Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Lebanon, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 14Number of bridges
  • 56ft / 16.5mTotal length
  • $5,852,000Total costs
  • 7,635Total average daily traffic
  • 532Total average daily truck traffic
  • 10,688Total future (year 2036) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Lebanon
  • No street view available for this location

New bridges in Lebanon, NY - historical statistics
  • New bridges - historical statistics
  • 21930-1939
  • 61950-1959
  • 21960-1969
  • 21980-1989
  • 21990-1999
Reconstructed bridges in Lebanon, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11980-1989
  • 11990-1999
  • 12000-2009
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 10.0%Excellent
  • 20.0%Very good
  • 30.0%Good
  • 10.0%Satisfactory
  • 20.0%Fair
  • 10.0%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 18.2%Excellent
  • 18.2%Very good
  • 18.2%Good
  • 18.2%Satisfactory
  • 27.3%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 36.4%Good
  • 36.4%Satisfactory
  • 27.3%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 7.1%Excellent
  • 21.4%Good
  • 21.4%Satisfactory
  • 50.0%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 33.3%Good
  • 33.3%Satisfactory
  • 33.3%Poor
Find on map >>   Show street view

Structure Number: 226665,  Location: AT LEBANON (Lat: 42.774794,  Lng: -75.617786),  Route carried "on" structure: Other road ,  Year Built: 1981,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 48 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 67 (year 2039),  Features Intersected: STONE MILL BROOK,  Facility Carried by Structure: DEEP SPRING ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.459,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.3m (10.8ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Channel: Fair,  Culverts: Poor,  Operating Rating: 74.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 29.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $129,000,  Roadway Improvement Cost: $76,000,  Total Project Cost: $205,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 226822,  Location: LEBANON RESERVOIR (Lat: 42.802181,  Lng: -75.601258),  Route carried "on" structure: County highway ,  Year Built: 1992,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 437 (year 2016),  Truck Traffic: 6%,  Average Future Daily Traffic: 612 (year 2036),  Design Load: HS 20,  Features Intersected: KINGSLEY BROOK,  Facility Carried by Structure: CR 66 RESERVOIR RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.926,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.4m (40.7ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Good,  Channel: Excellent,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.34m (4.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $398,000,  Roadway Improvement Cost: $233,000,  Total Project Cost: $631,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 33084,  Location: 1 MILE NE OF EARLVILLE (Lat: 42.757047,  Lng: -75.577331),  Route carried "on" structure: ServiceCounty highway ,  Year Built: 1994,  Status: Open,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 246 (year 2016),  Truck Traffic: 6%,  Average Future Daily Traffic: 344 (year 2036),  Design Load: HS 25 or greater,  Features Intersected: STONE MILL BROOK,  Facility Carried by Structure: CR62 LEBANON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.210,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.0m (45.9ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 1.46m (4.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $381,000,  Roadway Improvement Cost: $223,000,  Total Project Cost: $605,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 330841,  Location: AT LEBANON (Lat: 42.755458,  Lng: -75.576764),  Route carried "on" structure: County highway ,  Year Built: 1958,  Year Reconstructed: 2013,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 246 (year 2016),  Truck Traffic: 6%,  Average Future Daily Traffic: 344 (year 2036),  Design Load: HL 93,  Features Intersected: STONE MILL BROOK,  Facility Carried by Structure: CR 62
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.371,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Fair,  Channel: Fair,  Operating Rating: 58.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 44.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.97m (3.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $285,000,  Roadway Improvement Cost: $167,000,  Total Project Cost: $453,000 ( Estimate for 2021),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 330842,  Location: LEBANON (Lat: 42.752000,  Lng: -75.554531),  Route carried "on" structure: County highway ,  Year Built: 1955,  Status: Posted for load,  Structure Length: 1.95m (6.40ft),  Average Daily Traffic: 542 (year 2017),  Truck Traffic: 7%,  Average Future Daily Traffic: 759 (year 2037),  Design Load: H 20,  Features Intersected: CHENANGO RIVER,  Facility Carried by Structure: CR62 NOWER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.980,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.9m (62.0ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 24.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 14.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.95m (6.40ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $454,000,  Roadway Improvement Cost: $266,000,  Total Project Cost: $720,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 330843,  Location: 2.0 MI.S.OF LEBANON (Lat: 42.758992,  Lng: -75.658025),  Route carried "on" structure: County highway ,  Year Built: 1950,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 104 (year 2016),  Truck Traffic: 2%,  Average Future Daily Traffic: 146 (year 2036),  Features Intersected: LEBANON BROOK,  Facility Carried by Structure: CR71 CAMPBELL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.057,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.85m (2.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $214,000,  Roadway Improvement Cost: $125,000,  Total Project Cost: $340,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 330844,  Location: AT LEBANON (Lat: 42.749008,  Lng: -75.558503),  Route carried "on" structure: County highway ,  Year Built: 1952,  Status: Open,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 1,203 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 1,684 (year 2039),  Design Load: H 20,  Features Intersected: STONE MILL BROOK,  Facility Carried by Structure: CR73 RIVER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.110,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.9m (35.8ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 33.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 25.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.24m (4.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $281,000,  Roadway Improvement Cost: $165,000,  Total Project Cost: $446,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 330845,  Location: AT LEBANON (Lat: 42.813811,  Lng: -75.586100),  Route carried "on" structure: County highway ,  Year Built: 1988,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 1,293 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 1,810 (year 2039),  Features Intersected: BRADLEY BROOK,  Facility Carried by Structure: CR73 RIVER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.914,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.0m (19.7ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $228,000,  Roadway Improvement Cost: $134,000,  Total Project Cost: $362,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 330846,  Location: AT LEBANON (Lat: 42.810558,  Lng: -75.579103),  Route carried "on" structure: County highway ,  Year Built: 1938,  Year Reconstructed: 1994,  Status: Open,  Structure Length: 1.68m (5.51ft),  Average Daily Traffic: 557 (year 2017),  Truck Traffic: 9%,  Average Future Daily Traffic: 780 (year 2037),  Design Load: HS 25 or greater,  Features Intersected: CHENANGO RIVER,  Facility Carried by Structure: CR66 ARMSTRONG RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.613,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.8m (51.8ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 51.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.67m (5.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $324,000,  Roadway Improvement Cost: $190,000,  Total Project Cost: $514,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 330847,  Location: RANDALLSVILLE (Lat: 42.797781,  Lng: -75.570525),  Route carried "on" structure: County highway ,  Year Built: 1951,  Year Reconstructed: 2004,  Status: Open,  Structure Length: 1.95m (6.40ft),  Average Daily Traffic: 942 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 1,319 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: CHENANGO RIVER,  Facility Carried by Structure: CR75 RANDALLSVILLE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.306,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 7.8m (25.6ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 78.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.95m (6.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $396,000,  Roadway Improvement Cost: $232,000,  Total Project Cost: $627,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 330848,  Location: JCT MIDDLEPORT RDAND RT12 (Lat: 42.791033,  Lng: -75.561489),  Route carried "on" structure: County highway ,  Year Built: 1935,  Status: Open,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 406 (year 2016),  Truck Traffic: 13%,  Average Future Daily Traffic: 568 (year 2036),  Features Intersected: PAYNE BRK,  Facility Carried by Structure: CR77 MIDDLEPORT RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.129,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.3m (33.8ft),  Curb-To-Curb Width: 6.9m (22.6ft),  Out-to-Out Width: 7.2m (23.6ft)

