Bridge Statistics for Hampton, New Hampshire (NH)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 29Number of bridges
  • 246ft / 75.2mTotal length
  • $59,698,000Total costs
  • 689,375Total average daily traffic
  • 52,169Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Hampton
  • No street view available for this location

New bridges in Hampton, NH - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 21930-1939
  • 21950-1959
  • 71960-1969
  • 71970-1979
  • 61990-1999
  • 22000-2009
  • 22010-2019
Reconstructed bridges in Hampton, NH - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21970-1979
  • 11980-1989
  • 01990-1999
  • 12000-2009
Average Bridge Daily Traffic in Hampton, NH
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 22.2%Very good
  • 33.3%Good
  • 27.8%Satisfactory
  • 16.7%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 22.2%Very good
  • 38.9%Good
  • 16.7%Satisfactory
  • 16.7%Fair
  • 5.6%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 16.7%Very good
  • 50.0%Good
  • 22.2%Satisfactory
  • 5.6%Fair
  • 5.6%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 40.0%Very good
  • 60.0%Good
Find on map >>   Show street view

Structure Number: 111009600108,  Location: AT HAMPTON FALLS TL (Lat: 42.936619,  Lng: -70.874239),  Route carried "on" structure: Other road ,  Year Built: 1977,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 2,041 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 3,020 (year 2042),  Design Load: HS 20,  Features Intersected: TAYLOR RIVER,  Facility Carried by Structure: TOWLE FARM ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.364,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 70.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.82m (2.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 111009800182,  Location: AT I-95 INTERCHANGE (Lat: 42.961722,  Lng: -70.863508),  Route carried "on" structure: Ramp Other road 95,  Year Built: 1976,  Status: Open,  Structure Length: 7.13m (23.39ft),  Average Daily Traffic: 17,103 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 25,312 (year 2042),  Design Load: HS 20+Mod,  Features Intersected: NH101
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.702,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 17.7m (58.1ft),  Skew: 20 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 35.7m (117.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 17.7m (58.1ft),  Out-to-Out Width: 18.5m (60.7ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.13m (23.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 11101120018,  Location: HAMPTON (Lat: 42.959700,  Lng: -70.856844),  Route carried "on" structure: Interstate 101,  Year Built: 2000,  Status: Open,  Structure Length: 10.45m (34.28ft),  Average Daily Traffic: 8,158 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 12,073 (year 2042),  Design Load: HS 25 or greater,  Features Intersected: I-95
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 33.914,  Lanes on structure: 4,  Lanes under structure: 10,  Base Highway Network: Yes,  Owner: State Toll Authority,  Approaching Roadway Width: 18.6m (61.0ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 53.2m (174.5ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 18.4m (60.4ft),  Out-to-Out Width: 19.4m (63.6ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 86.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 10.45m (34.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 111011300168,  Location: .5 MI N. HAMPTON T.L. (Lat: 42.956019,  Lng: -70.857575),  Route carried "on" structure: State highway 27,  Year Built: 1976,  Status: Open,  Structure Length: 8.96m (29.40ft),  Average Daily Traffic: 8,789 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 13,007 (year 2042),  Design Load: HS 20+Mod,  Features Intersected: I-95
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 54.270,  Lanes on structure: 2,  Lanes under structure: 8,  Owner: State Toll Authority,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 44.8m (147.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 17.3m (56.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 48.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.96m (29.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 111011500157,  Location: .3 MI FROM JCT RT 101 (Lat: 42.952267,  Lng: -70.858358),  Route carried "on" structure: Interstate 95,  Year Built: 1950,  Year Reconstructed: 1976,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 76,407 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 113,082 (year 2042),  Design Load: HS 20+Mod,  Features Intersected: ACCESS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.177,  Lanes on structure: 8,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 22.3m (73.2ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 44.5m (146.0ft),  Out-to-Out Width: 58.1m (190.6ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 80.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of replacement,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.07m (3.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 111011800129,  Location: 0.8 MI HAMPTON FALLS TL (Lat: 42.942317,  Lng: -70.860431),  Route carried "on" structure: Other road ,  Year Built: 1974,  Status: Open,  Structure Length: 8.05m (26.41ft),  Average Daily Traffic: 2,041 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 3,020 (year 2042),  Design Load: HS 20+Mod,  Features Intersected: I-95,  Facility Carried by Structure: TOWLE FARM ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.407,  Lanes on structure: 2,  Lanes under structure: 8,  Owner: State Toll Authority,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 39.6m (129.