National Bridge Inventory (NBI) Statistics
Number of bridges: 41
Total length: 130 meters (427ft)
Total costs: $44,802,000
Total average daily traffic: 110,020
Total average daily truck traffic: 8,628
National Bridge Inventory (NBI) Registered Bridges for Lyndon

New bridges - Historical Statistics

  • Before 1900: 1
  • 1900-1909: 1
  • 1910-1919: 2
  • 1920-1929: 5
  • 1930-1939: 2
  • 1940-1949: 2
  • 1950-1959: 4
  • 1960-1969: 1
  • 1970-1979: 20
  • 1980-1989: 1
  • 1990-1999: 0
  • 2000-2009: 2

Reconstructed bridges - Historical Statistics

  • 1940-1949: 1
  • 1950-1959: 0
  • 1960-1969: 2
  • 1970-1979: 1
  • 1980-1989: 4
  • 1990-1999: 2

Average Daily Traffic

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Bridge Condition - Culverts

Find on map >>

Structure Number: 100307001203071,  Location: 0.3 MI JCT TH 1 + TH 32 (Lat: 44.535278,  Lng: -72.047778),  Route carried "on" structure: Other road C2001,  Year Built: 1949,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 860 (year 1998),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,290 (year 2018),  Design Load: H 20,  Features Intersected: SO. WHEELOCK BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.25m (4.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2006,  Bridge Improvement Cost: $325,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $475,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 100307001303071,  Location: 0.65 MI TO JCT W CL2 TH6 (Lat: 44.506667,  Lng: -71.968056),  Route carried "on" structure: Other road C2002,  Year Built: 1953,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 700 (year 1998),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,050 (year 2018),  Design Load: H 20,  Features Intersected: HAWKINS BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 38.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.37m (4.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2006,  Bridge Improvement Cost: $373,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $523,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 100307001403071,  Location: 0.25 MI TO JCT W C3 TH45 (Lat: 44.520000,  Lng: -71.951944),  Route carried "on" structure: Other road C2002,  Year Built: 1928,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 400 (year 1998),  Truck Traffic: 3%,  Average Future Daily Traffic: 600 (year 2018),  Design Load: H 10,  Features Intersected: HAWKINS BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.1m (23.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 54.0 metric tons,  Inventory Rating: 32.4 metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2006,  Bridge Improvement Cost: $348,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $498,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 100307001503071,  Location: 0.05 MI JCT TH 1 + US 5 (Lat: 44.516111,  Lng: -72.009722),  Route carried "on" structure: Other road C2001,  Year Built: 1973,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 860 (year 1998),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,290 (year 2018),  Design Load: HS 20,  Features Intersected: SO WHEELOCK BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.6m (15.1ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 54.0 metric tons,  Inventory Rating: 32.4 metric tons,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2006,  Bridge Improvement Cost: $155,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $180,000 ( Estimate for 2007)
Find on map >>

Structure Number: 100307001703071,  Location: 0.15 MI TO JCT W C3 TH75 (Lat: 44.509722,  Lng: -71.963333),  Route carried "on" structure: Other road C2002,  Year Built: 1928,  Status: Open,  Structure Length: 1.49m (4.89ft),  Average Daily Traffic: 650 (year 1998),  Truck Traffic: 3%,  Average Future Daily Traffic: 975 (year 2018),  Design Load: H 10,  Features Intersected: HAWKINS BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.0m (45.9ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.0m (23.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 59.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.38m (7.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2006,  Bridge Improvement Cost: $536,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $686,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 100307003303071,  Location: 0.08 MI TO JCT W CL2 TH1 (Lat: 44.516389,  Lng: -72.016667),  Route carried "on" structure: Other road C3058,  Year Built: 1881,  Year Reconstructed: 1980,  Status: Posted for load,  Structure Length: 2.10m (6.89ft),  Average Daily Traffic: 400 (year 1998),  Truck Traffic: 2%,  Average Future Daily Traffic: 600 (year 2018),  Features Intersected: SO. WHEELOCK BRANCH
Minimum Vertical Clearance: 3.71m (12.17ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Wood or Timber,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.5m (64.0ft),  Curb-To-Curb Width: 5.0m (16.4ft),  Out-to-Out Width: 5.1m (16.7ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 4.5 metric tons,  Inventory Rating: 4.5 metric tons,  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 2.96m (9.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2006,  Bridge Improvement Cost: $478,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $628,000 ( Estimate for 2007),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber,  Deck Protection: Internally Sealed
Find on map >>