Condition: Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 66.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.46m (4.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $201,000,  Roadway Improvement Cost: $118,000,  Total Project Cost: $319,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 335806,  Location: AT LEBANON (Lat: 42.782125,  Lng: -75.647731),  Route carried "on" structure: County highway ,  Year Built: 1969,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 435 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 609 (year 2040),  Design Load: H 20,  Features Intersected: STONE MILL BROOK,  Facility Carried by Structure: CR71 BRADLEY BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.841,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 2.7m (8.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 71.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.67m (2.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $84,000,  Roadway Improvement Cost: $49,000,  Total Project Cost: $133,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 336707,  Location: IN LEBANON (Lat: 42.780964,  Lng: -75.646003),  Route carried "on" structure: County highway ,  Year Built: 1954,  Status: Posted for load,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 485 (year 2016),  Truck Traffic: 9%,  Average Future Daily Traffic: 679 (year 2036),  Design Load: HS 20,  Features Intersected: STONE MILL BROOK,  Facility Carried by Structure: CR62 LEBANON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.259,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 30.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 18.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $207,000,  Roadway Improvement Cost: $121,000,  Total Project Cost: $328,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 442408,  Location: S EATON W HAMILTON NY (Lat: 42.807189,  Lng: -75.574242),  Route carried "on" structure: County highway ,  Year Built: 1967,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 691 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 967 (year 2039),  Design Load: HS 20,  Features Intersected: CHENANGO FEEDER,  Facility Carried by Structure: ARMSTRONG RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.241,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 6 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 78.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.85m (2.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $106,000,  Roadway Improvement Cost: $62,000,  Total Project Cost: $169,000 ( Estimate for 2021)
Discuss Lebanon, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.