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 15.7m (51.5ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.05m (26.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 111012000103,  Location: 3.75 MI N of MA S/L (Lat: 42.933769,  Lng: -70.863006),  Route carried "on" structure: Interstate 95,  Year Built: 2018,  Status: Open,  Structure Length: 2.50m (8.20ft),  Average Daily Traffic: 39,743 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 58,819 (year 2042),  Design Load: HL 93,  Features Intersected: TAYLOR RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.988,  Lanes on structure: 4,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 22.3m (73.2ft),  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.0m (72.2ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 22.3m (73.2ft),  Out-to-Out Width: 23.1m (75.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 84.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 50.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.50m (8.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 111012100103,  Location: 3.75 MI N of MA S/L (Lat: 42.933656,  Lng: -70.862606),  Route carried "on" structure: Interstate 95,  Year Built: 2018,  Status: Open,  Structure Length: 2.50m (8.20ft),  Average Daily Traffic: 36,664 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 54,262 (year 2042),  Design Load: HL 93,  Features Intersected: TAYLOR RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.075,  Lanes on structure: 5,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 26.2m (86.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.6m (74.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 26.2m (86.0ft),  Out-to-Out Width: 27.0m (88.6ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 84.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 50.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.50m (8.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 111012300173,  Location: .3 MI FROM JCT. I-95 (Lat: 42.956158,  Lng: -70.853042),  Route carried "on" structure: State highway 101C,  Year Built: 1996,  Status: Open,  Structure Length: 7.13m (23.39ft),  Average Daily Traffic: 8,789 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 13,007 (year 2042),  Design Load: HS 25 or greater,  Features Intersected: NH101,  Facility Carried by Structure: NH 27
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 54.637,  Lanes on structure: 3,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 16.8m (55.1ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 36.6m (120.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 16.9m (55.4ft),  Out-to-Out Width: 19.4m (63.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.13m (23.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 111013500144,  Location: 0.3 MI FROM JCT. RT 95 (Lat: 42.945436,  Lng: -70.850817),  Route carried "on" structure: Other road ,  Year Built: 1995,  Status: Open,  Structure Length: 2.87m (9.42ft),  Average Daily Traffic: 2,041 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 3,020 (year 2042),  Design Load: HS 25 or greater,  Features Intersected: NH101,  Facility Carried by Structure: TOWLE FARM ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.264,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.1m (43.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 26.8m (87.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 13.3m (43.6ft),  Out-to-Out Width: 14.5m (47.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 86.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.87m (9.42ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 111014600087,  Location: 0.1 MI HAMPTON FALLS TL (Lat: 42.924692,  Lng: -70.852625),  Route carried "on" structure: US 1,  Year Built: 1965,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 18,847 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 27,893 (year 2042),  Design Load: HS 20,  Features Intersected: TAYLOR RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.404,  Lanes on structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.8m (32.2ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 17.4m (57.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 78.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.07m (3.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 111015800119,  Location: 0.6 MI FROM JCT 101C (Lat: 42.934408,  Lng: -70.843244),  Route carried "on" structure: State highway 51,  Year Built: 1963,  Status: Open,  Structure Length: 4.69m (15.39ft),  Average Daily Traffic: 9,803 (year 2020),  Average Future Daily Traffic: 14,508 (year 2042),  Design Load: HS 20+Mod,  Features Intersected: DRAKESIDE ROAD,  Facility Carried by Structure: NH101
