Bridge Statistics for Lyndon, Vermont (VT) - Condition, Traffic, Stress, Structural Evaluation, Project CostsBack to: Lyndon, VT, Vermont, Vermont forum, All US cities. National Bridge Inventory (NBI) Statistics Number of bridges: 41 Total length: 130 meters (427ft) Total costs: $44,802,000 Total average daily traffic: 110,020 Total average daily truck traffic: 8,628 National Bridge Inventory (NBI) Registered Bridges for Lyndon
Bridge Condition - Deck Bridge Condition - Superstructure Bridge Condition - Substructure Bridge Condition - Channel Bridge Condition - Culverts Find on map >>
Structure Number: 100307001203071, Location: 0.3 MI JCT TH 1 + TH 32 (Lat: 44.535278, Lng: -72.047778), Route carried "on" structure: Other road C2001, Year Built: 1949, Status: Open, Structure Length: 0.70m (2.30ft), Average Daily Traffic: 860 (year 1998), Truck Traffic: 3%, Average Future Daily Traffic: 1,290 (year 2018), Design Load: H 20, Features Intersected: SO. WHEELOCK BRANCH Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Town or Township Highway Agency, Approaching Roadway Width: 8.5m (27.9ft), Skew: 3 degrees, Material/Design: Concrete, Design/Construction: Slab, Number Of Spans In Main Unit: 1, Length of Maximum Span: 6.4m (21.0ft), Curb-To-Curb Width: 7.5m (24.6ft), Out-to-Out Width: 8.1m (26.6ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Channel: Satisfactory, Operating Rating: 44.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 26.1 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Meets minimum limits, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.25m (4.10ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2006, Bridge Improvement Cost: $325,000, Roadway Improvement Cost: $150,000, Total Project Cost: $475,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 100307001303071, Location: 0.65 MI TO JCT W CL2 TH6 (Lat: 44.506667, Lng: -71.968056), Route carried "on" structure: Other road C2002, Year Built: 1953, Status: Open, Structure Length: 0.76m (2.49ft), Average Daily Traffic: 700 (year 1998), Truck Traffic: 3%, Average Future Daily Traffic: 1,050 (year 2018), Design Load: H 20, Features Intersected: HAWKINS BROOK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Town or Township Highway Agency, Approaching Roadway Width: 7.9m (25.9ft), Skew: 1 degrees, Material/Design: Concrete, Design/Construction: Slab, Number Of Spans In Main Unit: 1, Length of Maximum Span: 6.7m (22.0ft), Curb-To-Curb Width: 8.1m (26.6ft), Out-to-Out Width: 8.5m (27.9ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Channel: Good, Operating Rating: 38.7 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 23.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.37m (4.49ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2006, Bridge Improvement Cost: $373,000, Roadway Improvement Cost: $150,000, Total Project Cost: $523,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 100307001403071, Location: 0.25 MI TO JCT W C3 TH45 (Lat: 44.520000, Lng: -71.951944), Route carried "on" structure: Other road C2002, Year Built: 1928, Year Reconstructed: 1993, Status: Open, Structure Length: 0.85m (2.79ft), Average Daily Traffic: 400 (year 1998), Truck Traffic: 3%, Average Future Daily Traffic: 600 (year 2018), Design Load: H 10, Features Intersected: HAWKINS BROOK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Town or Township Highway Agency, Approaching Roadway Width: 7.0m (23.0ft), Skew: 2 degrees, Material/Design: Concrete, Design/Construction: Slab, Number Of Spans In Main Unit: 1, Length of Maximum Span: 7.9m (25.9ft), Curb-To-Curb Width: 6.7m (22.0ft), Out-to-Out Width: 7.1m (23.3ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Channel: Good, Operating Rating: 54.0 metric tons, Inventory Rating: 32.4 metric tons, Structural Evaluation: Better than present minimum criteria, Deck Geometry: Meets minimum limits, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.52m (4.99ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2006, Bridge Improvement Cost: $348,000, Roadway Improvement Cost: $150,000, Total Project Cost: $498,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Preformed Fabric Find on map >>
Structure Number: 100307001503071, Location: 0.05 MI JCT TH 1 + US 5 (Lat: 44.516111, Lng: -72.009722), Route carried "on" structure: Other road C2001, Year Built: 1973, Status: Open, Structure Length: 0.91m (2.99ft), Average Daily Traffic: 860 (year 1998), Truck Traffic: 3%, Average Future Daily Traffic: 1,290 (year 2018), Design Load: HS 20, Features Intersected: SO WHEELOCK BRANCH Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Town or Township Highway Agency, Approaching Roadway Width: 8.5m (27.9ft), Skew: 1 degrees, Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 4.6m (15.1ft) Condition: Channel: Good, Culverts: Very good, Operating Rating: 54.0 metric tons, Inventory Rating: 32.4 metric tons, Structural Evaluation: Equal to present desirable criteria, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 0.91m (2.99ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2006, Bridge Improvement Cost: $155,000, Roadway Improvement Cost: $25,000, Total Project Cost: $180,000 ( Estimate for 2007) Find on map >>
