Bridge Statistics for Lexington, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 22Number of bridges
  • 180ft / 54.8mTotal length
  • $29,008,000Total costs
  • 3,800Total average daily traffic
  • 313Total average daily truck traffic
  • 4,360Total future (year 2036) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Lexington
  • No street view available for this location

New bridges in Lexington, NY - historical statistics
  • New bridges - historical statistics
  • 1Before 1900
  • 11900-1909
  • 31930-1939
  • 11940-1949
  • 21980-1989
  • 41990-1999
  • 22000-2009
  • 62010-2019
  • 22020-2022
Reconstructed bridges in Lexington, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21990-1999
  • 22000-2009
  • 12010-2019
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 22.7%Excellent
  • 40.9%Very good
  • 18.2%Good
  • 9.1%Satisfactory
  • 4.5%Fair
  • 4.5%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 40.9%Excellent
  • 9.1%Very good
  • 27.3%Good
  • 4.5%Satisfactory
  • 9.1%Fair
  • 4.5%Poor
  • 4.5%Serious
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 31.8%Excellent
  • 22.7%Very good
  • 9.1%Good
  • 4.5%Satisfactory
  • 27.3%Fair
  • 4.5%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 9.1%Excellent
  • 9.1%Very good
  • 18.2%Good
  • 27.3%Satisfactory
  • 31.8%Fair
  • 4.5%Poor
Find on map >>   Show street view

Structure Number: 102519,  Location: RT 42 4.6 MI N ULSTER CO (Lat: 42.211864,  Lng: -74.386925),  Route carried "on" structure: State highway 42,  Year Built: 2011,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 669 (year 2016),  Truck Traffic: 9%,  Average Future Daily Traffic: 697 (year 2040),  Design Load: HL 93,  Features Intersected: WESTKILL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.450,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Inventory Rating: 73.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.10m (10.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $720,000,  Roadway Improvement Cost: $422,000,  Total Project Cost: $1,142,000 ( Estimate for 2021),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 10252,  Location: RT 42 6.4 MI N ULSTER CO (Lat: 42.233142,  Lng: -74.392053),  Route carried "on" structure: State highway 42,  Year Built: 2011,  Status: Open,  Structure Length: 4.63m (15.19ft),  Average Daily Traffic: 669 (year 2016),  Truck Traffic: 9%,  Average Future Daily Traffic: 697 (year 2040),  Design Load: HL 93,  Features Intersected: WEST KILL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.072,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 45.7m (149.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Very good,  Channel: Good,  Inventory Rating: 66.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 4.63m (15.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $1,157,000,  Roadway Improvement Cost: $677,000,  Total Project Cost: $1,834,000 ( Estimate for 2021),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 102521,  Location: RT 42 7.2 MI N ULSTER CO (Lat: 42.244864,  Lng: -74.381697),  Route carried "on" structure: State highway 42,  Year Built: 2017,  Status: Open,  Structure Length: 4.33m (14.21ft),  Average Daily Traffic: 669 (year 2016),  Truck Traffic: 9%,  Average Future Daily Traffic: 697 (year 2040),  Design Load: HL 93,  Features Intersected: WEST KILL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.649,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 42.7m (140.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Excellent,  Inventory Rating: 61.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 4.32m (14.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,133,000,  Roadway Improvement Cost: $664,000,  Total Project Cost: $1,797,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 102522,  Location: JCT SH 42 & SCHOHARIE CRK (Lat: 42.240014,  Lng: -74.365839),  Route carried "on" structure: State highway 42,  Year Built: 1930,  Year Reconstructed: 2019,  Status: Posted for load-capacity,  Structure Length: 5.49m (18.01ft),  Average Daily Traffic: 669 (year 2016),  Truck Traffic: 9%,  Average Future Daily Traffic: 697 (year 2040),  Design Load: HS 20,  Features Intersected: SCHOHARIE CREEK
Minimum Vertical Clearance: 4.50m (14.76ft),  Kilometerpoint: 13.210,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 53.3m (174.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Very good,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.48m (17.98ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Critical Feature Inspection Date: September 2021,  Bridge Improvement Cost: $3,759,000,  Roadway Improvement Cost: $2,201,000,  Total Project Cost: $5,960,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 32012,  Location: 3.5 MI NW LEXINGTON (Lat: 42.267953,  Lng: -74.412567),  Route carried "on" structure: Other road ,  Year Built: 1989,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 25 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 35 (year 2038),  Design Load: HS 20,  Features Intersected: LITTLE WEST KILL,  Facility Carried by Structure: FALKE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.145,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.0m (45.