Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Georgetown, Georgia (GA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 10Number of bridges
  • 105ft / 32.5mTotal length
  • $48,366,000Total costs
  • 264,630Total average daily traffic
  • 2,657Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Georgetown
  • No street view available for this location

New bridges in Georgetown, GA - historical statistics
  • New bridges - historical statistics
  • 21960-1969
  • 31970-1979
  • 11980-1989
  • 22010-2019
Reconstructed bridges in Georgetown, GA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11970-1979
  • 11980-1989
  • 01990-1999
  • 12000-2009
Average Bridge Daily Traffic in Georgetown, GA
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 50.0%Very good
  • 50.0%Good
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 25.0%Very good
  • 50.0%Good
  • 25.0%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 25.0%Very good
  • 25.0%Good
  • 50.0%Fair
Find on map >>   Show street view

Structure Number: 510043,  Location: 8 MI SW OF SAVANNAH (Lat: 32.007431,  Lng: -81.238450),  Route carried "on" structure: US 17,  Year Built: 1984,  Year Reconstructed: 2000,  Status: Open,  Structure Length: 5.49m (18.01ft),  Average Daily Traffic: 19,480 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 29,220 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: LITTLE OGEECHEE RIVER,  Facility Carried by Structure: OCEAN HIGHWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.437,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.1m (65.9ft),  Skew: 29 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 11.0m (36.1ft),  Curb-To-Curb Width: 27.5m (90.2ft),  Out-to-Out Width: 28.4m (93.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: June 2020,  Underwater Inspection Date: July 2019,  Bridge Improvement Cost: $1,087,000,  Roadway Improvement Cost: $109,000,  Total Project Cost: $1,630,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 510073,  Location: 8 MI SW OF SAVANNAH (Lat: 31.995089,  Lng: -81.236508),  Route carried "on" structure: State highway 204,  Year Built: 1971,  Status: Open,  Structure Length: 2.74m (8.99ft),  Average Daily Traffic: 48,980 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 73,470 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: TIDAL CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.312,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 24.7m (81.0ft),  Skew: 30 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 26.0m (85.3ft),  Out-to-Out Width: 27.7m (90.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 45.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: May 2020,  Underwater Inspection Date: August 2019,  Bridge Improvement Cost: $543,000,  Roadway Improvement Cost: $54,000,  Total Project Cost: $815,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 510074,  Location: 8 MI SW OF SAVANNAH (Lat: 31.993378,  Lng: -81.232247),  Route carried "on" structure: State highway 204,  Year Built: 1971,  Status: Open,  Structure Length: 6.37m (20.90ft),  Average Daily Traffic: 48,980 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 73,470 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: CSX RAILROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.312,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 26.2m (86.0ft),  Skew: 30 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 23.2m (76.1ft),  Curb-To-Curb Width: 26.0m (85.3ft),  Out-to-Out Width: 27.7m (90.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 37.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,262,000,  Roadway Improvement Cost: $126,000,  Total Project Cost: $1,893,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 510075,  Location: 4 MI E OF INT I-16 (Lat: 31.988558,  Lng: -81.222939),  Route carried "on" structure: State highway 204,  Year Built: 1971,  Status: Open,  Structure Length: 5.43m (17.81ft),  Average Daily Traffic: 48,980 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 73,470 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: CSX RAILROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.312,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 25.6m (84.0ft),  Skew: 30 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 25.9m (85.0ft),  Out-to-Out Width: 27.8m (91.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 48.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,075,000,  Roadway Improvement Cost: $107,000,  Total Project Cost: $1,612,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 515104,  Location: 4 MI E OF I-95/SR204 (Lat: 31.986047,  Lng: -81.218131),  Route carried "on" structure: State highway 204,  Year Built: 2018,  Status: Open,  Structure Length: 4.85m (15.91ft),  Average Daily Traffic: 48,980 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 73,470 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: KING GEORGE BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.921,  Lanes on structure: 3,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.8m (78.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 48.5m (159.1ft),  Curb-To-Curb Width: 23.7m (77.8ft),  Out-to-Out Width: 24.7m (81.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Inventory Rating: 59.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.82m (19.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $14,119,000,  Roadway Improvement Cost: $1,411,000,  Total Project Cost: $21,178,000 ( Estimate for 2018),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 515105,  Location: 4 MI E OF I-95/SR204 (Lat: 31.986081,  Lng: -81.217417),  Route carried "on" structure: State highway 204,  Year Built: 2018,  Status: Open,  Structure Length: 4.85m (15.91ft),  Average Daily Traffic: 48,980 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 73,470 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: KING GEORGE BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.921,  Lanes on structure: 3,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.8m (78.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 48.5m (159.1ft),  Curb-To-Curb Width: 26.5m (86.9ft),  Out-to-Out Width: 27.4m (89.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Inventory Rating: 51.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.82m (19.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $14,119,000,  Roadway Improvement Cost: $1,411,000,  Total Project Cost: $21,178,000 ( Estimate for 2018),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: CEPSAMGA0000002,  Location: 1 MI N. OF GEORGTOWN GA (Lat: 31.891350,  Lng: -85.106294),  Route carried "on" structure: State lands road ,  Year Built: 1963,  Year Reconstructed: 1989,  Status: Posted for load,  Structure Length: 1.36m (4.46ft),  Average Daily Traffic: 125 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 200 (year 2041),  Design Load: H 20,  Features Intersected: RIVER BLUFF PARK CREEK,  Facility Carried by Structure: RIVER PARK ROAD A
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Corps of Engineers (Civil),  Maintenance Responsibility: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.6m (15.1ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Poor,  Channel: Fair,  Operating Rating: 29.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 12.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 7.62m (25.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $5,000,  Roadway Improvement Cost: $5,000,  Total Project Cost: $10,000 ( Estimate for 2021),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Other,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: CEPSAMGA0000003,  Location: 1 MI N. OF GEORGETOWN GA. (Lat: 31.889861,  Lng: -85.106389),  Route carried "on" structure: State lands road ,  Year Built: 1963,  Year Reconstructed: 1984,  Status: Posted for load,  Structure Length: 1.36m (4.46ft),  Average Daily Traffic: 125 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 200 (year 2041),  Design Load: H 20,  Features Intersected: RIVER BLUFF PARK ACC. RD,  Facility Carried by Structure: W.F.GEORGE ACC. RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Corps of Engineers (Civil),  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.6m (15.1ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Poor,  Channel: Fair,  Operating Rating: 43.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 4.57m (14.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $45,000,  Roadway Improvement Cost: $3,000,  Total Project Cost: $50,000 ( Estimate for 2021),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Other,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: 515104,  Location: 4 MI E OF I-95/SR204 (Lat: 31.986047,  Lng: -81.218131),  Route carried "under" structure: County highway 71,  Structure Length: 0. m,  Features Intersected: SR 204,  Facility Carried by Structure: SR 204
Minimum Vertical Clearance: 5.48m (17.98ft),  Kilometerpoint: 1.609,  Lanes on structure: 3,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 515105,  Location: 4 MI E OF I-95/SR204 (Lat: 31.986081,  Lng: -81.217417),  Route carried "under" structure: County highway 71,  Structure Length: 0. m,  Features Intersected: SR 204,  Facility Carried by Structure: SR 204
Minimum Vertical Clearance: 5.48m (17.98ft),  Kilometerpoint: 1.609,  Lanes on structure: 3,  Length of Maximum Span: 0.0m

Discuss Georgetown, Georgia (GA) on our hugely popular Georgia forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.