Structure Number: 100307001703071, Location: 0.15 MI TO JCT W C3 TH75 (Lat: 44.509722, Lng: -71.963333), Route carried "on" structure: Other road C2002, Year Built: 1928, Status: Open, Structure Length: 1.49m (4.89ft), Average Daily Traffic: 650 (year 1998), Truck Traffic: 3%, Average Future Daily Traffic: 975 (year 2018), Design Load: H 10, Features Intersected: HAWKINS BROOK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Town or Township Highway Agency, Approaching Roadway Width: 7.0m (23.0ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 14.0m (45.9ft), Curb-To-Curb Width: 6.7m (22.0ft), Out-to-Out Width: 7.0m (23.0ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Channel: Satisfactory, Operating Rating: 59.4 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 35.1 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Meets minimum limits, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 2.38m (7.81ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2006, Bridge Improvement Cost: $536,000, Roadway Improvement Cost: $150,000, Total Project Cost: $686,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 100307003303071, Location: 0.08 MI TO JCT W CL2 TH1 (Lat: 44.516389, Lng: -72.016667), Route carried "on" structure: Other road C3058, Year Built: 1881, Year Reconstructed: 1980, Status: Posted for load, Structure Length: 2.10m (6.89ft), Average Daily Traffic: 400 (year 1998), Truck Traffic: 2%, Average Future Daily Traffic: 600 (year 2018), Features Intersected: SO. WHEELOCK BRANCH Minimum Vertical Clearance: 3.71m (12.17ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Town or Township Highway Agency, Approaching Roadway Width: 5.5m (18.0ft), Material/Design: Wood or Timber, Design/Construction: Truss - Thru, Number Of Spans In Main Unit: 1, Length of Maximum Span: 19.5m (64.0ft), Curb-To-Curb Width: 5.0m (16.4ft), Out-to-Out Width: 5.1m (16.7ft) Condition: Deck: Satisfactory, Superstructure: Fair, Substructure: Satisfactory, Channel: Very good, Operating Rating: 4.5 metric tons, Inventory Rating: 4.5 metric tons, Structural Evaluation: High priority of replacement, Deck Geometry: High priority of replacement, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present minimum criteria, Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below), Length Of Structure Improvement: 2.96m (9.71ft), Designated Inspection Frequency: Every 24 months, Inspection Date: September 2006, Bridge Improvement Cost: $478,000, Roadway Improvement Cost: $150,000, Total Project Cost: $628,000 ( Estimate for 2007), Deck Structure Type: Wood or Timber, Wearing Surface/Protective System: Wearing Surface: Wood or Timber, Deck Protection: Internally Sealed Find on map >>
Structure Number: 100307004203071, Location: 0.05 MI TO JCT W VT114 (Lat: 44.553611, Lng: -71.969444), Route carried "on" structure: Other road C3040, Year Built: 1965, Status: Open, Structure Length: 2.44m (8.01ft), Average Daily Traffic: 250 (year 1998), Truck Traffic: 15%, Average Future Daily Traffic: 375 (year 2018), Design Load: HS 20, Features Intersected: E.BR.PASSUMPSIC RIVER Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Town or Township Highway Agency, Approaching Roadway Width: 6.4m (21.0ft), Skew: 1 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 23.8m (78.1ft), Curb-To-Curb Width: 5.9m (19.4ft), Out-to-Out Width: 7.1m (23.3ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Channel: Good, Operating Rating: 81.9 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 49.5 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: High priority of corrective action, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 3.17m (10.40ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2006, Bridge Improvement Cost: $717,000, Roadway Improvement Cost: $150,000, Total Project Cost: $867,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 100307004303071, Location: 0.1 MI JCT TH 43 + TH 1 (Lat: 44.539167, Lng: -72.054722), Route carried "on" structure: Other road C3024, Year Built: 1956, Status: Open, Structure Length: 0.82m (2.69ft), Average Daily Traffic: 100 (year 1998), Truck Traffic: 2%, Average Future Daily Traffic: 150 (year 2018), Features Intersected: SO. WHEELOCK BRANCH Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Town or Township Highway Agency, Approaching Roadway Width: 6.4m (21.0ft), Skew: 1 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 7.6m (24.9ft), Curb-To-Curb Width: 5.5m (18.0ft), Out-to-Out Width: 6.1m (20.0ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Good, Channel: Good, Operating Rating: 30.6 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 19.8 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Meets minimum limits, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.49m (4.89ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2006, Bridge Improvement Cost: $288,000, Roadway Improvement Cost: $150,000, Total Project Cost: $438,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 100307004503071, Location: 0.1 MI TO JCT W VT122 (Lat: 44.565278, Lng: -72.042500), Route carried "on" structure: Other road C3026, Year Built: 1930, Year Reconstructed: 1996, Status: Open, Structure Length: 1.31m (4.30ft), Average Daily Traffic: 150 (year 1998), Truck Traffic: 2%, Average Future Daily Traffic: 225 (year 2018), Features Intersected: MILLERS RUN Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Town or Township Highway Agency, Approaching Roadway Width: 6.4m (21.0ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 12.5m (41.0ft), Curb or Sidewalk Widths: Left: 0.1m (0.3ft), Right: 0.1m (0.3ft), Curb-To-Curb Width: 6.2m (20.3ft), Out-to-Out Width: 6.8m (22.3ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Channel: Good, Operating Rating: 16.2 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 9.9 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: High priority of replacement, Deck Geometry: Meets minimum limits, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.10m (6.89ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2006, Bridge Improvement Cost: $454,000, Roadway Improvement Cost: $150,000, Total Project Cost: $604,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Preformed Fabric Find on map >>
