Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Heidelberg, Mississippi (MS)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 29Number of bridges
  • 285ft / 87.2mTotal length
  • $2,258,424,000Total costs
  • 83,940Total average daily traffic
  • 14,899Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Heidelberg
  • No street view available for this location

New bridges in Heidelberg, MS - historical statistics
  • New bridges - historical statistics
  • 11950-1959
  • 131960-1969
  • 41970-1979
  • 61980-1989
  • 11990-1999
  • 12000-2009
  • 22010-2019
  • 12020-2022
Average Bridge Daily Traffic in Heidelberg, MS
Average Bridge Truck Traffic in Heidelberg, MS
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 11.1%Very good
  • 33.3%Good
  • 44.4%Satisfactory
  • 11.1%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 16.7%Very good
  • 44.4%Good
  • 33.3%Satisfactory
  • 5.6%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 16.7%Very good
  • 38.9%Good
  • 11.1%Satisfactory
  • 22.2%Fair
  • 11.1%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 11.8%Very good
  • 35.3%Good
  • 35.3%Satisfactory
  • 11.8%Fair
  • 5.9%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 20.0%Very good
  • 80.0%Good
Find on map >>   Show street view

Structure Number: 11000590311116A,  Location: 1.0 MI S SR 528 (Lat: 31.898700,  Lng: -89.028144),  Route carried "on" structure: Interstate 59,  Year Built: 1965,  Status: Open,  Structure Length: 6.55m (21.49ft),  Average Daily Traffic: 8,000 (year 2020),  Truck Traffic: 30%,  Average Future Daily Traffic: 9,500 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: COUNTY ROAD 8
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.791,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes (Inventory Route: 5,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.55m (21.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $226,000,000,  Roadway Improvement Cost: $130,000,000,  Total Project Cost: $356,000,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 11000590311116B,  Location: 1.0 MI S SR 528 (Lat: 31.898294,  Lng: -89.028089),  Route carried "on" structure: Interstate 59,  Year Built: 1965,  Status: Open,  Structure Length: 6.55m (21.49ft),  Average Daily Traffic: 8,000 (year 2020),  Truck Traffic: 30%,  Average Future Daily Traffic: 9,500 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: COUNTY ROAD 8
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.379,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes (Inventory Route: 5,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Inventory Rating: 48.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.55m (21.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $226,000,000,  Roadway Improvement Cost: $130,000,000,  Total Project Cost: $356,000,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 11000590311152,  Location: 2.5 MI N SR 528 (Lat: 31.937439,  Lng: -88.991861),  Route carried "on" structure: Interstate 59,  Year Built: 1965,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 13,000 (year 2020),  Truck Traffic: 31%,  Average Future Daily Traffic: 15,000 (year 2040),  Design Load: HS 20,  Features Intersected: BOGUE HOMA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.086,  Lanes on structure: 4,  Base Highway Network: Yes (Inventory Route: 5,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 40.2m (131.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 58.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.94m (3.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $140,000,000,  Roadway Improvement Cost: $200,000,000,  Total Project Cost: $340,000,000
Find on map >>   Show street view

Structure Number: 31005280310042,  Location: 4.2 MI E SR 15 (Lat: 31.961844,  Lng: -89.231114),  Route carried "on" structure: State highway 528,  Year Built: 1975,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 1,600 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 1,600 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.429,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 6.1m (20.0ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 66.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021
Find on map >>   Show street view

