85,  Facility Carried by Structure: FAYETTEVILLE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Lanes under structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 29.3m (96.1ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 46.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 50.75m (166.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $1,348,000,  Roadway Improvement Cost: $135,000,  Total Project Cost: $2,022,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1210645,  Location: 1.5 M S OF FAIRBURN (Lat: 33.546100,  Lng: -84.577292),  Route carried "on" structure: State highway 74,  Year Built: 1987,  Status: Open,  Structure Length: 8.56m (28.08ft),  Average Daily Traffic: 19,920 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 29,880 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: I-85
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Skew: 11 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 23.8m (78.1ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $1,098,000,  Roadway Improvement Cost: $110,000,  Total Project Cost: $1,647,000,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1215079,  Location: 2 MI SE OF FAIRBURN (Lat: 33.539414,  Lng: -84.564306),  Route carried "on" structure: County highway 621,  Year Built: 1957,  Status: Posted for load,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 1,940 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,910 (year 2031),  Design Load: H 15,  Features Intersected: WHITE WATER CREEK TRIB,  Facility Carried by Structure: HARRIS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 20.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 11.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 41.15m (135.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $117,000,  Roadway Improvement Cost: $12,000,  Total Project Cost: $176,000,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 1215082,  Location: 4 MI SW OF FAIRBURN (Lat: 33.520339,  Lng: -84.617408),  Route carried "on" structure: County highway 629,  Year Built: 1955,  Status: Posted for load,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 490 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 735 (year 2032),  Features Intersected: SHOAL CREEK,  Facility Carried by Structure: JOHNSON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.6m (15.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.2m (23.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Poor,  Channel: Good,  Operating Rating: 9.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 5.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: High priority of replacement,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 7.35m (24.11ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Other Special Inspection Date: October 2021,  Bridge Improvement Cost: $117,000,  Roadway Improvement Cost: $12,000,  Total Project Cost: $176,000,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1215084,  Location: 3 MI SW OF FAIRBURN (Lat: 33.554739,  Lng: -84.625358),  Route carried "on" structure: County highway 642,  Year Built: 1959,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 1,940 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,910 (year 2031),  Design Load: H 15,  Features Intersected: BEAR CREEK,  Facility Carried by Structure: HERNDON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 9.1m (29.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 9.3m (30.5ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 37.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 20.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.26m (27.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $234,000,  Roadway Improvement Cost: $23,000,  Total Project Cost: $352,000,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1215111,  Location: 5 MI NW OF PALMETTO (Lat: 33.545617,  Lng: -84.751497),  Route carried "on" structure: County highway 1390,  Year Built: 1972,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 540 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 810 (year 2031),  Design Load: H 15,  Features Intersected: LONGINO CREEK,  Facility Carried by Structure: RICO ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.437,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 9.1m (29.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 6.9m (22.6ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 36.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.32m (27.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $234,000,  Roadway Improvement Cost: $23,000,  Total Project Cost: $352,000,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1215117,  Location: 3 MI SE OF FAIRBURN (Lat: 33.556569,  Lng: -84.535686),  Route carried "on" structure: County highway 1505,  Year Built: 1971,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 5,350 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 8,025 (year 2031),  Design Load: H 15,  Features Intersected: BROADANAX CREEK,  Facility Carried by Structure: OAKLEY IND BLVD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $98,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $147,000
