Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Forkland, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 18Number of bridges
  • 148ft / 44.8mTotal length
  • $21,235,000Total costs
  • 61,158Total average daily traffic
  • 7,575Total average daily truck traffic
  • 84,446Total future (year 2031) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Forkland
  • No street view available for this location

New bridges in Forkland, AL - historical statistics
  • New bridges - historical statistics
  • 41930-1939
  • 11940-1949
  • 21950-1959
  • 41970-1979
  • 11990-1999
  • 32000-2009
  • 32010-2019
Average Bridge Daily Traffic in Forkland, AL
Average Bridge Truck Traffic in Forkland, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 25.0%Excellent
  • 12.5%Very good
  • 25.0%Good
  • 37.5%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 37.5%Excellent
  • 25.0%Good
  • 25.0%Fair
  • 12.5%Serious
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 37.5%Excellent
  • 12.5%Good
  • 50.0%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 25.0%Very good
  • 18.8%Good
  • 50.0%Satisfactory
  • 6.3%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 20.0%Excellent
  • 10.0%Good
  • 60.0%Satisfactory
  • 10.0%Fair
Find on map >>   Show street view

Structure Number: 762,  Location: 0.5 MI W HWY 43 (Lat: 32.645000,  Lng: -87.878333),  Route carried "on" structure: County highway 19,  Year Built: 1930,  Status: Posted for load,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 572 (year 1995),  Truck Traffic: 55%,  Average Future Daily Traffic: 660 (year 2031),  Features Intersected: CREEK,  Facility Carried by Structure: CO RD 20
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.4m (11.2ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 13.6 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 10.0 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: April 2020,  Other Special Inspection Date: May 2021,  Bridge Improvement Cost: $165,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $182,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 3159,  Location: 2.5 MI S FORKLAND (Lat: 32.630817,  Lng: -87.848467),  Route carried "on" structure: US 43,  Year Built: 1931,  Year Reconstructed: 1948,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 3,740 (year 2013),  Truck Traffic: 13%,  Average Future Daily Traffic: 4,804 (year 2040),  Design Load: H 15,  Features Intersected: 12 Mile Bend Slough
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 232.647,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 52.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.26m (4.13ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $364,000,  Roadway Improvement Cost: $36,000,  Total Project Cost: $400,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 316,  Location: 1.5 MI S FORKLAND (Lat: 32.638483,  Lng: -87.859767),  Route carried "on" structure: US 43,  Year Built: 1931,  Year Reconstructed: 1948,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 3,740 (year 2013),  Truck Traffic: 13%,  Average Future Daily Traffic: 4,804 (year 2040),  Design Load: H 15,  Features Intersected: 12 Mile Bend Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 234.028,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.4m (11.2ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 81.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.38m (4.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $421,000,  Roadway Improvement Cost: $42,000,  Total Project Cost: $463,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 3161,  Location: 2.0 MI N FORKLAND (Lat: 32.679450,  Lng: -87.899433),  Route carried "on" structure: US 43,  Year Built: 1931,  Year Reconstructed: 1948,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 2,930 (year 2016),  Truck Traffic: 17%,  Average Future Daily Traffic: 3,764 (year 2040),  Design Load: H 15,  Features Intersected: UT to Needham Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 240.166,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.2m (10.5ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 79.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.64m (5.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $503,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $553,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 3205,  Location: FORKLAND (Lat: 32.649750,  Lng: -87.879550),  Route carried "on" structure: US 43,  Year Built: 1948,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 3,740 (year 2013),  Truck Traffic: 13%,  Average Future Daily Traffic: 4,804 (year 2040),  Design Load: H 15,  Features Intersected: Taylor Branch