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Fair,  Channel: Fair,  Inventory Rating: 72.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $299,000,  Roadway Improvement Cost: $175,000,  Total Project Cost: $474,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 320121,  Location: 1.5 MI EAST OF LEXINGTON (Lat: 42.238519,  Lng: -74.339847),  Route carried "on" structure: Other road ,  Year Built: 1935,  Year Reconstructed: 2013,  Status: Open,  Structure Length: 4.08m (13.39ft),  Average Daily Traffic: 18 (year 2016),  Truck Traffic: 6%,  Average Future Daily Traffic: 25 (year 2036),  Design Load: HL 93,  Features Intersected: SCHOHARIE CREEK,  Facility Carried by Structure: BUSH ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.145,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 39.3m (128.9ft),  Curb-To-Curb Width: 4.0m (13.1ft),  Out-to-Out Width: 5.4m (17.7ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 4.08m (13.39ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Critical Feature Inspection Date: August 2021,  Bridge Improvement Cost: $1,596,000,  Roadway Improvement Cost: $935,000,  Total Project Cost: $2,531,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 320122,  Location: 2.5 MI NE HMLT CHICHESTER (Lat: 42.130767,  Lng: -74.344786),  Route carried "on" structure: Other road ,  Year Built: 2008,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 80 (year 2016),  Truck Traffic: 6%,  Average Future Daily Traffic: 112 (year 2036),  Design Load: HS 25 or greater,  Features Intersected: BROADSTREET HOLLOW STREA,  Facility Carried by Structure: BROADSTREET HOLLOW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.354,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.9m (48.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Very good,  Superstructure: Satisfactory,  Substructure: Very good,  Channel: Good,  Operating Rating: 61.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $413,000,  Roadway Improvement Cost: $242,000,  Total Project Cost: $655,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 320123,  Location: 3.5 MI W OF LANESVILLE (Lat: 42.133869,  Lng: -74.338206),  Route carried "on" structure: Other road ,  Year Built: 1997,  Status: Open,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 80 (year 2016),  Truck Traffic: 6%,  Average Future Daily Traffic: 112 (year 2036),  Features Intersected: BROADSTREET HLLOW,  Facility Carried by Structure: BROADSTR HLLOW RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.030,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 5.6m (18.4ft),  Out-to-Out Width: 6.2m (20.3ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 98.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 57.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.58m (5.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $594,000,  Roadway Improvement Cost: $348,000,  Total Project Cost: $942,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 320124,  Location: 4 MI WEST OF LANESVILLE (Lat: 42.132575,  Lng: -74.341469),  Route carried "on" structure: Other road ,  Year Built: 1987,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 40 (year 2016),  Truck Traffic: 6%,  Average Future Daily Traffic: 56 (year 2036),  Features Intersected: BROADSTREET HOLLOW STREA,  Facility Carried by Structure: TIMBERLAKE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Poor,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: High priority of corrective action,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 0.97m (3.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $214,000,  Roadway Improvement Cost: $125,000,  Total Project Cost: $339,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 320125,  Location: 3.5 MI SW HUNTER (Lat: 42.187331,  Lng: -74.282103),  Route carried "on" structure: Other road ,  Year Built: 1897,  Status: Posted for load,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 18 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 25 (year 2038),  Features Intersected: WEST KILL,  Facility Carried by Structure: SPRUCETON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.352,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.5m (41.0ft),  Curb-To-Curb Width: 5.6m (18.4ft),  Out-to-Out Width: 6.2m (20.3ft)