Find on map >>   Show street view

Structure Number: 1215275,  Location: 2 MI SW OF FAIRBURN (Lat: 33.536869,  Lng: -84.602039),  Route carried "on" structure: County highway 635,  Year Built: 1996,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 1,940 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,910 (year 2031),  Design Load: HS 15,  Features Intersected: BORUM SPRINGS C,  Facility Carried by Structure: CREEKWOOD ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 9.1m (29.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 6.9m (22.6ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 36.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $234,000,  Roadway Improvement Cost: $23,000,  Total Project Cost: $352,000,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1215342,  Location: 2 MILES FROM FAIRBURN (Lat: 33.550653,  Lng: -84.548194),  Route carried "on" structure: County highway 11111,  Year Built: 2002,  Status: Open,  Structure Length: 5.18m (16.99ft),  Average Daily Traffic: 1,760 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,640 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: CSX RAILROAD,  Facility Carried by Structure: FAYETTEVILLE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.0m (59.1ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 58.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $664,000,  Roadway Improvement Cost: $66,000,  Total Project Cost: $996,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1215345,  Location: 2 MI OF FAIRBURN (Lat: 33.550586,  Lng: -84.545958),  Route carried "on" structure: County highway 4187,  Year Built: 2006,  Status: Open,  Structure Length: 8.99m (29.49ft),  Average Daily Traffic: 200 (year 2008),  Truck Traffic: 2%,  Average Future Daily Traffic: 3,000 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: CSX RAILROAD,  Facility Carried by Structure: OAKLEY INDUSTRIAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.828,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 5 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 42.4m (139.1ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 20.1m (65.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 16.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $1,153,000,  Roadway Improvement Cost: $115,000,  Total Project Cost: $1,729,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1215366,  Location: FULTON-FAYETTE CO LINE (Lat: 33.518119,  Lng: -84.595797),  Route carried "on" structure: County highway 629,  Year Built: 2016,  Status: Open,  Structure Length: 2.74m (8.99ft),  Average Daily Traffic: 490 (year 2015),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,069 (year 2035),  Design Load: HS 20+Mod,  Features Intersected: LINE CREEK,  Facility Carried by Structure: JOHNSON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 12.4m (40.7ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 59.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.29m (10.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $7,992,000,  Roadway Improvement Cost: $799,000,  Total Project Cost: $11,988,000 ( Estimate for 2017),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1210041,  Location: IN THE CITY OF FAIRBURN (Lat: 33.557400,  Lng: -84.591989),  Route carried "under" structure: State highway 74,  Structure Length: 0. m,  Average Daily Traffic: 10,300 (year 1999),  Truck Traffic: 1%,  Features Intersected: SR 14 (US 29),  Facility Carried by Structure: US 29 / SR. 14
Minimum Vertical Clearance: 5.68m (18.64ft),  Kilometerpoint: 4.828,  Lanes on structure: 4,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 1210069,  Location: 1.5 M S OF FAIRBURN (Lat: 33.546003,  Lng: -84.577561),  Route carried "under" structure: Interstate 85,  Structure Length: 0. m,  Average Daily Traffic: 59,180 (year 1999),  Truck Traffic: 1%,  Features Intersected: SR 74 WBL,  Facility Carried by Structure: SR 74 EBL