Structure Number: 100307004603071, Location: 0.04 MI TO JCT W C3 TH96 (Lat: 44.554167, Lng: -72.033333), Route carried "on" structure: Other road C3031, Year Built: 1919, Year Reconstructed: 1974, Status: Open, Structure Length: 1.77m (5.81ft), Average Daily Traffic: 200 (year 1998), Truck Traffic: 2%, Average Future Daily Traffic: 300 (year 2018), Design Load: H 20, Features Intersected: MILLERS RUN Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Town or Township Highway Agency, Approaching Roadway Width: 7.3m (24.0ft), Skew: 1 degrees, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Number Of Spans In Main Unit: 1, Length of Maximum Span: 17.1m (56.1ft), Curb-To-Curb Width: 6.9m (22.6ft), Out-to-Out Width: 7.4m (24.3ft) Condition: Deck: Very good, Superstructure: Very good, Substructure: Very good, Channel: Good, Operating Rating: 25.2 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 13.5 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Meets minimum limits, Deck Geometry: Meets minimum limits, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 2.47m (8.10ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2006, Bridge Improvement Cost: $586,000, Roadway Improvement Cost: $150,000, Total Project Cost: $736,000 ( Estimate for 2007), Deck Structure Type: Concrete Precast Panels, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Preformed Fabric Find on map >>
Structure Number: 100307004703071, Location: @ JCT W VT114 (Lat: 44.549722, Lng: -71.986111), Route carried "on" structure: Other road C3036, Year Built: 1951, Year Reconstructed: 1975, Status: Open, Structure Length: 1.62m (5.31ft), Average Daily Traffic: 800 (year 1998), Truck Traffic: 2%, Average Future Daily Traffic: 1,200 (year 2018), Design Load: H 20, Features Intersected: E.BR.PASSUMPSIC R. Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Town or Township Highway Agency, Approaching Roadway Width: 7.0m (23.0ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 15.5m (50.9ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 7.9m (25.9ft) Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Satisfactory, Channel: Fair, Operating Rating: 31.5 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 18.0 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Meets minimum limits, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 2.26m (7.41ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2006, Bridge Improvement Cost: $571,000, Roadway Improvement Cost: $150,000, Total Project Cost: $721,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Preformed Fabric Find on map >>
Structure Number: 100307004903071, Location: AT JCT TH 82 + TH 57 (Lat: 44.515000, Lng: -72.013333), Route carried "on" structure: Other road C3082, Year Built: 1928, Status: Open, Structure Length: 0.98m (3.22ft), Average Daily Traffic: 200 (year 1998), Truck Traffic: 2%, Average Future Daily Traffic: 300 (year 2018), Features Intersected: SO. WHEELOCK BRANCH Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Town or Township Highway Agency, Approaching Roadway Width: 6.7m (22.0ft), Skew: 3 degrees, Material/Design: Concrete, Design/Construction: Tee Beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 9.1m (29.9ft), Curb-To-Curb Width: 6.1m (20.0ft), Out-to-Out Width: 7.0m (23.0ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Channel: Satisfactory, Operating Rating: 50.4 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 29.7 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Meets minimum limits, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.55m (5.09ft), Designated Inspection Frequency: Every 24 months, Inspection Date: September 2006, Bridge Improvement Cost: $347,000, Roadway Improvement Cost: $150,000, Total Project Cost: $497,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Preformed Fabric Find on map >>
Structure Number: 100307005003071, Location: 0.1 MI TO JCT W CL2 TH2 (Lat: 44.522500, Lng: -71.956667), Route carried "on" structure: Other road C3045, Year Built: 1928, Status: Open, Structure Length: 1.01m (3.31ft), Average Daily Traffic: 100 (year 1998), Truck Traffic: 2%, Average Future Daily Traffic: 150 (year 2018), Features Intersected: HAWKINS BROOK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Town or Township Highway Agency, Approaching Roadway Width: 5.5m (18.0ft), Skew: 2 degrees, Material/Design: Concrete, Design/Construction: Tee Beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 8.5m (27.9ft), Curb-To-Curb Width: 6.4m (21.0ft), Out-to-Out Width: 6.9m (22.6ft) Condition: Deck: Good, Superstructure: Very good, Substructure: Satisfactory, Channel: Good, Operating Rating: 54.0 metric tons, Inventory Rating: 32.4 metric tons, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 1.62m (5.31ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2006, Bridge Improvement Cost: $352,000, Roadway Improvement Cost: $150,000, Total Project Cost: $502,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Preformed Fabric Find on map >>
Structure Number: 100307005203071, Location: 0.05 MI JCT TH 1 + TH 52 (Lat: 44.529444, Lng: -72.042500), Route carried "on" structure: Other road C3046, Year Built: 1919, Year Reconstructed: 1947, Status: Open, Structure Length: 0.88m (2.89ft), Average Daily Traffic: 250 (year 1998), Truck Traffic: 2%, Average Future Daily Traffic: 375 (year 2018), Features Intersected: SO WHEELOCK BRANCH Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Town or Township Highway Agency, Approaching Roadway Width: 7.0m (23.0ft), Material/Design: Concrete, Design/Construction: Slab, Number Of Spans In Main Unit: 1, Length of Maximum Span: 7.9m (25.9ft), Curb-To-Curb Width: 6.5m (21.3ft), Out-to-Out Width: 6.9m (22.6ft) Condition: Deck: Good, Superstructure: Good, Substructure: Satisfactory, Channel: Satisfactory, Operating Rating: 54.0 metric tons, Inventory Rating: 32.4 metric tons, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Meets minimum limits, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.58m (5.18ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2006, Bridge Improvement Cost: $352,000, Roadway Improvement Cost: $150,000, Total Project Cost: $502,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Preformed Fabric Find on map >>
