Bridge Statistics for Humphrey, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 13Number of bridges
  • 49ft / 15.4mTotal length
  • $12,841,000Total costs
  • 6,300Total average daily traffic
  • 399Total average daily truck traffic
  • 8,064Total future (year 2036) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Humphrey
  • No street view available for this location

New bridges in Humphrey, NY - historical statistics
  • New bridges - historical statistics
  • 41930-1939
  • 21970-1979
  • 11980-1989
  • 21990-1999
  • 42000-2009
Reconstructed bridges in Humphrey, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11980-1989
  • 31990-1999
  • 12000-2009
  • 12010-2019
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 10.0%Excellent
  • 10.0%Very good
  • 40.0%Good
  • 20.0%Satisfactory
  • 20.0%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 10.0%Excellent
  • 20.0%Very good
  • 20.0%Good
  • 20.0%Satisfactory
  • 30.0%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 10.0%Very good
  • 30.0%Good
  • 20.0%Satisfactory
  • 30.0%Fair
  • 10.0%Serious
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 15.4%Good
  • 46.2%Satisfactory
  • 30.8%Fair
  • 7.7%Poor
Find on map >>   Show street view

Structure Number: 106952,  Location: 4 MI NE JCT RTS 219 & 98 (Lat: 42.245389,  Lng: -78.574144),  Route carried "on" structure: State highway 98,  Year Built: 2001,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 1,382 (year 2016),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,395 (year 2040),  Features Intersected: BRANCH FORKS CRK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.613,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 9.3m (30.5ft),  Out-to-Out Width: 10.6m (34.8ft)

Condition: Channel: Satisfactory,  Culverts: Very good,  Operating Rating: 78.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $340,000,  Roadway Improvement Cost: $199,000,  Total Project Cost: $538,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 221202,  Location: 2.5 MI NE OF SUGARTOWN (Lat: 42.259100,  Lng: -78.557156),  Route carried "on" structure: Other road ,  Year Built: 1972,  Year Reconstructed: 1999,  Status: Posted for load,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 56 (year 2017),  Truck Traffic: 3%,  Average Future Daily Traffic: 78 (year 2037),  Features Intersected: FORKS CREEK,  Facility Carried by Structure: MORGAN HOLLOW RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.097,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Serious,  Channel: Fair,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 12 months,  Inspection Date: November 2021,  Critical Feature Inspection Date: November 2021,  Bridge Improvement Cost: $676,000,  Roadway Improvement Cost: $396,000,  Total Project Cost: $1,072,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 332191,  Location: 1.7 MILES W OF HUMPHREY (Lat: 42.200983,  Lng: -78.571964),  Route carried "on" structure: County highway ,  Year Built: 2005,  Status: Open,  Structure Length: 3.02m (9.91ft),  Average Daily Traffic: 1,527 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 2,138 (year 2036),  Design Load: HS 25 or greater,  Features Intersected: WRIGHTS CREEK,  Facility Carried by Structure: COUNTY ROAD 18
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.710,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 30.0m (98.4ft),  Curb-To-Curb Width: 10.2m (33.5ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 68.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.01m (9.88ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $1,693,000,  Roadway Improvement Cost: $992,000,  Total Project Cost: $2,685,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Other
Find on map >>   Show street view

Structure Number: 332192,  Location: .9 MILE NE OF HUMPHREY (Lat: 42.215569,  Lng: -78.529550),  Route carried "on" structure: County highway ,  Year Built: 1996,  Status: Open,  Structure Length: 1.55m (5.09ft),  Average Daily Traffic: 309 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 433 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: WRIGHTS CREEK,  Facility Carried by Structure: COUNTY ROAD 18
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.941,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.9m (48.9ft),  Curb-To-Curb Width: 9.2m (30.2ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 81.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.55m (5.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $1,353,000,  Roadway Improvement Cost: $792,000,  Total Project Cost: $2,145,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 332193,  Location: 3.6 MILES SE OF HUMPHREY (Lat: 42.193294,  Lng: -78.471592),  Route carried "on" structure: County highway ,  Year Built: 1993,  Status: Open,  Structure Length: 1.49m (4.89ft),  Average Daily Traffic: 555 (year 2018),  Truck Traffic: 8%,  Average Future Daily Traffic: 560 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: FIVE MILE CREEK,  Facility Carried by Structure: COUNTY ROAD 19
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.341,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.3m (46.9ft),  Curb-To-Curb Width: 9.9m (32.5ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.49m (4.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $854,000,  Roadway Improvement Cost: $500,000,  Total Project Cost: $1,354,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 332194,  Location: 1.5 MI NE OF SUGARTOWN (Lat: 42.249606,  Lng: -78.569714),  Route carried "on" structure: Other road ,  Year Built: 1973,  Year Reconstructed: 2016,  Status: Open,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 253 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 354 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: FORKS CREEK,  Facility Carried by Structure: SUGARTOWN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.129,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.9m (48.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Good,  Channel: Good,  Inventory Rating: 79.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.73m (5.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $1,016,000,  Roadway Improvement Cost: $595,000,  Total Project Cost: $1,612,000 ( Estimate for 2021),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 332195,  Location: 2.0 MI NE OF HUMPHREY (Lat: 42.232942,  Lng: -78.523808),  Route carried "on" structure: Other road ,  Year Built: 1938,  Year Reconstructed: 2008,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 79 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 111 (year 2038),  Features Intersected: WRIGHTS CREEK,  Facility Carried by Structure: BOZARD HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.193,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 6.0m (19.7ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 75.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.82m (2.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $427,000,  Roadway Improvement Cost: $250,000,  Total Project Cost: $676,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 332196,  Location: 3.6 MI NE OF HUMPHREY (Lat: 42.237225,  Lng: -78.485003),  Route carried "on" structure: Other road ,  Year Built: 1938,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 37 (year 2018),  Truck Traffic: 9%,  Average Future Daily Traffic: 52 (year 2038),  Features Intersected: WRIGHTS CREEK,  Facility Carried by Structure: BOZARD HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.459,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.6m (15.1ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 5.7m (18.7ft),  Out-to-Out Width: 5.7m (18.7ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 77.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.85m (2.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $183,000,  Roadway Improvement Cost: $107,000,  Total Project Cost: $291,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 332197,  Location: 3.4 MI NE OF HUMPHREY (Lat: 42.236342,  Lng: -78.489375),  Route carried "on" structure: Other road ,  Year Built: 1938,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 37 (year 2018),  Truck Traffic: 9%,  Average Future Daily Traffic: 52 (year 2038),  Features Intersected: WRIGHTS CREEK,  Facility Carried by Structure: BOZARD HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.089,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 3.4m (11.2ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.3m (20.7ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Poor,  Operating Rating: 30.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 23.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.85m (2.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $504,000,  Roadway Improvement Cost: $295,000,  Total Project Cost: $799,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 332198,  Location: 0.1 MI NW OF HUMPHREY (Lat: 42.207081,  Lng: -78.541578),  Route carried "on" structure: Other road ,  Year Built: 1937,  Year Reconstructed: 1996,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 208 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 291 (year 2038),  Features Intersected: WRIGHTS CREEK,  Facility Carried by Structure: HOWE HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.274,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.8m (38.7ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.21m (3.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $459,000,  Roadway Improvement Cost: $269,000,  Total Project Cost: $728,000 ( Estimate for 2021),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 332199,  Location: 2.7 MI SE OF HUMPHREY (Lat: 42.186553,  Lng: -78.493442),  Route carried "on" structure: Other road ,  Year Built: 1983,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 21 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 29 (year 2039),  Design Load: HS 20,  Features Intersected: FIVE MILE CREEK,  Facility Carried by Structure: CHURCH ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.338,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Wood or Timber,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 4.4m (14.4ft),  Out-to-Out Width: 5.0m (16.4ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 57.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $158,000,  Roadway Improvement Cost: $92,000,  Total Project Cost: $250,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 337023,  Location: 2.7 MI W OF HUMPHREY (Lat: 42.201856,  Lng: -78.556061),  Route carried "on" structure: County highway ,  Year Built: 2005,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 1,527 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 2,138 (year 2036),  Design Load: HS 25 or greater,  Features Intersected: Trib. Wrights Crk,  Facility Carried by Structure: COUNTY ROAD 18
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.045,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Channel: Satisfactory,  Culverts: Very good,  Operating Rating: 77.6 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.73m (2.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $307,000,  Roadway Improvement Cost: $180,000,  Total Project Cost: $486,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 33705,  Location: .5 mi NE of Humphrey (Lat: 42.208414,  Lng: -78.535114),  Route carried "on" structure: County highway ,  Year Built: 2002,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 309 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 433 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: TRIB. WRIGHTS CRK,  Facility Carried by Structure: COUNTY ROAD 18
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.944,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft)

Condition: Channel: Fair,  Culverts: Very good,  Operating Rating: 74.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 58.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.73m (2.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $129,000,  Roadway Improvement Cost: $76,000,  Total Project Cost: $205,000 ( Estimate for 2021)