  • National Bridge Inventory (NBI) Statistics
  • 13Number of bridges
  • 98ft / 29.9mTotal length
  • $17,814,000Total costs
  • 22,029Total average daily traffic
  • 1,738Total average daily truck traffic
  • 24,947Total future (year 2022) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Freeville
  • No street view available for this location

New bridges in Freeville, NY - historical statistics
  • New bridges - historical statistics
  • 21910-1919
  • 21930-1939
  • 31960-1969
  • 21980-1989
  • 11990-1999
  • 22010-2019
  • 12020-2022
Reconstructed bridges in Freeville, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11950-1959
  • 01960-1969
  • 01970-1979
  • 01980-1989
  • 21990-1999
  • 02000-2009
  • 12010-2019
Average Bridge Daily Traffic in Freeville, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 25.0%Excellent
  • 25.0%Very good
  • 37.5%Satisfactory
  • 12.5%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 25.0%Excellent
  • 12.5%Very good
  • 12.5%Good
  • 25.0%Fair
  • 25.0%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 25.0%Excellent
  • 12.5%Very good
  • 50.0%Satisfactory
  • 12.5%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 15.4%Very good
  • 23.1%Good
  • 23.1%Satisfactory
  • 30.8%Fair
  • 7.7%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 20.0%Very good
  • 60.0%Good
  • 20.0%Satisfactory
Find on map >>   Show street view

Structure Number: 102419,  Location: JCT OF RTS 38 + 366 (Lat: 42.514208,  Lng: -76.347172),  Route carried "on" structure: State highway 38,  Year Built: 2019,  Status: Open,  Structure Length: 2.41m (7.91ft),  Average Daily Traffic: 2,669 (year 2018),  Truck Traffic: 11%,  Average Future Daily Traffic: 2,685 (year 2040),  Design Load: HS 20,  Features Intersected: FALL CREEK
Minimum Vertical Clearance: 32.69m (107.25ft),  Kilometerpoint: 13.033,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 6 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.9m (75.1ft),  Curb or Sidewalk Widths: Left: 2.1m (6.9ft),  Right: 2.1m (6.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 15.0m (49.2ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.40m (7.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $1,723,000,  Roadway Improvement Cost: $1,009,000,  Total Project Cost: $2,732,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 104678,  Location: 1.6 MI NE JCT RTS 366 +13 (Lat: 42.495397,  Lng: -76.371378),  Route carried "on" structure: State highway 366,  Year Built: 1932,  Year Reconstructed: 1995,  Status: Posted for load-capacity,  Structure Length: 3.81m (12.50ft),  Average Daily Traffic: 2,639 (year 2019),  Truck Traffic: 11%,  Average Future Daily Traffic: 3,205 (year 2040),  Design Load: HS 20,  Features Intersected: FALL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.100,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 36.5m (119.8ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 0.0m,  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 81.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.81m (12.50ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Critical Feature Inspection Date: October 2020,  Bridge Improvement Cost: $2,875,000,  Roadway Improvement Cost: $1,684,000,  Total Project Cost: $4,559,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 104679,  Location: 2.5 MI NE JCT SH 366 & SH (Lat: 42.504589,  Lng: -76.359914),  Route carried "on" structure: State highway 366,  Year Built: 1932,  Year Reconstructed: 1995,  Status: Open,  Structure Length: 2.44m (8.01ft),  Average Daily Traffic: 2,639 (year 2019),  Truck Traffic: 11%,  Average Future Daily Traffic: 2,655 (year 2040),  Design Load: HS 20,  Features Intersected: FALL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.564,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.8m (74.8ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 0.0m,  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 57.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.43m (7.97ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Critical Feature Inspection Date: October 2020,  Bridge Improvement Cost: $727,000,  Roadway Improvement Cost: $426,000,  Total Project Cost: $1,153,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 320978,  Location: 1.6 MI SW OF MCLEAN (Lat: 42.533914,  Lng: -76.310625),  Route carried "on" structure: County highway ,  Year Built: 1915,  Year Reconstructed: 2017,  Status: Posted for load,  Structure Length: 2.07m (6.79ft),  Average Daily Traffic: 213 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 298 (year 2037),  Features Intersected: FALL CREEK,  Facility Carried by Structure: W MALLORYVILLE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.338,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.5m (64.0ft),  Curb-To-Curb Width: 4.4m (14.4ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Excellent,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 21.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 12.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.07m (6.79ft),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 12 months,  Inspection Date: April 2021,  Critical Feature Inspection Date: April 2021,  Bridge Improvement Cost: $769,000,  Roadway Improvement Cost: $450,000,  Total Project Cost: $1,219,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 320979,  Location: 1.5 MILES NE OF FREEVILLE (Lat: 42.527736,  Lng: -76.321894),  Route carried "on" structure: Other road ,  Year Built: 2017,  Status: Open,  Structure Length: 3.72m (12.20ft),  Truck Traffic: 8%,  Features Intersected: FALL CREEK,  Facility Carried by Structure: RED MILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.368,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 36.6m (120.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 83.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.71m (12.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $780,000,  Roadway Improvement Cost: $457,000,  Total Project Cost: $1,236,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 320983,  Location: 1.6 MILES NW OF DRYDEN (Lat: 42.494889,  Lng: -76.328642),  Route carried "on" structure: Other road ,  Year Built: 2020,  Status: Open,  Structure Length: 3.05m (10.01ft),  Average Daily Traffic: 1,324 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,854 (year 2039),  Features Intersected: Virgil Creek,  Facility Carried by Structure: South George Road
Minimum Vertical Clearance: 32.69m (107.25ft),  Kilometerpoint: 0.692,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Very good,  Operating Rating: 94.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.04m (9.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $694,000,  Roadway Improvement Cost: $407,000,  Total Project Cost: $1,101,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 320985,  Location: E SIDE ON FREEVILLE TN LN (Lat: 42.516700,  Lng: -76.335533),  Route carried "on" structure: Other road ,  Year Built: 1988,  Status: Open,  Structure Length: 1.40m (4.59ft),  Average Daily Traffic: 692 (year 2016),  Truck Traffic: 7%,  Average Future Daily Traffic: 969 (year 2036),  Design Load: HS 20,  Features Intersected: FALL CREEK,  Facility Carried by Structure: HERMAN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.644,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Aluminum, Iron,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 6.4m (21.0ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 77.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $178,000,  Roadway Improvement Cost: $104,000,  Total Project Cost: $283,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 320986,  Location: 0.7 MI W OF FREEVILLE (Lat: 42.512689,  Lng: -76.359397),  Route carried "on" structure: Other road ,  Year Built: 1910,  Year Reconstructed: 1964,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 338 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 473 (year 2039),  Features Intersected: FALL CREEK,  Facility Carried by Structure: MILL STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.306,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.0m (59.1ft),  Curb-To-Curb Width: 4.5m (14.8ft),  Out-to-Out Width: 5.6m (18.4ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.82m (5.97ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Critical Feature Inspection Date: October 2021,  Bridge Improvement Cost: $959,000,  Roadway Improvement Cost: $561,000,  Total Project Cost: $1,520,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 321033,  Location: 1.7 MI NE OF FREEVILLE (Lat: 42.517542,  Lng: -76.338069),  Route carried "on" structure: County highway ,  Year Built: 1965,  Status: Open,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 4,772 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 4,801 (year 2040),  Features Intersected: FALL CREEK,  Facility Carried by Structure: FALL CREEK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.837,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.4m (17.7ft),  Curb-To-Curb Width: 9.6m (31.5ft),  Out-to-Out Width: 10.6m (34.8ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 76.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 1.73m (5.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $626,000,  Roadway Improvement Cost: $366,000,  Total Project Cost: $992,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 331413,  Location: 1 MI NE OF FREEVILLE (Lat: 42.519933,  Lng: -76.327742),  Route carried "on" structure: County highway ,  Year Built: 1965,  Status: Open,  Structure Length: 2.01m (6.59ft),  Average Daily Traffic: 3,442 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 3,463 (year 2040),  Features Intersected: FALL CREEK,  Facility Carried by Structure: FALL CREEK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.660,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 6.4m (21.0ft),  Curb-To-Curb Width: 9.7m (31.8ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 77.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.01m (6.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $675,000,  Roadway Improvement Cost: $396,000,  Total Project Cost: $1,071,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 331417,  Location: 6.8 MI SE OF WEST GROTON (Lat: 42.517981,  Lng: -76.381906),  Route carried "on" structure: County highway ,  Year Built: 1997,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 2,196 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 3,070 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: MILL CREEK,  Facility Carried by Structure: WEST DRYDEN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.282,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.6m (34.8ft)