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 236.303,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 67.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.26m (4.13ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $393,000,  Roadway Improvement Cost: $39,000,  Total Project Cost: $432,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 5106,  Location: 2.5 MI W FORKLAND (Lat: 32.640000,  Lng: -87.923333),  Route carried "on" structure: County highway 4,  Year Built: 1955,  Status: Closed,  Structure Length: 4.63m (15.19ft),  Average Daily Traffic: 262 (year 1995),  Truck Traffic: 25%,  Average Future Daily Traffic: 300 (year 2031),  Design Load: H 15,  Features Intersected: MCCONNICO CREEK,  Facility Carried by Structure: CO RD 69
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Satisfactory,  Superstructure: Serious,  Substructure: Fair,  Channel: Satisfactory,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 5.63m (18.47ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 1 months,  Inspection Date: July 2017,  Other Special Inspection Date: April 2018,  Bridge Improvement Cost: $926,000,  Roadway Improvement Cost: $93,000,  Total Project Cost: $1,019,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 5107,  Location: 2.2 MI W FORKLAND (Lat: 32.643333,  Lng: -87.920000),  Route carried "on" structure: County highway 4,  Year Built: 1955,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 241 (year 1995),  Truck Traffic: 23%,  Average Future Daily Traffic: 276 (year 2031),  Design Load: H 15,  Features Intersected: MCCONNICO CK RELIEF,  Facility Carried by Structure: CO RD 69
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Fair,  Operating Rating: 56.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.84m (6.04ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $302,000,  Roadway Improvement Cost: $30,000,  Total Project Cost: $332,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 10255,  Location: 0.2 MI S JCT SR144 (Lat: 33.766600,  Lng: -85.892297),  Route carried "on" structure: US 431,  Year Built: 1970,  Status: Open,  Structure Length: 0.63m (2.07ft),  Average Daily Traffic: 21,879 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 30,631 (year 2039),  Design Load: HS 20,  Features Intersected: BATTLE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 386.017,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 22.7m (74.5ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.24m (4.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $897,000,  Roadway Improvement Cost: $90,000,  Total Project Cost: $987,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 10257,  Location: 1.5 MI W ARONEY T9SR5E (Lat: 34.215011,  Lng: -86.101719),  Route carried "on" structure: County highway 1,  Year Built: 1970,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 162 (year 2020),  Truck Traffic: 22%,  Average Future Daily Traffic: 241 (year 2040),  Design Load: H 10,  Features Intersected: BURNS BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 6.8m (22.3ft),  Out-to-Out Width: 7.2m (23.6ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 67.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 45.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: High priority of replacement,  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $240,000,  Roadway Improvement Cost: $24,000,  Total Project Cost: $264,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10667,  Location: WEST TUNNEL INTERCHANGE (Lat: 30.686450,  Lng: -88.039881),  Route carried "on" structure: Ramp Interstate 10,  Year Built: 1972,  Status: Open,  Structure Length: 12.83m (42.09ft),  Average Daily Traffic: 15,780 (year 2018),  Truck Traffic: 15%,  Average Future Daily Traffic: 23,670 (year 2038),  Design Load: HS 20,  Features Intersected: ROYAL ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 42.931,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 26.2m (86.0ft),  Curb-To-Curb Width: 15.6m (51.2ft),  Out-to-Out Width: 16.9m (55.4ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 49.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 13.66m (44.82ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $5,152,000,  Roadway Improvement Cost: $515,000,  Total Project Cost: $5,667,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 12012,  Location: 2.8 MI. W. OF GREENSBORO (Lat: 32.693333,  Lng: -87.808333),  Route carried "on" structure: County highway 24,  Year Built: 1978,  Status: Open,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 200 (year 1989),  Truck Traffic: 1%,  Average Future Daily Traffic: 400 (year 2033),  Design Load: H 15,  Features Intersected: BIG GERMAN CREEK TRIB.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.0m (13.1ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 73.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.92m (6.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $400,000,  Roadway Improvement Cost: $40,000,  Total Project Cost: $440,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 15191,  Location: 0.3 MI N CO RD 4 (Lat: 32.675000,  Lng: -87.855000),  Route carried "on" structure: County highway 49,  Year Built: 1990,  Status: Open,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 73 (year 1995),  Average Future Daily Traffic: 84 (year 2034),  Design Load: H 10,  Features Intersected: SO NEEDHAM CREEK,  Facility Carried by Structure: CO RD 28