Structure Number: 100307004203071,  Location: 0.05 MI TO JCT W VT114 (Lat: 44.553611,  Lng: -71.969444),  Route carried "on" structure: Other road C3040,  Year Built: 1965,  Status: Open,  Structure Length: 2.44m (8.01ft),  Average Daily Traffic: 250 (year 1998),  Truck Traffic: 15%,  Average Future Daily Traffic: 375 (year 2018),  Design Load: HS 20,  Features Intersected: E.BR.PASSUMPSIC RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.8m (78.1ft),  Curb-To-Curb Width: 5.9m (19.4ft),  Out-to-Out Width: 7.1m (23.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 81.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.17m (10.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2006,  Bridge Improvement Cost: $717,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $867,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 100307004303071,  Location: 0.1 MI JCT TH 43 + TH 1 (Lat: 44.539167,  Lng: -72.054722),  Route carried "on" structure: Other road C3024,  Year Built: 1956,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 100 (year 1998),  Truck Traffic: 2%,  Average Future Daily Traffic: 150 (year 2018),  Features Intersected: SO. WHEELOCK BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 30.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 19.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.49m (4.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2006,  Bridge Improvement Cost: $288,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $438,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 100307004503071,  Location: 0.1 MI TO JCT W VT122 (Lat: 44.565278,  Lng: -72.042500),  Route carried "on" structure: Other road C3026,  Year Built: 1930,  Year Reconstructed: 1996,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 150 (year 1998),  Truck Traffic: 2%,  Average Future Daily Traffic: 225 (year 2018),  Features Intersected: MILLERS RUN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.5m (41.0ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 6.2m (20.3ft),  Out-to-Out Width: 6.8m (22.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 16.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 9.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of replacement,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.10m (6.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2006,  Bridge Improvement Cost: $454,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $604,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 100307004603071,  Location: 0.04 MI TO JCT W C3 TH96 (Lat: 44.554167,  Lng: -72.033333),  Route carried "on" structure: Other road C3031,  Year Built: 1919,  Year Reconstructed: 1974,  Status: Open,  Structure Length: 1.77m (5.81ft),  Average Daily Traffic: 200 (year 1998),  Truck Traffic: 2%,  Average Future Daily Traffic: 300 (year 2018),  Design Load: H 20,  Features Intersected: MILLERS RUN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.1m (56.1ft),  Curb-To-Curb Width: 6.9m (22.6ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 25.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 13.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.47m (8.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2006,  Bridge Improvement Cost: $586,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $736,000 ( Estimate for 2007),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 100307004703071,  Location: @ JCT W VT114 (Lat: 44.549722,  Lng: -71.986111),  Route carried "on" structure: Other road C3036,  Year Built: 1951,  Year Reconstructed: 1975,  Status: Open,  Structure Length: 1.62m (5.31ft),  Average Daily Traffic: 800 (year 1998),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,200 (year 2018),  Design Load: H 20,  Features Intersected: E.BR.PASSUMPSIC R.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.5m (50.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 31.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 18.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.26m (7.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2006,  Bridge Improvement Cost: $571,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $721,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 100307004903071,  Location: AT JCT TH 82 + TH 57 (Lat: 44.515000,  Lng: -72.013333),  Route carried "on" structure: Other road C3082,  Year Built: 1928,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 200 (year 1998),  Truck Traffic: 2%,  Average Future Daily Traffic: 300 (year 2018),  Features Intersected: SO. WHEELOCK BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 7.0m (23.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 50.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 29.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.55m (5.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2006,  Bridge Improvement Cost: $347,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $497,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 100307005003071,  Location: 0.1 MI TO JCT W CL2 TH2 (Lat: 44.522500,  Lng: -71.956667),  Route carried "on" structure: Other road C3045,  Year Built: 1928,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 100 (year 1998),  Truck Traffic: 2%,  Average Future Daily Traffic: 150 (year 2018),  Features Intersected: HAWKINS BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 6.4m (21.0ft),  Out-to-Out Width: 6.9m (22.6ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 54.0 metric tons,  Inventory Rating: 32.4 metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.62m (5.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2006,  Bridge Improvement Cost: $352,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $502,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 100307005203071,  Location: 0.05 MI JCT TH 1 + TH 52 (Lat: 44.529444,  Lng: -72.042500),  Route carried "on" structure: Other road C3046,  Year Built: 1919,  Year Reconstructed: 1947,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 250 (year 1998),  Truck Traffic: 2%,  Average Future Daily Traffic: 375 (year 2018),  Features Intersected: SO WHEELOCK BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 6.5m (21.3ft),  Out-to-Out Width: 6.9m (22.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 54.0 metric tons,  Inventory Rating: 32.4 metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.58m (5.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2006,  Bridge Improvement Cost: $352,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $502,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 100307005403071,  Location: 0.05 MI TO JCT W CL2 TH2 (Lat: 44.504722,  Lng: -71.987778),  Route carried "on" structure: Other road C3069,  Year Built: 1978,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 150 (year 1998),  Truck Traffic: 2%,  Average Future Daily Traffic: 225 (year 2018),  Design Load: HS 20,  Features Intersected: SHELDON BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 64.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 33.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.62m (5.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2006,  Bridge Improvement Cost: $400,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $550,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 100307005603071,  Location: 0.5 MI JCT TH 1 + TH 24 (Lat: 44.537500,  Lng: -72.066389),  Route carried "on" structure: Other road C2001,  Year Built: 1940,  Year Reconstructed: 1989,  Status: Open,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 860 (year 1998),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,290 (year 2018),  Design Load: H 15,  Features Intersected: SO. WHEELOCK BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.7m (44.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 6.5m (21.3ft),  Out-to-Out Width: 6.9m (22.6ft)