Condition: Deck: Poor,  Superstructure: Serious,  Substructure: Poor,  Channel: Fair,  Operating Rating: 15.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 12.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: High priority of corrective action,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.37m (4.49ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $268,000,  Roadway Improvement Cost: $157,000,  Total Project Cost: $425,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 320126,  Location: 1.5 MI E HAMLET SPRUCETON (Lat: 42.184575,  Lng: -74.273119),  Route carried "on" structure: Other road ,  Year Built: 1930,  Year Reconstructed: 1999,  Status: Open,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 18 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 25 (year 2038),  Design Load: HS 20,  Features Intersected: WEST KILL,  Facility Carried by Structure: SPRUCETON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.014,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.6m (15.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.2m (36.7ft),  Curb-To-Curb Width: 4.1m (13.5ft),  Out-to-Out Width: 4.5m (14.8ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Fair,  Channel: Fair,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 1.18m (3.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $175,000,  Roadway Improvement Cost: $102,000,  Total Project Cost: $277,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 320127,  Location: 4.5 MI SW HUNTER (Lat: 42.189064,  Lng: -74.297900),  Route carried "on" structure: Other road ,  Year Built: 1997,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 2 (year 2016),  Truck Traffic: 6%,  Average Future Daily Traffic: 3 (year 2036),  Features Intersected: WEST KILL,  Facility Carried by Structure: AD VAN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.113,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.4m (57.1ft),  Curb-To-Curb Width: 4.9m (16.1ft),  Out-to-Out Width: 5.5m (18.0ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 73.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.82m (5.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $297,000,  Roadway Improvement Cost: $174,000,  Total Project Cost: $471,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 320128,  Location: 5 MI SW HUNTER (Lat: 42.192389,  Lng: -74.309022),  Route carried "on" structure: Other road ,  Year Built: 1940,  Year Reconstructed: 2003,  Status: Open,  Structure Length: 1.65m (5.41ft),  Average Daily Traffic: 3 (year 2016),  Truck Traffic: 6%,  Average Future Daily Traffic: 4 (year 2036),  Features Intersected: WEST KILL,  Facility Carried by Structure: BAKER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.7m (44.9ft),  Curb-To-Curb Width: 4.9m (16.1ft),  Out-to-Out Width: 5.5m (18.0ft)

Condition: Deck: Excellent,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 1.64m (5.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $198,000,  Roadway Improvement Cost: $116,000,  Total Project Cost: $314,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 320129,  Location: 3 MI S JEWETT CENTER (Lat: 42.191583,  Lng: -74.327661),  Route carried "on" structure: Other road ,  Year Built: 2012,  Status: Open,  Structure Length: 1.62m (5.31ft),  Average Daily Traffic: 33 (year 2019),  Average Future Daily Traffic: 46 (year 2039),  Design Load: HL 93,  Features Intersected: WEST KILL,  Facility Carried by Structure: EVERGREEN MOUNTAIN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 7.1m (23.3ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Excellent,  Operating Rating: 96.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 57.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.61m (5.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $407,000,  Roadway Improvement Cost: $238,000,  Total Project Cost: $645,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 32013,  Location: 3 MI S JEWETT CENTER (Lat: 42.194431,  Lng: -74.333711),  Route carried "on" structure: Other road ,  Year Built: 2013,  Status: Open,  Structure Length: 1.98m (6.50ft),  Average Daily Traffic: 57 (year 2016),  Truck Traffic: 6%,  Average Future Daily Traffic: 80 (year 2036),  Features Intersected: WEST KILL,  Facility Carried by Structure: TUMBLWEED RNCH RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.6m (61.0ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Good,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Very good,  Inventory Rating: 54.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.98m (6.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $482,000,  Roadway Improvement Cost: $282,000,  Total Project Cost: $764,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 320131,  Location: 2 MI SE WESTKILL (Lat: 42.197939,  Lng: -74.357697),  Route carried "on" structure: Other road ,  Year Built: 1997,  Status: Open,  Structure Length: 2.41m (7.91ft),  Average Daily Traffic: 2 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 3 (year 2038),  Features Intersected: WEST KILL,  Facility Carried by Structure: SHOEMAKER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.032,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.2m (76.1ft),  Curb-To-Curb Width: 4.9m (16.1ft),  Out-to-Out Width: 5.5m (18.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Fair,  Operating Rating: 85.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 2.40m (7.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $420,000,  Roadway Improvement Cost: $246,000,  Total Project Cost: $666,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 320132,  Location: 1.5 MI SE HMLT WESTKILL (Lat: 42.200853,  Lng: -74.367544),  Route carried "on" structure: Other road ,  Year Built: 1996,  Status: Open,  Structure Length: 2.29m (7.51ft),  Average Daily Traffic: 5 (year 2016),  Truck Traffic: 6%,  Average Future Daily Traffic: 7 (year 2036),  Features Intersected: WEST KILL,  Facility Carried by Structure: LONG ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.6m (70.9ft),  Curb-To-Curb Width: 5.6m (18.4ft),  Out-to-Out Width: 6.2m (20.3ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Very good,  Channel: Satisfactory,  Inventory Rating: 57.