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 55.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 2.14m (7.02ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $366,000,  Roadway Improvement Cost: $37,000,  Total Project Cost: $403,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 17996,  Location: 0.2 MI N CO RD 41 (Lat: 32.671667,  Lng: -87.835000),  Route carried "on" structure: County highway 503,  Year Built: 2002,  Status: Open,  Structure Length: 2.93m (9.61ft),  Average Daily Traffic: 350 (year 1900),  Truck Traffic: 10%,  Average Future Daily Traffic: 400 (year 2034),  Design Load: HS 20,  Features Intersected: SOUTH NEEDHAM CREEK,  Facility Carried by Structure: CO RD 25
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Very good,  Operating Rating: 58.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 3.83m (12.57ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $736,000,  Roadway Improvement Cost: $74,000,  Total Project Cost: $810,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 18846,  Location: 0.5 MI W FORKLAND (Lat: 32.643333,  Lng: -87.891667),  Route carried "on" structure: County highway 4,  Year Built: 2003,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 369 (year 2002),  Average Future Daily Traffic: 500 (year 2034),  Design Load: HS 20,  Features Intersected: COBB BRANCH,  Facility Carried by Structure: COUNTY ROAD 69
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Excellent,  Operating Rating: 65.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.59m (5.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $824,000,  Roadway Improvement Cost: $82,000,  Total Project Cost: $906,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 18847,  Location: 1.8 MI NE FORKLAND (Lat: 32.668333,  Lng: -87.858333),  Route carried "on" structure: County highway 4,  Year Built: 2003,  Status: Open,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 400 (year 2002),  Truck Traffic: 3%,  Average Future Daily Traffic: 440 (year 2031),  Design Load: HS 20,  Features Intersected: SOUTH NEEDHAM CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Very good,  Culverts: Excellent,  Operating Rating: 65.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.14m (7.02ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $2,374,000,  Roadway Improvement Cost: $237,000,  Total Project Cost: $2,611,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 19066,  Location: 4.4 MI S FORKLAND (Lat: 32.607189,  Lng: -87.832931),  Route carried "on" structure: US 43,  Year Built: 2010,  Status: Open,  Structure Length: 7.92m (25.98ft),  Average Daily Traffic: 3,740 (year 2013),  Truck Traffic: 13%,  Average Future Daily Traffic: 4,804 (year 2033),  Design Load: HS 20,  Features Intersected: Al Gulf Coast RR Active
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 229.562,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 5 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 13.6m (44.6ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Excellent,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 8.94m (29.33ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $2,818,000,  Roadway Improvement Cost: $282,000,  Total Project Cost: $3,100,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 20082,  Location: 0.7 MI E LLOYD CHAPEL RD (Lat: 32.668333,  Lng: -87.813333),  Route carried "on" structure: County highway 65,  Year Built: 2010,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 50 (year 2010),  Average Future Daily Traffic: 100 (year 2033),  Design Load: HS 20,  Features Intersected: SOUTH NEEDHAM CREEK,  Facility Carried by Structure: CO RD 25
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Very good,  Operating Rating: 74.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $652,000,  Roadway Improvement Cost: $65,000,  Total Project Cost: $717,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 20468,  Location: 4.0 MI N OF FORKLAND (Lat: 32.698600,  Lng: -87.903200),  Route carried "on" structure: US 43,  Year Built: 2015,  Status: Open,  Structure Length: 2.01m (6.59ft),  Average Daily Traffic: 2,930 (year 2016),  Truck Traffic: 17%,  Average Future Daily Traffic: 3,764 (year 2040),  Design Load: HS 20,  Features Intersected: NEEDHAM CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 242.311,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.4m (40.7ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 4.9m (16.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 84.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.76m (9.06ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $1,772,000,  Roadway Improvement Cost: $177,000,  Total Project Cost: $1,949,000 ( Estimate for 2022)
Discuss Forkland, Alabama (AL) on our hugely popular Alabama forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.