Structure Number: 100307005403071, Location: 0.05 MI TO JCT W CL2 TH2 (Lat: 44.504722, Lng: -71.987778), Route carried "on" structure: Other road C3069, Year Built: 1978, Status: Open, Structure Length: 1.01m (3.31ft), Average Daily Traffic: 150 (year 1998), Truck Traffic: 2%, Average Future Daily Traffic: 225 (year 2018), Design Load: HS 20, Features Intersected: SHELDON BROOK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Town or Township Highway Agency, Approaching Roadway Width: 7.6m (24.9ft), Material/Design: Concrete, Design/Construction: Slab, Number Of Spans In Main Unit: 1, Length of Maximum Span: 9.4m (30.8ft), Curb or Sidewalk Widths: Left: 0.1m (0.3ft), Right: 0.1m (0.3ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 7.8m (25.6ft) Condition: Deck: Very good, Superstructure: Very good, Substructure: Very good, Channel: Very good, Operating Rating: 64.8 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 33.3 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.62m (5.31ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2006, Bridge Improvement Cost: $400,000, Roadway Improvement Cost: $150,000, Total Project Cost: $550,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Preformed Fabric Find on map >>
Structure Number: 100307005603071, Location: 0.5 MI JCT TH 1 + TH 24 (Lat: 44.537500, Lng: -72.066389), Route carried "on" structure: Other road C2001, Year Built: 1940, Year Reconstructed: 1989, Status: Open, Structure Length: 1.46m (4.79ft), Average Daily Traffic: 860 (year 1998), Truck Traffic: 3%, Average Future Daily Traffic: 1,290 (year 2018), Design Load: H 15, Features Intersected: SO. WHEELOCK BRANCH Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Town or Township Highway Agency, Approaching Roadway Width: 7.9m (25.9ft), Skew: 2 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 13.7m (44.9ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 6.5m (21.3ft), Out-to-Out Width: 6.9m (22.6ft) Condition: Deck: Very good, Superstructure: Satisfactory, Substructure: Satisfactory, Channel: Good, Operating Rating: 17.1 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 6.3 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: High priority of replacement, Deck Geometry: High priority of corrective action, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 2.35m (7.71ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2006, Bridge Improvement Cost: $518,000, Roadway Improvement Cost: $150,000, Total Project Cost: $668,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Preformed Fabric Find on map >>
Structure Number: 200091009403072, Location: 0.1 MI N EXIT 23 I 91 (Lat: 44.519444, Lng: -72.007222), Route carried "on" structure: Interstate 91, Year Built: 1972, Status: Open, Structure Length: 0.94m (3.08ft), Average Daily Traffic: 4,600 (year 1998), Truck Traffic: 13%, Average Future Daily Traffic: 6,900 (year 2018), Design Load: HS 20, Features Intersected: S. WHEELOCK BR PASM R Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 221.575, Lanes on structure: 6, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 23.2m (76.1ft), Skew: 11 degrees, Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 4.6m (15.1ft) Condition: Channel: Good, Culverts: Good, Operating Rating: 54.0 metric tons, Inventory Rating: 32.4 metric tons, Structural Evaluation: Better than present minimum criteria, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 0.94m (3.08ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2006, Bridge Improvement Cost: $436,000, Roadway Improvement Cost: $25,000, Total Project Cost: $461,000 ( Estimate for 2007) Find on map >>
Structure Number: 200091092N03072, Location: 0.5 MI S EXIT 23 (Lat: 44.509444, Lng: -72.011667), Route carried "on" structure: Interstate 91, Year Built: 1974, Status: Open, Structure Length: 6.74m (22.11ft), Average Daily Traffic: 4,350 (year 1998), Truck Traffic: 13%, Average Future Daily Traffic: 6,525 (year 2018), Design Load: Railroad, Features Intersected: I 91 OVER US 5 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 219.709, Lanes on structure: 2, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 11.6m (38.1ft), Skew: 14 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Length of Maximum Span: 39.9m (130.9ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 12.0m (39.4ft), Out-to-Out Width: 13.3m (43.6ft) Condition: Deck: Very good, Superstructure: Very good, Substructure: Good, Operating Rating: 80.1 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 44.1 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Equal to present minimum criteria, Underclear: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 7.41m (24.31ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2006, Bridge Improvement Cost: $2,781,000, Roadway Improvement Cost: $150,000, Total Project Cost: $2,931,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Preformed Fabric Find on map >>
Structure Number: 200091092S03072, Location: 0.5 MI S EXIT 23 (Lat: 44.509722, Lng: -72.011667), Route carried "on" structure: Interstate 91, Year Built: 1974, Status: Open, Structure Length: 8.78m (28.81ft), Average Daily Traffic: 4,350 (year 1998), Truck Traffic: 13%, Average Future Daily Traffic: 6,525 (year 2018), Design Load: HS 20, Features Intersected: I 91 OVER US 5 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 219.709, Lanes on structure: 2, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 11.6m (38.1ft), Skew: 13 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Length of Maximum Span: 54.9m (180.1ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 12.1m (39.7ft), Out-to-Out Width: 13.3m (43.6ft) Condition: Deck: Very good, Superstructure: Very good, Substructure: Good, Operating Rating: 79.2 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 39.6 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Equal to present minimum criteria, Underclear: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 9.66m (31.69ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2006, Bridge Improvement Cost: $3,624,000, Roadway Improvement Cost: $150,000, Total Project Cost: $3,774,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Preformed Fabric Find on map >>