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.28m (7.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $612,000,  Roadway Improvement Cost: $358,000,  Total Project Cost: $970,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 330293,  Location: 2.3 MILES NW OF LEXINGTON (Lat: 42.260572,  Lng: -74.398592),  Route carried "on" structure: County highway ,  Year Built: 1900,  Year Reconstructed: 2011,  Status: Open,  Structure Length: 4.45m (14.60ft),  Average Daily Traffic: 220 (year 2018),  Truck Traffic: 12%,  Average Future Daily Traffic: 308 (year 2038),  Design Load: HL 93,  Features Intersected: SCHOHARIE CREEK,  Facility Carried by Structure: LIT WESTKILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.064,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 43.3m (142.1ft),  Curb-To-Curb Width: 6.5m (21.3ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Very good,  Channel: Fair,  Operating Rating: 48.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 37.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 4.45m (14.60ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Critical Feature Inspection Date: June 2021,  Bridge Improvement Cost: $3,075,000,  Roadway Improvement Cost: $1,800,000,  Total Project Cost: $4,875,000 ( Estimate for 2021),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 330294,  Location: 1 MI E HMLT OF W KILL (Lat: 42.202775,  Lng: -74.377417),  Route carried "on" structure: County highway ,  Year Built: 2013,  Status: Open,  Structure Length: 3.47m (11.38ft),  Average Daily Traffic: 171 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 239 (year 2037),  Design Load: HL 93,  Features Intersected: WEST KILL,  Facility Carried by Structure: SPRUCETON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.142,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 33.2m (108.9ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 9.7m (31.8ft)

Condition: Deck: Good,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Good,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 3.47m (11.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $1,170,000,  Roadway Improvement Cost: $685,000,  Total Project Cost: $1,855,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 330295,  Location: 2.7 MI SE HMLT OF W KILL (Lat: 42.198094,  Lng: -74.341019),  Route carried "on" structure: County highway ,  Year Built: 2002,  Status: Open,  Structure Length: 1.55m (5.09ft),  Average Daily Traffic: 171 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 239 (year 2037),  Design Load: HS 25 or greater,  Features Intersected: WEST KILL,  Facility Carried by Structure: COUNTY ROAD 6
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.312,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 13.9m (45.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Excellent,  Channel: Satisfactory,  Operating Rating: 83.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.55m (5.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $413,000,  Roadway Improvement Cost: $242,000,  Total Project Cost: $655,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 330296,  Location: 0.5 MI W HMLT SPRUCETON (Lat: 42.193458,  Lng: -74.318658),  Route carried "on" structure: County highway ,  Year Built: 2021,  Status: Open,  Structure Length: 2.53m (8.30ft),  Average Daily Traffic: 171 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 239 (year 2037),  Features Intersected: WEST KILL,  Facility Carried by Structure: SPRUCETON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.516,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.1m (79.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Very good,  Operating Rating: 86.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.85m (6.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $447,000,  Roadway Improvement Cost: $262,000,  Total Project Cost: $709,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 336359,  Location: 3.2 MILES SW OF HUNTER (Lat: 42.188953,  Lng: -74.288167),  Route carried "on" structure: Other road ,  Year Built: 2020,  Status: Open,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 10 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 14 (year 2038),  Design Load: HL 93,  Features Intersected: WEST KILL,  Facility Carried by Structure: WOLFF ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.9m (39.0ft),  Curb-To-Curb Width: 5.2m (17.1ft),  Out-to-Out Width: 6.2m (20.3ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Good,  Operating Rating: 98.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 59.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.24m (4.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $446,000,  Roadway Improvement Cost: $261,000,  Total Project Cost: $708,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous