Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Ivanhoe, Texas (TX)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 10Number of bridges
  • 348ft / 106mTotal length
  • $262,000Total costs
  • 13,727Total average daily traffic
  • 1,220Total average daily truck traffic
  • 18,059Total future (year 1900) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Ivanhoe
  • No street view available for this location

New bridges in Ivanhoe, TX - historical statistics
  • New bridges - historical statistics
  • 21930-1939
  • 72000-2009
  • 12020-2022
Reconstructed bridges in Ivanhoe, TX - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11970-1979
  • 11980-1989
Average Bridge Daily Traffic in Ivanhoe, TX
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 28.6%Very good
  • 42.9%Good
  • 14.3%Satisfactory
  • 14.3%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 42.9%Very good
  • 28.6%Good
  • 14.3%Satisfactory
  • 14.3%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 71.4%Good
  • 14.3%Satisfactory
  • 14.3%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 70.0%Good
  • 30.0%Satisfactory
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 66.7%Good
  • 33.3%Satisfactory
Find on map >>   Show street view

Structure Number: 10750027902192,  Location: 10.5 MI N of US 82 (Lat: 33.753117,  Lng: -96.196236),  Route carried "on" structure: State highway 78,  Year Built: 2021,  Status: Open,  Structure Length: 70.04m (229.79ft),  Average Daily Traffic: 2,331 (year 2018),  Average Future Daily Traffic: 1 (year 1900),  Design Load: HL 93,  Features Intersected: Red River
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 147.094,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Agenciy,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 17,  Length of Maximum Span: 41.1m (134.8ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.1m (46.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 202290020005016,  Location: 1.15 MI S OF JASPER C/L (Lat: 31.008739,  Lng: -94.398517),  Route carried "on" structure: US 69,  Year Built: 1932,  Year Reconstructed: 1985,  Status: Open,  Structure Length: 1.62m (5.31ft),  Average Daily Traffic: 2,571 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 3,850 (year 2033),  Design Load: H 15,  Features Intersected: GREENWOOD CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.601,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 2.4m (7.9ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 15.3m (50.2ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 202290020008022,  Location: 0.70 MI S OF FM 1013 (Lat: 30.659978,  Lng: -94.390917),  Route carried "on" structure: US 69,  Year Built: 1932,  Year Reconstructed: 1979,  Status: Open,  Structure Length: 18.29m (60.01ft),  Average Daily Traffic: 5,765 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 8,990 (year 2033),  Design Load: H 15,  Features Intersected: BIG CYPRESS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.297,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 30,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 13.3m (43.6ft),  Out-to-Out Width: 14.1m (46.3ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 48.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 202290123701012,  Location: 2.30 MI E OF US 69 (Lat: 30.675750,  Lng: -94.350047),  Route carried "on" structure: State highway 1013,  Year Built: 2008,  Status: Open,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 1,147 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 2,120 (year 2033),  Design Load: HL 93,  Features Intersected: TURKEY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.684,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 11.4m (37.4ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 3.87m (12.70ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $196,000,  Roadway Improvement Cost: $49,000,  Total Project Cost: $249,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 202290123701013,  Location: 0.80 MI E OF US 69 (Lat: 30.669803,  Lng: -94.373889),  Route carried "on" structure: State highway 1013,  Year Built: 2007,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 1,147 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 2,120 (year 2033),  Design Load: HL 93,  Features Intersected: BIG BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.297,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.7m (44.9ft),  Curb-To-Curb Width: 11.4m (37.4ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 202290AA0315001,  Location: 1.0 MI NE OF CR 4260 (Lat: 30.720058,  Lng: -94.380528),  Route carried "on" structure: County highway 4280,  Year Built: 2006,  Status: Open,  Structure Length: 1.65m (5.41ft),  Average Daily Traffic: 131 (year 2016),  Truck Traffic: 3%,  Average Future Daily Traffic: 131 (year 2037),  Design Load: HS 20,  Features Intersected: TURKEY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.62m (8.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021
Find on map >>   Show street view

Structure Number: 202290AA0315002,  Location: 2.0 MI E OF CR 4260 (Lat: 30.721592,  Lng: -94.364022),  Route carried "on" structure: County highway 4280,  Year Built: 2005,  Status: Open,  Structure Length: 1.14m (3.74ft),  Average Daily Traffic: 131 (year 2016),  Truck Traffic: 3%,  Average Future Daily Traffic: 131 (year 2037),  Design Load: HS 20,  Features Intersected: HUNTERS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021
Find on map >>   Show street view

Structure Number: 202290AA0318001,  Location: 0.6 MI SW OF US 69 (Lat: 30.668853,  Lng: -94.395756),  Route carried "on" structure: County highway ,  Year Built: 2000,  Status: Open,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 22 (year 2016),  Truck Traffic: 3%,  Average Future Daily Traffic: 30 (year 2037),  Features Intersected: MAGNUS BRANCH,  Facility Carried by Structure: CR 1205
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.966,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 3.0m (9.8ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 4.0m (13.1ft),  Out-to-Out Width: 4.3m (14.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 48.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Roadway Improvement Cost: $5,000,  Total Project Cost: $13,000,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 202290E00101001,  Location: 0.8 Mi S of Ivanhoe Dr (Lat: 30.673750,  Lng: -94.401481),  Route carried "on" structure: City street ,  Year Built: 2003,  Status: Open,  Structure Length: 4.88m (16.01ft),  Average Daily Traffic: 351 (year 2016),  Truck Traffic: 3%,  Average Future Daily Traffic: 490 (year 2040),  Features Intersected: LAKE CHARMAINE,  Facility Carried by Structure: CAMELOT DR S
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.287,  Lanes on structure: 1,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 10,  Length of Maximum Span: 4.9m (16.1ft),  Curb-To-Curb Width: 3.4m (11.2ft),  Out-to-Out Width: 3.7m (12.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 202290E00201001,  Location: 1 Mi SW of Chanticleer Dr (Lat: 30.675664,  Lng: -94.419519),  Route carried "on" structure: City street ,  Year Built: 2003,  Status: Open,  Structure Length: 1.95m (6.40ft),  Average Daily Traffic: 131 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 196 (year 2040),  Features Intersected: LAKE GALAHAD,  Facility Carried by Structure: LAKEWOOD DR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 4.9m (16.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Discuss Ivanhoe, Texas (TX) on our hugely popular Texas forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.