Structure Number: 200091093N03072, Location: I 91 EXIT 23 (Lat: 44.516944, Lng: -72.006667), Route carried "on" structure: Interstate 91, Year Built: 1974, Status: Open, Structure Length: 3.38m (11.09ft), Average Daily Traffic: 2,300 (year 1998), Truck Traffic: 13%, Average Future Daily Traffic: 3,450 (year 2018), Design Load: HS 20, Features Intersected: I 91 OVER US 5 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 220.642, Lanes on structure: 2, Lanes under structure: 3, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 11.6m (38.1ft), Skew: 15 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 32.0m (105.0ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 12.0m (39.4ft), Out-to-Out Width: 13.2m (43.3ft) Condition: Deck: Very good, Superstructure: Good, Substructure: Good, Operating Rating: 89.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 60.3 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Equal to present minimum criteria, Underclear: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 4.05m (13.29ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2006, Bridge Improvement Cost: $1,520,000, Roadway Improvement Cost: $150,000, Total Project Cost: $1,670,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Preformed Fabric Find on map >>
Structure Number: 200091093S03072, Location: I 91 EXIT 23 (Lat: 44.516667, Lng: -72.006944), Route carried "on" structure: Interstate 91, Year Built: 1974, Status: Open, Structure Length: 3.47m (11.38ft), Average Daily Traffic: 2,300 (year 1998), Truck Traffic: 13%, Average Future Daily Traffic: 3,450 (year 2018), Design Load: HS 20, Features Intersected: I 91 OVER US 5 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 220.642, Lanes on structure: 3, Lanes under structure: 3, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 11.6m (38.1ft), Skew: 14 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 32.9m (107.9ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 13.7m (44.9ft), Out-to-Out Width: 15.1m (49.5ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 89.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 61.2 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: High priority of corrective action, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 4.18m (13.71ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2006, Bridge Improvement Cost: $1,777,000, Roadway Improvement Cost: $150,000, Total Project Cost: $1,927,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Preformed Fabric Find on map >>
Structure Number: 200091095N03072, Location: 1.7 MI N EXIT 23 I91 (Lat: 44.538333, Lng: -72.018889), Route carried "on" structure: Interstate 91, Year Built: 1972, Status: Open, Structure Length: 4.57m (14.99ft), Average Daily Traffic: 2,300 (year 1998), Truck Traffic: 16%, Average Future Daily Traffic: 3,450 (year 2018), Design Load: HS 20, Features Intersected: I 91 OVER TH NO 9 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 223.233, Lanes on structure: 2, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 11.9m (39.0ft), Skew: 12 degrees, Material/Design: Steel continuous, Design/Construction: Frame, Number Of Spans In Main Unit: 3, Length of Maximum Span: 21.3m (69.9ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 12.0m (39.4ft), Out-to-Out Width: 13.2m (43.3ft) Condition: Deck: Good, Superstructure: Very good, Substructure: Very good, Operating Rating: 59.4 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 38.7 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Equal to present minimum criteria, Underclear: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 5.49m (18.01ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2006, Bridge Improvement Cost: $2,050,000, Roadway Improvement Cost: $150,000, Total Project Cost: $2,200,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Preformed Fabric Find on map >>
Structure Number: 200091095S03072, Location: 1.7 MI N EXIT 23 I 91 (Lat: 44.538333, Lng: -72.019722), Route carried "on" structure: Interstate 91, Year Built: 1972, Status: Open, Structure Length: 4.57m (14.99ft), Average Daily Traffic: 2,300 (year 1998), Truck Traffic: 13%, Average Future Daily Traffic: 3,450 (year 2018), Design Load: HS 20, Features Intersected: I 91 OVER TH NO 9 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 223.233, Lanes on structure: 2, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 11.6m (38.1ft), Skew: 12 degrees, Material/Design: Steel continuous, Design/Construction: Frame, Number Of Spans In Main Unit: 3, Length of Maximum Span: 21.3m (69.9ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 11.8m (38.7ft), Out-to-Out Width: 13.2m (43.3ft) Condition: Deck: Very good, Superstructure: Very good, Substructure: Very good, Operating Rating: 59.4 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 38.7 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Equal to present minimum criteria, Underclear: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 5.49m (18.01ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2006, Bridge Improvement Cost: $2,055,000, Roadway Improvement Cost: $150,000, Total Project Cost: $2,205,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Preformed Fabric Find on map >>
