Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Kingston, Georgia (GA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 16Number of bridges
  • 135ft / 41.2mTotal length
  • $21,931,000Total costs
  • 39,165Total average daily traffic
  • 583Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Kingston
  • No street view available for this location

New bridges in Kingston, GA - historical statistics
  • New bridges - historical statistics
  • 21920-1929
  • 11930-1939
  • 11950-1959
  • 21960-1969
  • 21970-1979
  • 31980-1989
  • 21990-1999
  • 12000-2009
  • 12010-2019
Reconstructed bridges in Kingston, GA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11950-1959
  • 01960-1969
  • 01970-1979
  • 11980-1989
  • 01990-1999
  • 02000-2009
  • 12010-2019
Average Bridge Daily Traffic in Kingston, GA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 14.3%Very good
  • 42.9%Good
  • 42.9%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 28.6%Very good
  • 42.9%Good
  • 28.6%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 14.3%Very good
  • 42.9%Good
  • 42.9%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 50.0%Very good
  • 14.3%Good
  • 28.6%Satisfactory
  • 7.1%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 62.5%Good
  • 37.5%Satisfactory
Find on map >>   Show street view

Structure Number: 150025,  Location: 2.6 MI SW OF KINGSTON (Lat: 34.209039,  Lng: -84.978589),  Route carried "on" structure: US 411,  Year Built: 1959,  Year Reconstructed: 2017,  Status: Open,  Structure Length: 10.88m (35.70ft),  Average Daily Traffic: 15,890 (year 2015),  Truck Traffic: 1%,  Average Future Daily Traffic: 23,835 (year 2035),  Design Load: HS 20+Mod,  Features Intersected: ETOWAH RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.437,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Skew: 10 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 30.5m (100.1ft),  Curb or Sidewalk Widths: Left: 0.7m (2.3ft),  Right: 0.7m (2.3ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 30.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 18.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: July 2020,  Underwater Inspection Date: May 2019,  Bridge Improvement Cost: $1,395,000,  Roadway Improvement Cost: $139,000,  Total Project Cost: $2,092,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Galvanized Reinforcing
Find on map >>   Show street view

Structure Number: 150065,  Location: 3.3 MI E OF KINGSTON (Lat: 34.242978,  Lng: -84.889778),  Route carried "on" structure: State highway 293,  Year Built: 1929,  Year Reconstructed: 1980,  Status: Open,  Structure Length: 4.15m (13.62ft),  Average Daily Traffic: 2,530 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,795 (year 2031),  Design Load: H 15,  Features Intersected: TWO RUN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.921,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.5m (47.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $531,000,  Roadway Improvement Cost: $53,000,  Total Project Cost: $797,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 150066,  Location: 2 MI E OF KINGSTON (Lat: 34.245039,  Lng: -84.913289),  Route carried "on" structure: State highway 293,  Year Built: 1980,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 2,530 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,795 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: LIMEKILN BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.531,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Satisfactory,  Inventory Rating: 69.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $82,000,  Roadway Improvement Cost: $8,000,  Total Project Cost: $123,000
Find on map >>   Show street view

Structure Number: 150067,  Location: 1.1 MI E OF KINGSTON (Lat: 34.238500,  Lng: -84.927739),  Route carried "on" structure: State highway 293,  Year Built: 1928,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 2,530 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,795 (year 2031),  Design Load: H 15,  Features Intersected: SHANTY BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 24.140,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.22m (23.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $102,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $152,000
Find on map >>   Show street view

Structure Number: 150068,  Location: IN WEST KINGSTON (Lat: 34.238739,  Lng: -84.951169),  Route carried "on" structure: State highway 293,  Year Built: 1978,  Status: Open,  Structure Length: 4.79m (15.72ft),  Average Daily Traffic: 1,550 (year 2011),  Truck Traffic: 5%,  Average Future Daily Traffic: 2,325 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: CR 595- CSX RR (340472J)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 27.359,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 13.7m (44.9ft),  Curb-To-Curb Width: 13.7m (44.9ft),  Out-to-Out Width: 14.6m (47.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $613,000,  Roadway Improvement Cost: $61,000,  Total Project Cost: $920,000,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 150069,  Location: 0.9 MI W OF KINGSTON (Lat: 34.239958,  Lng: -84.962589),  Route carried "on" structure: State highway 293,  Year Built: 1980,  Status: Open,  Structure Length: 1.55m (5.09ft),  Average Daily Traffic: 1,630 (year 2011),  Truck Traffic: 9%,  Average Future Daily Traffic: 2,445 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: CONNESENA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 27.359,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Inventory Rating: 60.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $199,000,  Roadway Improvement Cost: $20,000,  Total Project Cost: $299,000
Find on map >>   Show street view