Condition: Deck: Very good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 17.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 6.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.35m (7.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2006,  Bridge Improvement Cost: $518,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $668,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 200091009403072,  Location: 0.1 MI N EXIT 23 I 91 (Lat: 44.519444,  Lng: -72.007222),  Route carried "on" structure: Interstate 91,  Year Built: 1972,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 4,600 (year 1998),  Truck Traffic: 13%,  Average Future Daily Traffic: 6,900 (year 2018),  Design Load: HS 20,  Features Intersected: S. WHEELOCK BR PASM R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 221.575,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.2m (76.1ft),  Skew: 11 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.6m (15.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 54.0 metric tons,  Inventory Rating: 32.4 metric tons,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.94m (3.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2006,  Bridge Improvement Cost: $436,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $461,000 ( Estimate for 2007)
Find on map >>

Structure Number: 200091092N03072,  Location: 0.5 MI S EXIT 23 (Lat: 44.509444,  Lng: -72.011667),  Route carried "on" structure: Interstate 91,  Year Built: 1974,  Status: Open,  Structure Length: 6.74m (22.11ft),  Average Daily Traffic: 4,350 (year 1998),  Truck Traffic: 13%,  Average Future Daily Traffic: 6,525 (year 2018),  Design Load: Railroad,  Features Intersected: I 91 OVER US 5
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 219.709,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 14 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 39.9m (130.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 13.3m (43.6ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 80.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 44.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.41m (24.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2006,  Bridge Improvement Cost: $2,781,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $2,931,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 200091092S03072,  Location: 0.5 MI S EXIT 23 (Lat: 44.509722,  Lng: -72.011667),  Route carried "on" structure: Interstate 91,  Year Built: 1974,  Status: Open,  Structure Length: 8.78m (28.81ft),  Average Daily Traffic: 4,350 (year 1998),  Truck Traffic: 13%,  Average Future Daily Traffic: 6,525 (year 2018),  Design Load: HS 20,  Features Intersected: I 91 OVER US 5
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 219.709,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 13 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 54.9m (180.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.1m (39.7ft),  Out-to-Out Width: 13.3m (43.6ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 79.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 39.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.66m (31.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2006,  Bridge Improvement Cost: $3,624,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $3,774,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 200091093N03072,  Location: I 91 EXIT 23 (Lat: 44.516944,  Lng: -72.006667),  Route carried "on" structure: Interstate 91,  Year Built: 1974,  Status: Open,  Structure Length: 3.38m (11.09ft),  Average Daily Traffic: 2,300 (year 1998),  Truck Traffic: 13%,  Average Future Daily Traffic: 3,450 (year 2018),  Design Load: HS 20,  Features Intersected: I 91 OVER US 5
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 220.642,  Lanes on structure: 2,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 15 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 32.0m (105.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 60.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.05m (13.29ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2006,  Bridge Improvement Cost: $1,520,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $1,670,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 200091093S03072,  Location: I 91 EXIT 23 (Lat: 44.516667,  Lng: -72.006944),  Route carried "on" structure: Interstate 91,  Year Built: 1974,  Status: Open,  Structure Length: 3.47m (11.38ft),  Average Daily Traffic: 2,300 (year 1998),  Truck Traffic: 13%,  Average Future Daily Traffic: 3,450 (year 2018),  Design Load: HS 20,  Features Intersected: I 91 OVER US 5
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 220.642,  Lanes on structure: 3,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 14 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 32.9m (107.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 13.7m (44.9ft),  Out-to-Out Width: 15.1m (49.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 61.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.18m (13.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2006,  Bridge Improvement Cost: $1,777,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $1,927,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 200091095N03072,  Location: 1.7 MI N EXIT 23 I91 (Lat: 44.538333,  Lng: -72.018889),  Route carried "on" structure: Interstate 91,  Year Built: 1972,  Status: Open,  Structure Length: 4.57m (14.99ft),  Average Daily Traffic: 2,300 (year 1998),  Truck Traffic: 16%,  Average Future Daily Traffic: 3,450 (year 2018),  Design Load: HS 20,  Features Intersected: I 91 OVER TH NO 9
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 223.233,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 12 degrees,  Material/Design: Steel continuous,  Design/Construction: Frame,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.3m (69.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 59.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 38.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.49m (18.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2006,  Bridge Improvement Cost: $2,050,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $2,200,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 200091095S03072,  Location: 1.7 MI N EXIT 23 I 91 (Lat: 44.538333,  Lng: -72.019722),  Route carried "on" structure: Interstate 91,  Year Built: 1972,  Status: Open,  Structure Length: 4.57m (14.99ft),  Average Daily Traffic: 2,300 (year 1998),  Truck Traffic: 13%,  Average Future Daily Traffic: 3,450 (year 2018),  Design Load: HS 20,  Features Intersected: I 91 OVER TH NO 9