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 149.486,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.1m (56.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 16.4m (53.8ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 57.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.69m (15.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 111016200104,  Location: .1 MI FROM JCT. RT 1 (Lat: 42.929881,  Lng: -70.843339),  Route carried "on" structure: Ramp US 1,  Year Built: 1963,  Status: Open,  Structure Length: 3.20m (10.50ft),  Average Daily Traffic: 9,661 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 14,298 (year 2042),  Features Intersected: NHRR(ABD)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.411,  Lanes on structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.0m (36.1ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 16.2m (53.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 61.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.20m (10.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 111016200112,  Location: .1 MI. FROM JCT RT 101 BY (Lat: 42.931839,  Lng: -70.842536),  Route carried "on" structure: US 1,  Year Built: 1936,  Year Reconstructed: 1994,  Status: Open,  Structure Length: 1.49m (4.89ft),  Average Daily Traffic: 9,965 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 14,748 (year 2042),  Design Load: H 20,  Features Intersected: NHRR(ABD)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.795,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.3m (46.9ft),  Curb or Sidewalk Widths: Left: 0.7m (2.3ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 10.6m (34.8ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 65.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.49m (4.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 111016200142,  Location: 3.8 MI E. EXET-HAMP T.L. (Lat: 42.942283,  Lng: -70.838606),  Route carried "on" structure: State highway 27,  Year Built: 1926,  Year Reconstructed: 2006,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 9,559 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 14,147 (year 2042),  Design Load: HS 25 or greater,  Features Intersected: PAR(ABD)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 56.744,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.2m (33.5ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 9.9m (32.5ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 76.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of replacement,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.16m (3.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 111016300184,  Location: 0.1 MI FROM N HAMPTON TL (Lat: 42.957283,  Lng: -70.833661),  Route carried "on" structure: US 1,  Year Built: 1936,  Year Reconstructed: 1977,  Status: Open,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 14,258 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 21,101 (year 2042),  Design Load: H 20,  Features Intersected: PAR(ABD)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.019,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 7 degrees,  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 32.9m (107.9ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Poor,  Operating Rating: 38.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Underclear: High priority of replacement,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.66m (12.01ft),  Designated Inspection Frequency: Every 8 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Critical Feature Inspection Date: April 2021,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 111016500113,  Location: 2.3 MI. FROM JCT. RT 95 (Lat: 42.932508,  Lng: -70.840808),  Route carried "on" structure: State highway 51,  Year Built: 1963,  Status: Open,  Structure Length: 3.69m (12.11ft),  Average Daily Traffic: 7,365 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 10,900 (year 2042),  Design Load: HS 20+Mod,  Features Intersected: US 1 SB,  Facility Carried by Structure: NH101
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 149.777,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.9m (48.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 59.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of replacement,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.69m (12.11ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 111017100109,  Location: 2.3 MI. FROM JCT. I-95 (Lat: 42.930878,  Lng: -70.837989),  Route carried "on" structure: State highway 51,  Year Built: 1963,  Status: Open,  Structure Length: 3.99m (13.09ft),  Average Daily Traffic: 6,232 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 9,223 (year 2042),  Design Load: HS 20,  Features Intersected: US 1 NB,  Facility Carried by Structure: NH101
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 150.070,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.7m (58.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 44.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.99m (13.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 11102470012,  Location: .2 MI WEST JCT NH 1A (Lat: 42.927406,  Lng: -70.800686),  Route carried "on" structure: City street 101E,  Year Built: 1997,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 3,432 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 5,079 (year 2042),  Design Load: HS 25 or greater,  Features Intersected: EEL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.582,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 73.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.73m (2.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 111009800182,  Location: AT I-95 INTERCHANGE (Lat: 42.961722,  Lng: -70.863508),  Route carried "under" structure: Interstate 51,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 41,000 (year 2015),  Truck Traffic: 7%,  Features Intersected: NH101,  Facility Carried by Structure: I-95 RAMP
Minimum Vertical Clearance: 5.00m (16.40ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 35.7m (117.1ft)

Find on map >>   Show street view

Structure Number: 111011200179,  Location: 2.0 MI FROM EXETER TL (Lat: 42.959400,  Lng: -70.856867),  Route carried "under" structure: Interstate 95,  Year Built: 1999,  Structure Length: 0. m,  Average Daily Traffic: 66,160 (year 2015),  Truck Traffic: 9%,  Features Intersected: I-95,  Facility Carried by Structure: NH101 EB
Minimum Vertical Clearance: 5.00m (16.40ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 10,  Toll: On toll road,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 53.2m (174.5ft)

Find on map >>   Show street view

Structure Number: 11101120018,  Location: HAMPTON (Lat: 42.959700,  Lng: -70.856844),  Route carried "under" structure: Interstate 95,  Year Built: 2000,  Structure Length: 0. m,  Average Daily Traffic: 66,160 (year 2015),  Truck Traffic: 6%,  Features Intersected: I-95,  Facility Carried by Structure: NH101 WB
Minimum Vertical Clearance: 5.26m (17.26ft),  Kilometerpoint: 2.410,  Lanes on structure: 4,  Lanes under structure: 10,  Toll: On toll road,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 53.2m (174.5ft)

Find on map >>   Show street view

Structure Number: 111011300168,  Location: .5 MI N. HAMPTON T.L. (Lat: 42.956019,  Lng: -70.857575),  Route carried "under" structure: Interstate 95,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 63,884 (year 2014),  Truck Traffic: 9%,  Features Intersected: I-95,  Facility Carried by Structure: NH 27
Minimum Vertical Clearance: 5.00m (16.40ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 8,  Toll: On toll road,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 44.8m (147.0ft)

Find on map >>   Show street view

Structure Number: 111011500157,  Location: .3 MI FROM JCT RT 101 (Lat: 42.952267,  Lng: -70.858358),  Route carried "under" structure: Ramp Interstate 95,  Year Built: 1950,  Structure Length: 0. m,  Average Daily Traffic: 4,900 (year 2015),  Truck Traffic: 9%,  Features Intersected: ACCESS ROAD
Minimum Vertical Clearance: 4.29m (14.07ft),  Kilometerpoint: 0.000,  Lanes on structure: 8,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Frame,  Length of Maximum Span: 9.1m (29.9ft)

Find on map >>   Show street view

Structure Number: 111011800129,  Location: 0.8 MI HAMPTON FALLS TL (Lat: 42.942317,  Lng: -70.860431),  Route carried "under" structure: Interstate 95,  Year Built: 1974,  Structure Length: 0. m,  Average Daily Traffic: 84,000 (year 2015),  Truck Traffic: 9%,  Features Intersected: I-95,  Facility Carried by Structure: TOWLE FARM ROAD
Minimum Vertical Clearance: 5.00m (16.40ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 8,  Toll: On toll road,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.6m (129.9ft)

Find on map >>   Show street view

Structure Number: 111012300173,  Location: .3 MI FROM JCT. I-95 (Lat: 42.956158,  Lng: -70.853042),  Route carried "under" structure: State highway 51,  Year Built: 1996,  Structure Length: 0. m,  Average Daily Traffic: 20,000 (year 2012),  Truck Traffic: 7%,  Features Intersected: NH101,  Facility Carried by Structure: NH 27
Minimum Vertical Clearance: 5.25m (17.22ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 36.6m (120.1ft)

Find on map >>   Show street view

Structure Number: 111013500144,  Location: 0.3 MI FROM JCT. RT 95 (Lat: 42.945436,  Lng: -70.850817),  Route carried "under" structure: State highway 51,  Year Built: 1995,  Structure Length: 0. m,  Average Daily Traffic: 18,000 (year 2015),  Truck Traffic: 7%,  Features Intersected: NH101,  Facility Carried by Structure: TOWLE FARM ROAD
Minimum Vertical Clearance: 5.16m (16.93ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.8m (87.9ft)

Find on map >>   Show street view

Structure Number: 111016500113,  Location: 2.3 MI. FROM JCT. RT 95 (Lat: 42.932508,  Lng: -70.840808),  Route carried "under" structure: US 51,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 20,373 (year 2014),  Truck Traffic: 5%,  Features Intersected: US 1 SB,  Facility Carried by Structure: NH101
Minimum Vertical Clearance: 4.49m (14.73ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 14.9m (48.9ft)

Find on map >>   Show street view

Structure Number: 111017100109,  Location: 2.3 MI. FROM JCT. I-95 (Lat: 42.930878,  Lng: -70.837989),  Route carried "under" structure: Ramp US 51,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 14,000 (year 2013),  Truck Traffic: 7%,  Features Intersected: US 1 NB,  Facility Carried by Structure: NH101
Minimum Vertical Clearance: 4.37m (14.34ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 17.7m (58.1ft)