Structure Number: 150112,  Location: 2 MI SW OF KINGSTON (Lat: 34.215428,  Lng: -84.968769),  Route carried "on" structure: County highway 829,  Year Built: 1969,  Status: Open,  Structure Length: 3.93m (12.89ft),  Average Daily Traffic: 1,490 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,235 (year 2031),  Design Load: H 15,  Features Intersected: TWO RUN CREEK,  Facility Carried by Structure: REYNOLDS BR ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.093,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 8.3m (27.2ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Fair,  Operating Rating: 36.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 44.17m (144.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $504,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $756,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 155013,  Location: 1.5 MI W OF KINGSTON (Lat: 34.235789,  Lng: -84.972408),  Route carried "on" structure: County highway 78,  Year Built: 1989,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 600 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 900 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: CONNESENA CREEK,  Facility Carried by Structure: OLD ROME ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.7m (8.9ft)

Condition: Channel: Very good,  Culverts: Good,  Inventory Rating: 62.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $109,000,  Roadway Improvement Cost: $11,000,  Total Project Cost: $164,000
Find on map >>   Show street view

Structure Number: 155015,  Location: 3.8 MI NW OF KINGSTON (Lat: 34.270228,  Lng: -84.994139),  Route carried "on" structure: County highway 85,  Year Built: 1992,  Status: Open,  Structure Length: 1.49m (4.89ft),  Average Daily Traffic: 600 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 900 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: TOMS CREEK,  Facility Carried by Structure: TOM JONES ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.4m (11.2ft)

Condition: Channel: Very good,  Culverts: Satisfactory,  Operating Rating: 83.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $191,000,  Roadway Improvement Cost: $19,000,  Total Project Cost: $287,000
Find on map >>   Show street view

Structure Number: 155017,  Location: 3.1 MI N OF KINGSTON (Lat: 34.279189,  Lng: -84.955608),  Route carried "on" structure: County highway 91,  Year Built: 1935,  Year Reconstructed: 1950,  Status: Posted for load,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 600 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 900 (year 2031),  Features Intersected: CONNESENA CREEK,  Facility Carried by Structure: CONNESENA ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.0m (36.1ft),  Curb-To-Curb Width: 6.3m (20.7ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 9.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 5.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 41.33m (135.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $141,000,  Roadway Improvement Cost: $14,000,  Total Project Cost: $211,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 155075,  Location: IN SE KINGSTON (Lat: 34.230658,  Lng: -84.940700),  Route carried "on" structure: County highway 623,  Year Built: 1979,  Status: Open,  Structure Length: 4.27m (14.01ft),  Average Daily Traffic: 4,380 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 6,570 (year 2031),  Design Load: HS 15,  Features Intersected: TWO RUN CREEK,  Facility Carried by Structure: HARDIN BRIDGE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.093,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 9.3m (30.5ft),  Out-to-Out Width: 10.3m (33.8ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 39.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $547,000,  Roadway Improvement Cost: $55,000,  Total Project Cost: $821,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 155084,  Location: 3 MI SW OF KINGSTON (Lat: 34.206269,  Lng: -84.982189),  Route carried "on" structure: County highway 829,  Year Built: 1962,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 3,540 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 5,310 (year 2031),  Design Load: H 15,  Features Intersected: ETOWAH RIVER TRIB.,  Facility Carried by Structure: MACEDONIA ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.093,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $125,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $188,000
Find on map >>   Show street view

Structure Number: 155095,  Location: 3.9 MI NW OF KINGSTON (Lat: 34.284119,  Lng: -84.980058),  Route carried "on" structure: County highway 91,  Year Built: 1996,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 600 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 900 (year 2031),  Features Intersected: TOMS CREEK,  Facility Carried by Structure: CONNESENA ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $172,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $258,000
Find on map >>   Show street view

Structure Number: 15512,  Location: NORTH EAST OF KINGSTON (Lat: 34.273528,  Lng: -84.898300),  Route carried "on" structure: County highway 1289,  Year Built: 2006,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 90 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 135 (year 2031),  Design Load: H 15,  Features Intersected: BIG BRANCH,  Facility Carried by Structure: BRANSON MILL DR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.0m (36.1ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $141,000,  Roadway Improvement Cost: $14,000,  Total Project Cost: $211,000
Find on map >>   Show street view

Structure Number: 155156,  Location: 3.5 MI NW OF KINGSTON (Lat: 34.264739,  Lng: -84.993578),  Route carried "on" structure: County highway 82,  Year Built: 2019,  Status: Open,  Structure Length: 3.35m (10.99ft),  Average Daily Traffic: 125 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 150 (year 2039),  Design Load: HL 93,  Features Intersected: TOMS CREEK,  Facility Carried by Structure: NORTON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.02m (13.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $9,768,000,  Roadway Improvement Cost: $977,000,  Total Project Cost: $14,652,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 150068,  Location: IN WEST KINGSTON (Lat: 34.238739,  Lng: -84.951169),  Route carried "under" structure: County highway 595,  Structure Length: 0. m,  Average Daily Traffic: 480 (year 1999),  Truck Traffic: 1%,  Features Intersected: SR 293,  Facility Carried by Structure: SR 293
Minimum Vertical Clearance: 5.46m (17.91ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Discuss Kingston, Georgia (GA) on our hugely popular Georgia forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.