Structure Number: 200091096N03072, Location: 0.2 MI S EXIT 24 I 91 (Lat: 44.553056, Lng: -72.028611), Route carried "on" structure: Interstate 91, Year Built: 1972, Status: Open, Structure Length: 7.50m (24.61ft), Average Daily Traffic: 2,300 (year 1998), Truck Traffic: 13%, Average Future Daily Traffic: 3,450 (year 2018), Design Load: HS 20, Features Intersected: I 91 OVER VT 122 MLR RUN Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 225.083, Lanes on structure: 2, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 11.9m (39.0ft), Skew: 12 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 24.7m (81.0ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 11.9m (39.0ft), Out-to-Out Width: 13.2m (43.3ft) Condition: Deck: Good, Superstructure: Very good, Substructure: Good, Channel: Good, Operating Rating: 68.4 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 42.3 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Equal to present minimum criteria, Underclear: Equal to present minimum criteria, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 8.26m (27.10ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2006, Bridge Improvement Cost: $3,089,000, Roadway Improvement Cost: $150,000, Total Project Cost: $3,239,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Preformed Fabric Find on map >>
Structure Number: 200091096S03072, Location: 0.2 MI S EXIT 24 I91 (Lat: 44.553333, Lng: -72.028889), Route carried "on" structure: Interstate 91, Year Built: 1972, Status: Open, Structure Length: 7.50m (24.61ft), Average Daily Traffic: 2,300 (year 1998), Truck Traffic: 13%, Average Future Daily Traffic: 3,450 (year 2018), Design Load: HS 20, Features Intersected: I 91 OVER VT 122 MLR RUN Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 225.083, Lanes on structure: 2, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 11.9m (39.0ft), Skew: 12 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 24.7m (81.0ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 12.0m (39.4ft), Out-to-Out Width: 13.2m (43.3ft) Condition: Deck: Good, Superstructure: Very good, Substructure: Good, Channel: Good, Operating Rating: 68.4 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 42.3 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Equal to present minimum criteria, Underclear: Equal to present minimum criteria, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 8.26m (27.10ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2006, Bridge Improvement Cost: $3,082,000, Roadway Improvement Cost: $150,000, Total Project Cost: $3,232,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Preformed Fabric Find on map >>
Structure Number: 200091097N03072, Location: 1.3 MI N EXIT 24 I91 (Lat: 44.572778, Lng: -72.041667), Route carried "on" structure: Interstate 91, Year Built: 1972, Status: Open, Structure Length: 0.98m (3.22ft), Average Daily Traffic: 2,200 (year 1998), Truck Traffic: 13%, Average Future Daily Traffic: 3,300 (year 2018), Design Load: HS 20, Features Intersected: I 91 OVER TH NO 9 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 227.690, Lanes on structure: 2, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 11.9m (39.0ft), Skew: 11 degrees, Material/Design: Concrete, Design/Construction: Tee Beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 9.1m (29.9ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 12.0m (39.4ft), Out-to-Out Width: 13.2m (43.3ft) Condition: Deck: Good, Superstructure: Very good, Substructure: Good, Operating Rating: 77.4 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 45.9 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Equal to present minimum criteria, Underclear: High priority of replacement, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.55m (5.09ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2006, Bridge Improvement Cost: $584,000, Roadway Improvement Cost: $150,000, Total Project Cost: $734,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Preformed Fabric Find on map >>
Structure Number: 200091097S03072, Location: 1.3 MI N EXIT 24 I91 (Lat: 44.571944, Lng: -72.042500), Route carried "on" structure: Interstate 91, Year Built: 1972, Status: Open, Structure Length: 0.98m (3.22ft), Average Daily Traffic: 2,200 (year 1998), Truck Traffic: 13%, Average Future Daily Traffic: 3,300 (year 2018), Design Load: HS 20, Features Intersected: I 91 OVER TH NO 9 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 227.690, Lanes on structure: 2, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 11.6m (38.1ft), Skew: 10 degrees, Material/Design: Concrete, Design/Construction: Tee Beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 9.1m (29.9ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 12.0m (39.4ft), Out-to-Out Width: 13.2m (43.3ft) Condition: Deck: Very good, Superstructure: Very good, Substructure: Good, Operating Rating: 77.4 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 45.9 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Equal to present minimum criteria, Underclear: High priority of replacement, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.55m (5.09ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2006, Bridge Improvement Cost: $583,000, Roadway Improvement Cost: $150,000, Total Project Cost: $733,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Preformed Fabric Find on map >>
Structure Number: 200113014103072, Location: 1.2 MI S JCT. VT.122 (Lat: 44.518333, Lng: -72.003611), Route carried "on" structure: US 5, Year Built: 1972, Status: Open, Structure Length: 5.24m (17.19ft), Average Daily Traffic: 13,100 (year 1998), Truck Traffic: 6%, Average Future Daily Traffic: 19,650 (year 2018), Design Load: HS 20, Features Intersected: PASSUMPSIC RIVER Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 4, Owner: State Highway Agency, Approaching Roadway Width: 15.2m (49.9ft), Skew: 1 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Length of Maximum Span: 25.9m (85.0ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 1.7m (5.6ft), Curb-To-Curb Width: 15.8m (51.8ft), Out-to-Out Width: 18.5m (60.7ft) Condition: Deck: Good, Superstructure: Very good, Substructure: Good, Channel: Good, Operating Rating: 54.9 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 32.4 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Meets minimum limits, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 6.28m (20.60ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2007, Bridge Improvement Cost: $3,300,000, Roadway Improvement Cost: $150,000, Total Project Cost: $3,450,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Preformed Fabric Find on map >>