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 223.233,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 12 degrees,  Material/Design: Steel continuous,  Design/Construction: Frame,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.3m (69.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 11.8m (38.7ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 59.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 38.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.49m (18.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2006,  Bridge Improvement Cost: $2,055,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $2,205,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 200091096N03072,  Location: 0.2 MI S EXIT 24 I 91 (Lat: 44.553056,  Lng: -72.028611),  Route carried "on" structure: Interstate 91,  Year Built: 1972,  Status: Open,  Structure Length: 7.50m (24.61ft),  Average Daily Traffic: 2,300 (year 1998),  Truck Traffic: 13%,  Average Future Daily Traffic: 3,450 (year 2018),  Design Load: HS 20,  Features Intersected: I 91 OVER VT 122 MLR RUN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 225.083,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 12 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 24.7m (81.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 68.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 42.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.26m (27.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2006,  Bridge Improvement Cost: $3,089,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $3,239,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 200091096S03072,  Location: 0.2 MI S EXIT 24 I91 (Lat: 44.553333,  Lng: -72.028889),  Route carried "on" structure: Interstate 91,  Year Built: 1972,  Status: Open,  Structure Length: 7.50m (24.61ft),  Average Daily Traffic: 2,300 (year 1998),  Truck Traffic: 13%,  Average Future Daily Traffic: 3,450 (year 2018),  Design Load: HS 20,  Features Intersected: I 91 OVER VT 122 MLR RUN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 225.083,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 12 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 24.7m (81.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 68.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 42.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.26m (27.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2006,  Bridge Improvement Cost: $3,082,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $3,232,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 200091097N03072,  Location: 1.3 MI N EXIT 24 I91 (Lat: 44.572778,  Lng: -72.041667),  Route carried "on" structure: Interstate 91,  Year Built: 1972,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 2,200 (year 1998),  Truck Traffic: 13%,  Average Future Daily Traffic: 3,300 (year 2018),  Design Load: HS 20,  Features Intersected: I 91 OVER TH NO 9
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 227.690,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 11 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 77.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of replacement,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.55m (5.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2006,  Bridge Improvement Cost: $584,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $734,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 200091097S03072,  Location: 1.3 MI N EXIT 24 I91 (Lat: 44.571944,  Lng: -72.042500),  Route carried "on" structure: Interstate 91,  Year Built: 1972,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 2,200 (year 1998),  Truck Traffic: 13%,  Average Future Daily Traffic: 3,300 (year 2018),  Design Load: HS 20,  Features Intersected: I 91 OVER TH NO 9
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 227.690,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 77.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of replacement,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.55m (5.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2006,  Bridge Improvement Cost: $583,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $733,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 200113014103072,  Location: 1.2 MI S JCT. VT.122 (Lat: 44.518333,  Lng: -72.003611),  Route carried "on" structure: US 5,  Year Built: 1972,  Status: Open,  Structure Length: 5.24m (17.19ft),  Average Daily Traffic: 13,100 (year 1998),  Truck Traffic: 6%,  Average Future Daily Traffic: 19,650 (year 2018),  Design Load: HS 20,  Features Intersected: PASSUMPSIC RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 25.9m (85.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 18.5m (60.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 54.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.28m (20.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2007,  Bridge Improvement Cost: $3,300,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $3,450,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 200113014403072,  Location: 0.1 MI S JCT. VT.114 (Lat: 44.543889,  Lng: -72.000278),  Route carried "on" structure: US 5,  Year Built: 1930,  Year Reconstructed: 1969,  Status: Open,  Structure Length: 4.48m (14.70ft),  Average Daily Traffic: 6,600 (year 1998),  Truck Traffic: 6%,  Average Future Daily Traffic: 9,900 (year 2018),  Design Load: HS 20,  Features Intersected: PASSUMPSIC RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.7m (44.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.3m (46.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 15.4m (50.5ft),  Out-to-Out Width: 16.0m (52.5ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 73.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 5.36m (17.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2007,  Bridge Improvement Cost: $2,436,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $2,586,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 200113014703072,  Location: 2.8 MI N JCT. VT.114 (Lat: 44.580833,  Lng: -71.984444),  Route carried "on" structure: US 5,  Year Built: 1956,  Status: Open,  Structure Length: 1.65m (5.41ft),  Average Daily Traffic: 3,100 (year 1998),  Truck Traffic: 6%,  Average Future Daily Traffic: 4,650 (year 2018),  Design Load: H 20,  Features Intersected: CALENDAR BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.8m (51.8ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 37.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 22.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.32m (7.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2007,  Bridge Improvement Cost: $684,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $834,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 200260000403072,  Location: 1.0 M1 W JCT US.5 (Lat: 44.541944,  Lng: -72.010000),  Route carried "on" structure: State highway 122,  Year Built: 1900,  Year Reconstructed: 1995,  Status: Posted for load-capacity,  Structure Length: 1.86m (6.10ft),  Average Daily Traffic: 2,400 (year 1998),  Truck Traffic: 6%,  Average Future Daily Traffic: 3,600 (year 2018),  Design Load: HS 20,  Features Intersected: MILLERS RUN
Minimum Vertical Clearance: 3.58m (11.75ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.5m (50.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 4.4m (14.4ft),  Out-to-Out Width: 4.8m (15.7ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 51.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 35.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 2.59m (8.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $350,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $500,000 ( Estimate for 2007),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber,  Deck Protection: Internally Sealed
Find on map >>