Structure Number: 31005280310192,  Location: 0.5 M W SR 503 (Lat: 31.919636,  Lng: -89.028458),  Route carried "on" structure: State highway 528,  Year Built: 1984,  Status: Open,  Structure Length: 2.90m (9.51ft),  Average Daily Traffic: 1,300 (year 2020),  Truck Traffic: 17%,  Average Future Daily Traffic: 1,300 (year 2040),  Design Load: HS 20,  Features Intersected: TALLAHATTA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 29.218,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 67.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.90m (9.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $54,000,000,  Roadway Improvement Cost: $200,000,000,  Total Project Cost: $294,000,000,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 31005280310203,  Location: SR 528 OVER I 59 (Lat: 31.907597,  Lng: -89.015389),  Route carried "on" structure: State highway 528,  Year Built: 1965,  Status: Open,  Structure Length: 7.83m (25.69ft),  Average Daily Traffic: 1,800 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 1,800 (year 2040),  Design Load: HS 20,  Features Intersected: I 59
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 31.418,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 65.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.83m (25.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $117,000,000,  Roadway Improvement Cost: $200,000,000,  Total Project Cost: $367,000,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 31005280310212,  Location: 0.5 MI E I 59 (Lat: 31.902503,  Lng: -89.010719),  Route carried "on" structure: State highway 528,  Year Built: 2016,  Status: Open,  Structure Length: 6.75m (22.15ft),  Average Daily Traffic: 4,700 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 4,700 (year 2040),  Design Load: HL 93,  Features Intersected: BOUGE HOMA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 32.151,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 3,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 45.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 34.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 31005280310234,  Location: 1.5 MI W US 11 (Lat: 31.886133,  Lng: -88.980200),  Route carried "on" structure: State highway 528,  Year Built: 1980,  Status: Open,  Structure Length: 1.95m (6.40ft),  Average Daily Traffic: 2,000 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 2,000 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: BEAVER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 35.829,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 6.1m (20.0ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 54.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021
Find on map >>   Show street view

Structure Number: 31005280310242,  Location: 0.5 MI W US 11 (Lat: 31.877758,  Lng: -88.973217),  Route carried "on" structure: State highway 528,  Year Built: 1980,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 2,000 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 2,000 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: BEAVER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 37.017,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 63.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021
Find on map >>   Show street view

Structure Number: 41000590311106,  Location: 4.9 MI N JONES CL (Lat: 31.886203,  Lng: -89.037692),  Route carried "on" structure: County highway ,  Year Built: 1965,  Status: Open,  Structure Length: 8.41m (27.59ft),  Average Daily Traffic: 230 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 230 (year 2040),  Design Load: HS 15,  Features Intersected: I 59,  Facility Carried by Structure: COUNTY ROAD 359
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.172,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 84.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.41m (27.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $267,000,000,  Roadway Improvement Cost: $200,000,000,  Total Project Cost: $542,000,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 41000590311146,  Location: 9.4 MI N JONES CL (Lat: 31.930383,  Lng: -88.997636),  Route carried "on" structure: County highway ,  Year Built: 1965,  Status: Open,  Structure Length: 7.99m (26.21ft),  Average Daily Traffic: 820 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 820 (year 2040),  Design Load: HS 15,  Features Intersected: I 59,  Facility Carried by Structure: COUNTY ROAD 35
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.555,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 96.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 58.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: SA3100000000004,  Location: SEC 20 T 1N R10W (Lat: 31.916583,  Lng: -88.990306),  Route carried "on" structure: County highway 20,  Year Built: 1970,  Status: Open,  Structure Length: 2.32m (7.61ft),  Average Daily Traffic: 820 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,230 (year 2040),  Design Load: H 15,  Features Intersected: BIG BOGUE HOMO CREEK,  Facility Carried by Structure: JASPER CO. 35
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.896,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 5.8m (19.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 45.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.78m (12.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $226,000,  Roadway Improvement Cost: $23,000,  Total Project Cost: $279,000 ( Estimate for 2020),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA3100000000009,  Location: SEC 1 T 1N R12E (Lat: 31.962125,  Lng: -89.025047),  Route carried "on" structure: County highway 93,  Year Built: 1985,  Status: Posted for load,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 20 (year 2021),  Truck Traffic: 8%,  Average Future Daily Traffic: 30 (year 2041),  Design Load: H 15,  Features Intersected: TALLAHATTA CREEK,  Facility Carried by Structure: JASPER CO. 3115
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.896,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.8m (19.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Poor,  Channel: Fair,  Operating Rating: 26.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 15.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 2.30m (7.55ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $320,000,  Roadway Improvement Cost: $60,000,  Total Project Cost: $380,000 ( Estimate for 2021),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA3100000000016,  Location: SEC 14 T 1N R13E B (Lat: 31.925944,  Lng: -88.938583),  Route carried "on" structure: County highway 234,  Year Built: 2002,  Status: Posted for load,  Structure Length: 8.53m (27.99ft),  Average Daily Traffic: 570 (year 2018),  Truck Traffic: 8%,  Average Future Daily Traffic: 855 (year 2038),  Design Load: H 15,  Features Intersected: OVER SOUTHERN RR,  Facility Carried by Structure: JASPER CO. 39
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.988,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 24.4m (80.1ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 24.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 16.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 9.69m (31.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $640,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $790,000 ( Estimate for 2016),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA3100000000017,  Location: SEC 34 T 1N R13E B (Lat: 31.890639,  Lng: -88.956236),  Route carried "on" structure: County highway 1286,  Year Built: 1955,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 1,400 (year 2021),  Truck Traffic: 20%,  Average Future Daily Traffic: 2,100 (year 2041),  Design Load: H 15,  Features Intersected: BEAVER CREEK,  Facility Carried by Structure: JASPER CO. 6
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.253,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.1m (23.3ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.8m (19.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 42.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.74m (5.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $160,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $310,000 ( Estimate for 2016),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: SA3100000000108,  Location: SEC 7 T10N R 9W B (Lat: 31.856389,  Lng: -88.928667),  Route carried "on" structure: County highway 1286,  Year Built: 1986,  Status: Open,  Structure Length: 4.05m (13.29ft),  Average Daily Traffic: 460 (year 2021),  Truck Traffic: 8%,  Average Future Daily Traffic: 690 (year 2041),  Design Load: H 15,  Features Intersected: LITTLE BOGUE HOMA,  Facility Carried by Structure: JASPER CO. 6
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.046,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 5.8m (19.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 60.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA3100000000109,  Location: SEC 18 T10N R 9W (Lat: 31.837667,  Lng: -88.942236),  Route carried "on" structure: County highway 1,  Year Built: 1980,  Status: Open,  Structure Length: 2.32m (7.61ft),  Average Daily Traffic: 50 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 75 (year 2040),  Design Load: H 15,  Features Intersected: LITTLE BOGUE HOMO CK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.574,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 5.8m (19.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Poor,  Operating Rating: 58.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.83m (9.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $169,000,  Roadway Improvement Cost: $14,000,  Total Project Cost: $208,000 ( Estimate for 2020),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA310000000011,  Location: SEC 4 T10N R10W B (Lat: 31.872986,  Lng: -89.000153),  Route carried "on" structure: County highway 291,  Year Built: 1998,  Status: Open,  Structure Length: 4.72m (15.49ft),  Average Daily Traffic: 1,400 (year 2021),  Truck Traffic: 20%,  Average Future Daily Traffic: 2,100 (year 2041),  Design Load: HS 20,  Features Intersected: BOGUE HOMO CREEK,  Facility Carried by Structure: JASPER CO. 35
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.242,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 9.4m (30.8ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 63.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.27m (17.29ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $350,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $500,000 ( Estimate for 2021),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA3100000000113,  Location: SEC 5 T10N R10W B (Lat: 31.867250,  Lng: -89.011639),  Route carried "on" structure: County highway 291,  Year Built: 1966,  Status: Open,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 1,400 (year 2021),  Truck Traffic: 20%,  Average Future Daily Traffic: 2,100 (year 2041),  Design Load: H 15,  Features Intersected: PRAIRIE CREEK,  Facility Carried by Structure: JASPER CO. 35
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.954,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.8m (19.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 45.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.32m (7.61ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $320,000,  Roadway Improvement Cost: $60,000,  Total Project Cost: $380,000 ( Estimate for 2021),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: SA3100000000114,  Location: SEC 1 T10N R11W B (Lat: 31.871181,  Lng: -89.050000),  Route carried "on" structure: County highway 100,  Year Built: 1974,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 160 (year 2021),  Truck Traffic: 8%,  Average Future Daily Traffic: 240 (year 2041),  Design Load: H 15,  Features Intersected: MILL CREEK,  Facility Carried by Structure: JASPER CO. 33
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.149,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.8m (19.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 47.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 28.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.74m (5.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $215,000,  Roadway Improvement Cost: $60,000,  Total Project Cost: $275,000 ( Estimate for 2021),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA3100000000129,  Location: SEC 19 T 1N R13E B (Lat: 31.909083,  Lng: -89.010383),  Route carried "on" structure: County highway 273,  Year Built: 1975,  Status: Posted for load,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 100 (year 2021),  Truck Traffic: 8%,  Average Future Daily Traffic: 150 (year 2041),  Design Load: H 15,  Features Intersected: BRANCH,  Facility Carried by Structure: JASPER CO. RD. 8
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.482,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.8m (19.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Good,  Operating Rating: 10.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 6.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.30m (7.55ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $152,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $302,000 ( Estimate for 2021),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA310000000A112,  Location: SEC 5 T10N R10W (Lat: 31.875703,  Lng: -89.023147),  Route carried "on" structure: County highway 102,  Year Built: 2021,  Status: Open,  Structure Length: 0.83m (2.72ft),  Average Daily Traffic: 60 (year 2021),  Average Future Daily Traffic: 90 (year 2041),  Design Load: HS 20,  Features Intersected: PRAIRIE CREEK,  Facility Carried by Structure: JASPER CO. 359
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.735,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 54.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021
Find on map >>   Show street view

Structure Number: SA310000000A142,  Location: SEC 8 T 1N R13E (Lat: 31.934211,  Lng: -88.988381),  Route carried "on" structure: Alternate County highway 3511,  Year Built: 2017,  Status: Open,  Structure Length: 4.73m (15.52ft),  Average Daily Traffic: 50 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 150 (year 2040),  Design Load: HL 93,  Features Intersected: BOGUE HOMO CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2012.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 5,  Number Of Approach Spans: 5,  Length of Maximum Span: 9.4m (30.8ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 43.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 33.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 31005280310203,  Location: SR 528 OVER I 59 (Lat: 31.907597,  Lng: -89.015389),  Route carried "under" structure: Interstate 59,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 7,000 (year 2017),  Truck Traffic: 10%,  Features Intersected: I 59,  Facility Carried by Structure: SR 528
Minimum Vertical Clearance: 4.92m (16.14ft),  Kilometerpoint: 31.413,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.3m (69.9ft)

Find on map >>   Show street view

Structure Number: 31005280310203,  Location: SR 528 OVER I 59 (Lat: 31.907597,  Lng: -89.015389),  Route carried "under" structure: Interstate 59,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 7,000 (year 2017),  Truck Traffic: 10%,  Features Intersected: I 59,  Facility Carried by Structure: SR 528
Minimum Vertical Clearance: 5.33m (17.49ft),  Kilometerpoint: 31.413,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.3m (69.9ft)

Find on map >>   Show street view

Structure Number: 41000590311106,  Location: 4.9 MI N JONES CL (Lat: 31.885831,  Lng: -89.037281),  Route carried "under" structure: Interstate 59,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 4,000 (year 2017),  Truck Traffic: 10%,  Features Intersected: I 59
Minimum Vertical Clearance: 4.91m (16.11ft),  Kilometerpoint: 7.746,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 24.4m (80.1ft)

Find on map >>   Show street view

Structure Number: 41000590311106,  Location: 4.9 MI N JONES CL (Lat: 31.886011,  Lng: -89.037489),  Route carried "under" structure: Interstate 59,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 4,000 (year 2017),  Truck Traffic: 10%,  Features Intersected: I 59
Minimum Vertical Clearance: 4.89m (16.04ft),  Kilometerpoint: 22.454,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 24.4m (80.1ft)

Find on map >>   Show street view

Structure Number: 41000590311146,  Location: 9.4 MI N JONES CL (Lat: 31.930881,  Lng: -88.997881),  Route carried "under" structure: Interstate 59,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 6,000 (year 2017),  Truck Traffic: 10%,  Features Intersected: I 59,  Facility Carried by Structure: COUNTY ROAD 35
Minimum Vertical Clearance: 4.91m (16.11ft),  Kilometerpoint: 16.042,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 21.3m (69.9ft)

Find on map >>   Show street view

Structure Number: 41000590311146,  Location: 9.4 MI N JONES CL (Lat: 31.930611,  Lng: -88.997750),  Route carried "under" structure: Interstate 59,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 6,000 (year 2017),  Truck Traffic: 10%,  Features Intersected: I 59,  Facility Carried by Structure: COUNTY ROAD 35
Minimum Vertical Clearance: 4.89m (16.04ft),  Kilometerpoint: 14.146,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 21.3m (69.9ft)

Discuss Heidelberg, Mississippi (MS) on our hugely popular Mississippi forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.