Structure Number: 200113014403072, Location: 0.1 MI S JCT. VT.114 (Lat: 44.543889, Lng: -72.000278), Route carried "on" structure: US 5, Year Built: 1930, Year Reconstructed: 1969, Status: Open, Structure Length: 4.48m (14.70ft), Average Daily Traffic: 6,600 (year 1998), Truck Traffic: 6%, Average Future Daily Traffic: 9,900 (year 2018), Design Load: HS 20, Features Intersected: PASSUMPSIC RIVER Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 13.7m (44.9ft), Skew: 3 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 14.3m (46.9ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 1.5m (4.9ft), Curb-To-Curb Width: 15.4m (50.5ft), Out-to-Out Width: 16.0m (52.5ft) Condition: Deck: Good, Superstructure: Satisfactory, Substructure: Fair, Channel: Satisfactory, Operating Rating: 73.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 44.1 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Superior to present desirable criteria, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 5.36m (17.59ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2007, Bridge Improvement Cost: $2,436,000, Roadway Improvement Cost: $150,000, Total Project Cost: $2,586,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Preformed Fabric Find on map >>
Structure Number: 200113014703072, Location: 2.8 MI N JCT. VT.114 (Lat: 44.580833, Lng: -71.984444), Route carried "on" structure: US 5, Year Built: 1956, Status: Open, Structure Length: 1.65m (5.41ft), Average Daily Traffic: 3,100 (year 1998), Truck Traffic: 6%, Average Future Daily Traffic: 4,650 (year 2018), Design Load: H 20, Features Intersected: CALENDAR BROOK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 9.4m (30.8ft), Skew: 1 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 15.8m (51.8ft), Curb or Sidewalk Widths: Left: 0.1m (0.3ft), Right: 0.1m (0.3ft), Curb-To-Curb Width: 9.4m (30.8ft), Out-to-Out Width: 10.5m (34.4ft) Condition: Deck: Fair, Superstructure: Good, Substructure: Satisfactory, Channel: Good, Operating Rating: 37.8 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 22.5 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Meets minimum limits, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.32m (7.61ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2007, Bridge Improvement Cost: $684,000, Roadway Improvement Cost: $150,000, Total Project Cost: $834,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Preformed Fabric Find on map >>
Structure Number: 200260000403072, Location: 1.0 M1 W JCT US.5 (Lat: 44.541944, Lng: -72.010000), Route carried "on" structure: State highway 122, Year Built: 1900, Year Reconstructed: 1995, Status: Posted for load-capacity, Structure Length: 1.86m (6.10ft), Average Daily Traffic: 2,400 (year 1998), Truck Traffic: 6%, Average Future Daily Traffic: 3,600 (year 2018), Design Load: HS 20, Features Intersected: MILLERS RUN Minimum Vertical Clearance: 3.58m (11.75ft), Kilometerpoint: 0.000, Lanes on structure: 1, Owner: Town or Township Highway Agency, Approaching Roadway Width: 7.3m (24.0ft), Material/Design: Steel, Design/Construction: Truss - Thru, Number Of Spans In Main Unit: 1, Length of Maximum Span: 15.5m (50.9ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 1.7m (5.6ft), Curb-To-Curb Width: 4.4m (14.4ft), Out-to-Out Width: 4.8m (15.7ft) Condition: Deck: Very good, Superstructure: Very good, Substructure: Very good, Channel: Satisfactory, Operating Rating: 51.3 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 35.1 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Equal to present desirable criteria, Deck Geometry: High priority of replacement, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 2.59m (8.50ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2007, Bridge Improvement Cost: $350,000, Roadway Improvement Cost: $150,000, Total Project Cost: $500,000 ( Estimate for 2007), Deck Structure Type: Wood or Timber, Wearing Surface/Protective System: Wearing Surface: Wood or Timber, Deck Protection: Internally Sealed Find on map >>
Structure Number: 200263001603072, Location: 1.6 MI E JCT. U.S.5 (Lat: 44.503333, Lng: -71.981667), Route carried "on" structure: County highway 6, Year Built: 1928, Year Reconstructed: 1991, Status: Open, Structure Length: 1.31m (4.30ft), Average Daily Traffic: 1,890 (year 1995), Truck Traffic: 6%, Average Future Daily Traffic: 2,835 (year 2015), Features Intersected: SHELDON BROOK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Town or Township Highway Agency, Approaching Roadway Width: 6.7m (22.0ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 12.5m (41.0ft), Curb-To-Curb Width: 6.6m (21.7ft), Out-to-Out Width: 6.9m (22.6ft) Condition: Deck: Good, Superstructure: Satisfactory, Substructure: Satisfactory, Channel: Satisfactory, Operating Rating: 30.6 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 16.2 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Meets minimum limits, Deck Geometry: High priority of replacement, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.10m (6.89ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2006, Bridge Improvement Cost: $409,000, Roadway Improvement Cost: $150,000, Total Project Cost: $559,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Preformed Fabric Find on map >>