Structure Number: 200263001603072,  Location: 1.6 MI E JCT. U.S.5 (Lat: 44.503333,  Lng: -71.981667),  Route carried "on" structure: County highway 6,  Year Built: 1928,  Year Reconstructed: 1991,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 1,890 (year 1995),  Truck Traffic: 6%,  Average Future Daily Traffic: 2,835 (year 2015),  Features Intersected: SHELDON BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.5m (41.0ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 6.9m (22.6ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 30.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 16.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.10m (6.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2006,  Bridge Improvement Cost: $409,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $559,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 200269000103072,  Location: 0.4 MI N JCT. U.S.5 (Lat: 44.549167,  Lng: -71.995556),  Route carried "on" structure: State highway 114,  Year Built: 1987,  Status: Open,  Structure Length: 5.43m (17.81ft),  Average Daily Traffic: 4,100 (year 1998),  Truck Traffic: 6%,  Average Future Daily Traffic: 6,150 (year 2018),  Design Load: HS 25,  Features Intersected: PASSUMPSIC RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 26.2m (86.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 10.2m (33.5ft),  Out-to-Out Width: 11.2m (36.7ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 66.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 42.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.52m (21.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2007,  Bridge Improvement Cost: $2,062,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $2,212,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 200269000203072,  Location: 0.6 MI N JCT. U.S.5 (Lat: 44.549444,  Lng: -71.991389),  Route carried "on" structure: State highway 114,  Year Built: 2007,  Status: Open,  Structure Length: 3.05m (10.01ft),  Average Daily Traffic: 4,200 (year 1997),  Truck Traffic: 4%,  Average Future Daily Traffic: 6,300 (year 2017),  Design Load: HS 25,  Features Intersected: PASSUMPSIC RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 29.6m (97.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 10.2m (33.5ft),  Out-to-Out Width: 11.1m (36.4ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 75.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.66m (12.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $1,149,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $1,299,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 200269000803072,  Location: 2.1 MI N JCT. U.S.5 (Lat: 44.559444,  Lng: -71.963889),  Route carried "on" structure: State highway 114,  Year Built: 2006,  Status: Open,  Structure Length: 2.90m (9.51ft),  Average Daily Traffic: 4,300 (year 2005),  Truck Traffic: 7%,  Average Future Daily Traffic: 6,450 (year 2025),  Design Load: HS 25,  Features Intersected: E. BR. PASSUMPSIC RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 28.3m (92.8ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 84.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.47m (11.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $1,031,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $1,181,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 200091092N03072,  Location: 2.2 MI S JCT VT 122 (Lat: 44.509444,  Lng: -72.011667),  Route carried "under" structure: US 5,  Year Built: 1974,  Structure Length: 6.74m (22.11ft),  Average Daily Traffic: 5,700 (year 1998),  Truck Traffic: 6%,  Features Intersected: I 91 OVER US RTE 5,  Facility Carried by Structure: I 00091 ML
Minimum Vertical Clearance: 8.71m (28.58ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.9m (130.9ft)