Minimum Vertical Clearance: 5.23m (17.16ft),  Kilometerpoint: 98.170,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 1210071,  Location: 1.3 S OF FAIRBURN (Lat: 33.549831,  Lng: -84.568703),  Route carried "under" structure: Interstate 85,  Structure Length: 0. m,  Average Daily Traffic: 104,300 (year 1999),  Truck Traffic: 1%,  Features Intersected: SR 92 SPENCE ROAD,  Facility Carried by Structure: SPENCE ROAD
Minimum Vertical Clearance: 5.35m (17.55ft),  Kilometerpoint: 99.779,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 1210263,  Location: 2 MILES SW OF FAIRBURN (Lat: 33.539128,  Lng: -84.591489),  Route carried "under" structure: Interstate 85,  Structure Length: 0. m,  Average Daily Traffic: 70,000 (year 1999),  Truck Traffic: 1%,  Features Intersected: CR 627 BOHANNON ROAD,  Facility Carried by Structure: BOHANNON ROAD
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 96.561,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 1210264,  Location: IN FAIRBURN (Lat: 33.557161,  Lng: -84.591606),  Route carried "under" structure: State highway 74,  Structure Length: 0. m,  Average Daily Traffic: 10,300 (year 1999),  Truck Traffic: 1%,  Features Intersected: CR 633 BOHANNON ROAD,  Facility Carried by Structure: BOHANNON ROAD
Minimum Vertical Clearance: 5.86m (19.23ft),  Kilometerpoint: 4.828,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 1210265,  Location: 4 MI SW OF FAIRBURN (Lat: 33.520261,  Lng: -84.624672),  Route carried "under" structure: Interstate 85,  Structure Length: 0. m,  Average Daily Traffic: 70,000 (year 1999),  Truck Traffic: 1%,  Features Intersected: CR 629 JOHNSTON ROAD,  Facility Carried by Structure: JOHNSON ROAD
Minimum Vertical Clearance: 5.58m (18.31ft),  Kilometerpoint: 93.342,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 1210266,  Location: 3.5 MI SW OF FAIRBURN (Lat: 33.526808,  Lng: -84.614389),  Route carried "under" structure: Interstate 85,  Structure Length: 0. m,  Average Daily Traffic: 70,000 (year 1999),  Truck Traffic: 1%,  Features Intersected: CR 634 GULLATT ROAD,  Facility Carried by Structure: GULLATT ROAD
Minimum Vertical Clearance: 5.56m (18.24ft),  Kilometerpoint: 94.951,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 1210269,  Location: 1.7 M SE OF FAIRBURN (Lat: 33.556369,  Lng: -84.554100),  Route carried "under" structure: Interstate 85,  Structure Length: 0. m,  Average Daily Traffic: 104,300 (year 1999),  Truck Traffic: 1%,  Features Intersected: M-9379 FAYETTEVILLE RD,  Facility Carried by Structure: FAYETTEVILLE RD
Minimum Vertical Clearance: 5.76m (18.90ft),  Kilometerpoint: 101.389,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 1210485,  Location: 1.9 M SE OF FAIRBURN (Lat: 33.558039,  Lng: -84.549789),  Route carried "under" structure: Interstate 85,  Structure Length: 0. m,  Average Daily Traffic: 108,290 (year 2011),  Truck Traffic: 1%,  Features Intersected: I-85,  Facility Carried by Structure: CSX RAILROAD
Minimum Vertical Clearance: 5.13m (16.83ft),  Kilometerpoint: 101.389,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 1210502,  Location: IN THE CITY OF FAIRBURN (Lat: 33.566489,  Lng: -84.581128),  Route carried "under" structure: State highway 92,  Structure Length: 0. m,  Average Daily Traffic: 4,660 (year 2011),  Truck Traffic: 1%,  Features Intersected: SR 92 E. CAMPBELLTON ST.,  Facility Carried by Structure: CSX RAILROAD
Minimum Vertical Clearance: 3.12m (10.24ft),  Kilometerpoint: 6.437,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 121054,  Location: IN CITY OF FAIRBURN (Lat: 33.557297,  Lng: -84.591728),  Route carried "under" structure: State highway 74,  Structure Length: 0. m,  Average Daily Traffic: 11,440 (year 2011),  Truck Traffic: 1%,  Features Intersected: SR 74 SENOIA ROAD,  Facility Carried by Structure: CSX RAILROAD
Minimum Vertical Clearance: 5.46m (17.91ft),  Kilometerpoint: 4.828,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 1210545,  Location: 1 MI NE OF FAIRBURN (Lat: 33.574047,  Lng: -84.566158),  Route carried "under" structure: State highway 138,  Structure Length: 0. m,  Average Daily Traffic: 21,390 (year 2011),  Truck Traffic: 1%,  Features Intersected: SR 138,  Facility Carried by Structure: CSX RAILROAD
Minimum Vertical Clearance: 5.13m (16.83ft),  Kilometerpoint: 3.219,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 1210645,  Location: 1.5 M S OF FAIRBURN (Lat: 33.546100,  Lng: -84.577292),  Route carried "under" structure: Interstate 85,  Structure Length: 0. m,  Average Daily Traffic: 80,100 (year 1999),  Truck Traffic: 1%,  Features Intersected: SR 74 EBL,  Facility Carried by Structure: SR 74 WBL
Minimum Vertical Clearance: 5.13m (16.83ft),  Kilometerpoint: 98.170,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Discuss Fairburn, Georgia (GA) on our hugely popular Georgia forum.