Structure Number: 200269000103072, Location: 0.4 MI N JCT. U.S.5 (Lat: 44.549167, Lng: -71.995556), Route carried "on" structure: State highway 114, Year Built: 1987, Status: Open, Structure Length: 5.43m (17.81ft), Average Daily Traffic: 4,100 (year 1998), Truck Traffic: 6%, Average Future Daily Traffic: 6,150 (year 2018), Design Load: HS 25, Features Intersected: PASSUMPSIC RIVER Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 10.4m (34.1ft), Skew: 4 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Length of Maximum Span: 26.2m (86.0ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 10.2m (33.5ft), Out-to-Out Width: 11.2m (36.7ft) Condition: Deck: Very good, Superstructure: Very good, Substructure: Good, Channel: Satisfactory, Operating Rating: 66.6 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 42.3 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Meets minimum limits, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 6.52m (21.39ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2007, Bridge Improvement Cost: $2,062,000, Roadway Improvement Cost: $150,000, Total Project Cost: $2,212,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Preformed Fabric, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 200269000203072, Location: 0.6 MI N JCT. U.S.5 (Lat: 44.549444, Lng: -71.991389), Route carried "on" structure: State highway 114, Year Built: 2007, Status: Open, Structure Length: 3.05m (10.01ft), Average Daily Traffic: 4,200 (year 1997), Truck Traffic: 4%, Average Future Daily Traffic: 6,300 (year 2017), Design Load: HS 25, Features Intersected: PASSUMPSIC RIVER Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 9.8m (32.2ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 29.6m (97.1ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 10.2m (33.5ft), Out-to-Out Width: 11.1m (36.4ft) Condition: Deck: Very good, Superstructure: Very good, Substructure: Very good, Channel: Very good, Operating Rating: 75.6 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 45.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Meets minimum limits, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 3.66m (12.01ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2007, Bridge Improvement Cost: $1,149,000, Roadway Improvement Cost: $150,000, Total Project Cost: $1,299,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Preformed Fabric, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 200269000803072, Location: 2.1 MI N JCT. U.S.5 (Lat: 44.559444, Lng: -71.963889), Route carried "on" structure: State highway 114, Year Built: 2006, Status: Open, Structure Length: 2.90m (9.51ft), Average Daily Traffic: 4,300 (year 2005), Truck Traffic: 7%, Average Future Daily Traffic: 6,450 (year 2025), Design Load: HS 25, Features Intersected: E. BR. PASSUMPSIC RIVER Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 9.4m (30.8ft), Skew: 2 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 28.3m (92.8ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 9.4m (30.8ft), Out-to-Out Width: 10.5m (34.4ft) Condition: Deck: Very good, Superstructure: Very good, Substructure: Very good, Channel: Very good, Operating Rating: 84.6 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 50.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Meets minimum limits, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 3.47m (11.38ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2007, Bridge Improvement Cost: $1,031,000, Roadway Improvement Cost: $150,000, Total Project Cost: $1,181,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Preformed Fabric, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 200091092N03072, Location: 2.2 MI S JCT VT 122 (Lat: 44.509444, Lng: -72.011667), Route carried "under" structure: US 5, Year Built: 1974, Structure Length: 6.74m (22.11ft), Average Daily Traffic: 5,700 (year 1998), Truck Traffic: 6%, Features Intersected: I 91 OVER US RTE 5, Facility Carried by Structure: I 00091 ML Minimum Vertical Clearance: 8.71m (28.58ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 39.9m (130.9ft) Find on map >>
Structure Number: 200091092S03072, Location: 2.2 MI S JCT VT 122 (Lat: 44.509722, Lng: -72.011667), Route carried "under" structure: US 5, Year Built: 1974, Structure Length: 6.74m (22.11ft), Average Daily Traffic: 5,700 (year 1998), Truck Traffic: 6%, Features Intersected: I 91 OVER US RTE 5, Facility Carried by Structure: I 00091 ML Minimum Vertical Clearance: 8.31m (27.26ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 39.9m (130.9ft) Find on map >>
Structure Number: 200091093N03072, Location: 1.6 MI S JCT VT 122 (Lat: 44.516944, Lng: -72.006667), Route carried "under" structure: US 5, Year Built: 1974, Structure Length: 3.38m (11.09ft), Average Daily Traffic: 8,250 (year 1998), Truck Traffic: 6%, Features Intersected: I 91 OVER US RTE 5, Facility Carried by Structure: I 00091 ML Minimum Vertical Clearance: 4.55m (14.93ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 3, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 32.0m (105.0ft) Find on map >>
Structure Number: 200091093S03072, Location: 1.6 MI S JCT VT 122 (Lat: 44.516667, Lng: -72.006944), Route carried "under" structure: US 5, Year Built: 1974, Structure Length: 3.38m (11.09ft), Average Daily Traffic: 8,250 (year 1998), Truck Traffic: 6%, Features Intersected: I 91 OVER US RTE 5, Facility Carried by Structure: I 00091 ML Minimum Vertical Clearance: 4.39m (14.40ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 3, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 32.0m (105.0ft) Find on map >>
Structure Number: 200091096N03072, Location: 1.8 MI W JCT US 5 (Lat: 44.553056, Lng: -72.028611), Route carried "under" structure: State highway 122, Year Built: 1972, Structure Length: 7.50m (24.61ft), Average Daily Traffic: 2,000 (year 1998), Truck Traffic: 6%, Features Intersected: I 91 OVER VT122 & MLR R, Facility Carried by Structure: I 00091 ML Minimum Vertical Clearance: 4.62m (15.16ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 24.7m (81.0ft) Find on map >>
Structure Number: 200091096S03072, Location: 1.8 MI W JCT US 5 (Lat: 44.553333, Lng: -72.028889), Route carried "under" structure: State highway 122, Year Built: 1972, Structure Length: 7.50m (24.61ft), Average Daily Traffic: 2,000 (year 1998), Truck Traffic: 6%, Features Intersected: I 91 OVER VT122 & MLR R, Facility Carried by Structure: I 00091 ML Minimum Vertical Clearance: 4.65m (15.26ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 24.7m (81.0ft) Discuss this city on our hugely popular Vermont forum Back to: Lyndon, VT, Vermont, All US cities.
|
![]() |