Find on map >>

Structure Number: 200091092S03072,  Location: 2.2 MI S JCT VT 122 (Lat: 44.509722,  Lng: -72.011667),  Route carried "under" structure: US 5,  Year Built: 1974,  Structure Length: 6.74m (22.11ft),  Average Daily Traffic: 5,700 (year 1998),  Truck Traffic: 6%,  Features Intersected: I 91 OVER US RTE 5,  Facility Carried by Structure: I 00091 ML
Minimum Vertical Clearance: 8.31m (27.26ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.9m (130.9ft)

Find on map >>

Structure Number: 200091093N03072,  Location: 1.6 MI S JCT VT 122 (Lat: 44.516944,  Lng: -72.006667),  Route carried "under" structure: US 5,  Year Built: 1974,  Structure Length: 3.38m (11.09ft),  Average Daily Traffic: 8,250 (year 1998),  Truck Traffic: 6%,  Features Intersected: I 91 OVER US RTE 5,  Facility Carried by Structure: I 00091 ML
Minimum Vertical Clearance: 4.55m (14.93ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.0m (105.0ft)

Find on map >>

Structure Number: 200091093S03072,  Location: 1.6 MI S JCT VT 122 (Lat: 44.516667,  Lng: -72.006944),  Route carried "under" structure: US 5,  Year Built: 1974,  Structure Length: 3.38m (11.09ft),  Average Daily Traffic: 8,250 (year 1998),  Truck Traffic: 6%,  Features Intersected: I 91 OVER US RTE 5,  Facility Carried by Structure: I 00091 ML
Minimum Vertical Clearance: 4.39m (14.40ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.0m (105.0ft)

Find on map >>

Structure Number: 200091096N03072,  Location: 1.8 MI W JCT US 5 (Lat: 44.553056,  Lng: -72.028611),  Route carried "under" structure: State highway 122,  Year Built: 1972,  Structure Length: 7.50m (24.61ft),  Average Daily Traffic: 2,000 (year 1998),  Truck Traffic: 6%,  Features Intersected: I 91 OVER VT122 & MLR R,  Facility Carried by Structure: I 00091 ML
Minimum Vertical Clearance: 4.62m (15.16ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.7m (81.0ft)

Find on map >>

Structure Number: 200091096S03072,  Location: 1.8 MI W JCT US 5 (Lat: 44.553333,  Lng: -72.028889),  Route carried "under" structure: State highway 122,  Year Built: 1972,  Structure Length: 7.50m (24.61ft),  Average Daily Traffic: 2,000 (year 1998),  Truck Traffic: 6%,  Features Intersected: I 91 OVER VT122 & MLR R,  Facility Carried by Structure: I 00091 ML
Minimum Vertical Clearance: 4.65m (15.26ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.7m (81.0ft)

Discuss this city on our hugely popular Vermont forum

Back to: Lyndon, VT, Vermont, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2009 Advameg, Inc.