Condition: Channel: Satisfactory,  Culverts: Very good,  Operating Rating: 80.2 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.09m (3.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $248,000,  Roadway Improvement Cost: $145,000,  Total Project Cost: $393,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 331418,  Location: IN ETNA (Lat: 42.485339,  Lng: -76.384544),  Route carried "on" structure: County highway ,  Year Built: 1960,  Status: Posted for load,  Structure Length: 3.60m (11.81ft),  Average Daily Traffic: 439 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 543 (year 2040),  Design Load: HS 20,  Features Intersected: FALL CREEK,  Facility Carried by Structure: COUNTY ROAD 109
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.654,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 35.4m (116.1ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 3.59m (11.78ft),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 12 months,  Inspection Date: August 2021,  Critical Feature Inspection Date: August 2021,  Bridge Improvement Cost: $877,000,  Roadway Improvement Cost: $514,000,  Total Project Cost: $1,391,000 ( Estimate for 2021),  Deck Structure Type: Open Grating,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 336786,  Location: 3.5 MI W OF DRYDEN (Lat: 42.480194,  Lng: -76.354478),  Route carried "on" structure: County highway ,  Year Built: 1988,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 666 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 931 (year 2040),  Features Intersected: TRIB FALL CREEK,  Facility Carried by Structure: CO RD 164
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.360,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Aluminum, Iron,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft)

Condition: Channel: Poor,  Culverts: Satisfactory,  Operating Rating: 77.6 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.73m (2.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $103,000,  Roadway Improvement Cost: $61,000,  Total Project Cost: $164,000 ( Estimate for 2021)