Bridge Statistics for Kirkland, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 10Number of bridges
  • 72ft / 21.5mTotal length
  • $10,154,000Total costs
  • 30,158Total average daily traffic
  • 1,493Total average daily truck traffic
  • 34,642Total future (year 2036) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Kirkland
  • No street view available for this location

New bridges in Kirkland, NY - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 31950-1959
  • 11960-1969
  • 41990-1999
  • 12010-2019
Reconstructed bridges in Kirkland, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11960-1969
  • 01970-1979
  • 01980-1989
  • 21990-1999
Average Bridge Daily Traffic in Kirkland, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 75.0%Good
  • 25.0%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 12.5%Excellent
  • 25.0%Very good
  • 25.0%Good
  • 25.0%Satisfactory
  • 12.5%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 12.5%Very good
  • 37.5%Good
  • 12.5%Satisfactory
  • 12.5%Fair
  • 25.0%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 10.0%Excellent
  • 10.0%Very good
  • 20.0%Good
  • 20.0%Satisfactory
  • 30.0%Fair
  • 10.0%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 50.0%Excellent
  • 50.0%Satisfactory
Find on map >>   Show street view

Structure Number: 10022,  Location: 0.5 M E JCT RTS 233 & 5 (Lat: 43.077781,  Lng: -75.379892),  Route carried "on" structure: State highway 5,  Year Built: 1998,  Status: Open,  Structure Length: 3.05m (10.01ft),  Average Daily Traffic: 10,227 (year 2014),  Truck Traffic: 4%,  Average Future Daily Traffic: 10,275 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: ORISKANY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.689,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.0m (59.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 29.5m (96.8ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 18.0m (59.1ft),  Out-to-Out Width: 20.3m (66.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.04m (9.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $1,294,000,  Roadway Improvement Cost: $758,000,  Total Project Cost: $2,052,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 100989,  Location: .2 MI E JCT RTS 12B & 233 (Lat: 43.032303,  Lng: -75.400578),  Route carried "on" structure: State highway 12B,  Year Built: 1928,  Year Reconstructed: 1972,  Status: Open,  Structure Length: 2.01m (6.59ft),  Average Daily Traffic: 3,937 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 3,955 (year 2040),  Design Load: HS 20,  Features Intersected: ORISKANY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.969,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.2m (59.7ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Poor,  Channel: Good,  Operating Rating: 28.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 22.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.01m (6.59ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Critical Feature Inspection Date: July 2021,  Bridge Improvement Cost: $560,000,  Roadway Improvement Cost: $328,000,  Total Project Cost: $887,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 104796,  Location: 02MI E JCT RTS 412+233 (Lat: 43.048375,  Lng: -75.391600),  Route carried "on" structure: State highway 412,  Year Built: 1958,  Status: Open,  Structure Length: 3.29m (10.79ft),  Average Daily Traffic: 4,279 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 5,198 (year 2040),  Design Load: HS 20,  Features Intersected: ORISKANY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.338,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 15.8m (51.8ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 16.6m (54.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Poor,  Channel: Fair,  Operating Rating: 83.8 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.29m (10.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $1,335,000,  Roadway Improvement Cost: $782,000,  Total Project Cost: $2,117,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 220577,  Location: 1 MI NE HAMILTON COLLEGE (Lat: 43.059794,  Lng: -75.388192),  Route carried "on" structure: Other road ,  Year Built: 1960,  Status: Open,  Structure Length: 2.26m (7.41ft),  Average Daily Traffic: 1,800 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 2,520 (year 2038),  Design Load: H 20,  Features Intersected: ORISKANY CR,  Facility Carried by Structure: CR15A NORTON AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.322,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 41.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.25m (7.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $547,000,  Roadway Improvement Cost: $320,000,  Total Project Cost: $868,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 227147,  Location: TOWN OF KIRKLAND (Lat: 43.036161,  Lng: -75.390211),  Route carried "on" structure: Other road ,  Year Built: 2019,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 291 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 407 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: WHITE CREEK,  Facility Carried by Structure: GRANT ROAD
Minimum Vertical Clearance: 32.69m (107.25ft),  Kilometerpoint: 0.145,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 2 degrees,  Material/Design: Aluminum, Iron,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft)

Condition: Channel: Very good,  Culverts: Excellent,  Operating Rating: 78.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.97m (3.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $127,000,  Roadway Improvement Cost: $74,000,  Total Project Cost: $202,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 331069,  Location: 3 MI NE HAMILTON COLLEGE (Lat: 43.092556,  Lng: -75.378869),  Route carried "on" structure: County highway ,  Year Built: 1994,  Status: Open,  Structure Length: 2.50m (8.20ft),  Average Daily Traffic: 1,786 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 2,209 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: ORISKANY CREEK,  Facility Carried by Structure: COUNTY ROAD 19
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.645,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.1m (75.8ft),  Curb-To-Curb Width: 10.7m (35.1ft),  Out-to-Out Width: 11.5m (37.7ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Fair,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.49m (8.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $772,000,  Roadway Improvement Cost: $452,000,  Total Project Cost: $1,224,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 33107,  Location: 2 MI NE HAMILTON COLLEGE (Lat: 43.071672,  Lng: -75.373778),  Route carried "on" structure: County highway ,  Year Built: 1991,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 2,746 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 3,397 (year 2040),  Features Intersected: CEMETERY BROOK,  Facility Carried by Structure: KIRKLAND AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.896,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.6m (11.8ft)

Condition: Channel: Poor,  Culverts: Satisfactory,  Operating Rating: 75.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.21m (3.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $210,000,  Roadway Improvement Cost: $123,000,  Total Project Cost: $333,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 331071,  Location: 1.5 MI NE HAMILTON COLL (Lat: 43.059194,  Lng: -75.373714),  Route carried "on" structure: County highway ,  Year Built: 1996,  Status: Open,  Structure Length: 1.40m (4.59ft),  Average Daily Traffic: 2,746 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 3,397 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: SHERMAN BROOK,  Facility Carried by Structure: CR32 KIRKLAND AVEN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.724,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.1m (39.7ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 86.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 66.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $458,000,  Roadway Improvement Cost: $268,000,  Total Project Cost: $727,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 331147,  Location: 2 MI S OF HAMILTN COLLEGE (Lat: 43.020272,  Lng: -75.400028),  Route carried "on" structure: Other road ,  Year Built: 1953,  Year Reconstructed: 2003,  Status: Open,  Structure Length: 2.26m (7.41ft),  Average Daily Traffic: 1,193 (year 2016),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,670 (year 2036),  Design Load: HS 25 or greater,  Features Intersected: ORISKANY CREEK,  Facility Carried by Structure: LUMBARD ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.237,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.7m (67.9ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Good,  Superstructure: Excellent,  Substructure: Good,  Channel: Fair,  Operating Rating: 71.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 55.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 2.25m (7.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $531,000,  Roadway Improvement Cost: $311,000,  Total Project Cost: $843,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Galvanized Reinforcing
Find on map >>   Show street view

Structure Number: 331148,  Location: 2 MI S HAMILTON COLLEGE (Lat: 43.022972,  Lng: -75.397564),  Route carried "on" structure: Other road ,  Year Built: 1954,  Year Reconstructed: 2002,  Status: Open,  Structure Length: 2.56m (8.40ft),  Average Daily Traffic: 1,153 (year 2016),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,614 (year 2036),  Design Load: HS 20,  Features Intersected: ORISKANY CREEK,  Facility Carried by Structure: DUGWAY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.156,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.3m (79.7ft),  Curb-To-Curb Width: 7.8m (25.6ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Excellent,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 41.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.56m (8.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $568,000,  Roadway Improvement Cost: $333,000,  Total Project Cost: $901,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Galvanized Reinforcing