Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Malta, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 26Number of bridges
  • 289ft / 88.3mTotal length
  • $58,763,000Total costs
  • 383,575Total average daily traffic
  • 25,508Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Malta
  • No street view available for this location

New bridges in Malta, NY - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 11950-1959
  • 41960-1969
  • 51990-1999
  • 82000-2009
  • 72010-2019
Reconstructed bridges in Malta, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11980-1989
  • 21990-1999
  • 12000-2009
Average Bridge Daily Traffic in Malta, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 7.1%Excellent
  • 14.3%Very good
  • 35.7%Good
  • 42.9%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 14.3%Excellent
  • 50.0%Very good
  • 21.4%Good
  • 7.1%Satisfactory
  • 7.1%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 14.3%Excellent
  • 57.1%Very good
  • 7.1%Good
  • 21.4%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 41.7%Very good
  • 50.0%Good
  • 8.3%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 60.0%Excellent
  • 20.0%Very good
  • 20.0%Good
Find on map >>   Show street view

Structure Number: 100562,  Location: SH 9 IN ROUND LAKE (Lat: 42.940147,  Lng: -73.789442),  Route carried "on" structure: US 9,  Year Built: 1960,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 5,702 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 5,728 (year 2040),  Features Intersected: BALLSTON CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.819,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.9m (71.9ft),  Skew: 23 degrees,  Material/Design: Concrete continuous,  Design/Construction: Frame,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.6m (15.1ft),  Curb-To-Curb Width: 21.9m (71.9ft),  Out-to-Out Width: 32.3m (106.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 58.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.97m (3.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,357,000,  Roadway Improvement Cost: $795,000,  Total Project Cost: $2,152,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1005639,  Location: JCT.RTE 9 & 87I (Lat: 43.021489,  Lng: -73.791411),  Route carried "on" structure: US 9,  Year Built: 1962,  Year Reconstructed: 2003,  Status: Open,  Structure Length: 10.03m (32.91ft),  Average Daily Traffic: 15,152 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 15,223 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: 87I 87I15091165 NB, RTE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 24.022,  Lanes on structure: 6,  Lanes under structure: 12,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 29.3m (96.1ft),  Skew: 23 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 27.4m (89.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 29.3m (96.1ft),  Out-to-Out Width: 30.9m (101.4ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.02m (32.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $6,696,000,  Roadway Improvement Cost: $3,921,000,  Total Project Cost: $10,617,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1005641,  Location: .2 MILE N EXIT 13 OF I87 (Lat: 43.031297,  Lng: -73.790547),  Route carried "on" structure: US 9,  Year Built: 2016,  Status: Open,  Structure Length: 4.05m (13.29ft),  Average Daily Traffic: 8,506 (year 2017),  Truck Traffic: 10%,  Average Future Daily Traffic: 8,545 (year 2040),  Design Load: HL 93,  Features Intersected: KAYADEROSSERAS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.245,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 39.6m (129.9ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Good,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Good,  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.05m (13.29ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $1,699,000,  Roadway Improvement Cost: $995,000,  Total Project Cost: $2,694,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1005642,  Location: .2 MI N OF EXIT 13 OF I87 (Lat: 43.031578,  Lng: -73.789814),  Route carried "on" structure: US 9,  Year Built: 1928,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 2.90m (9.51ft),  Average Daily Traffic: 8,506 (year 2017),  Truck Traffic: 10%,  Average Future Daily Traffic: 8,545 (year 2040),  Design Load: HS 20,  Features Intersected: KAYADEROSSERAS CK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.245,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.4m (89.9ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 75.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.89m (9.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $1,229,000,  Roadway Improvement Cost: $720,000,  Total Project Cost: $1,949,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 102919,  Location: JCT RTE 67 & I87 (Lat: 42.970383,  Lng: -73.802136),  Route carried "on" structure: State highway 67,  Year Built: 2006,  Status: Open,  Structure Length: 8.35m (27.40ft),  Average Daily Traffic: 17,235 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 17,316 (year 2040),  Design Load: HL 93,  Features Intersected: 87I 87I15091127 NB, RTE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 28.109,  Lanes on structure: 4,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 22.3m (73.2ft),  Skew: 20 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 41.1m (134.8ft),  Curb or Sidewalk Widths: Left: 3.0m (9.8ft),  Right: 3.0m (9.8ft),  Curb-To-Curb Width: 15.6m (51.2ft),  Out-to-Out Width: 22.9m (75.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 83.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.35m (27.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $4,209,000,  Roadway Improvement Cost: $2,465,000,  Total Project Cost: $6,674,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1033281,  Location: 1.3 MI S JCT I87 & SH 67 (Lat: 42.951183,  Lng: -73.804083),  Route carried "on" structure: Interstate 87,  Year Built: 1996,  Status: Open,  Structure Length: 3.78m (12.40ft),  Average Daily Traffic: 38,860 (year 2014),  Truck Traffic: 10%,  Design Load: HS 25 or greater,  Features Intersected: ZIM SMITH TRAIL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.327,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.9m (62.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 36.5m (119.8ft),  Curb-To-Curb Width: 19.0m (62.3ft),  Out-to-Out Width: 20.0m (65.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 75.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.77m (12.37ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $1,895,000,  Roadway Improvement Cost: $1,110,000,  Total Project Cost: $3,005,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1033282,  Location: 1.3 MI S JCT I87 & SH 67 (Lat: 42.951092,  Lng: -73.803850),  Route carried "on" structure: Interstate 87,  Year Built: 1996,  Status: Open,  Structure Length: 3.78m (12.40ft),  Average Daily Traffic: 27,361 (year 2015),  Truck Traffic: 10%,  Average Future Daily Traffic: 43,359 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: ZIM SMITH TRAIL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.327,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.9m (62.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 36.5m (119.8ft),  Curb-To-Curb Width: 19.0m (62.3ft),  Out-to-Out Width: 20.0m (65.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 75.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.77m (12.37ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $1,943,000,  Roadway Improvement Cost: $1,138,000,  Total Project Cost: $3,081,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 103329,  Location: 1.1 MI S JCT I87 & RT 67 (Lat: 42.952961,  Lng: -73.803167),  Route carried "on" structure: Interstate 87,  Year Built: 1959,  Year Reconstructed: 2000,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 54,722 (year 2015),  Truck Traffic: 10%,  Average Future Daily Traffic: 86,717 (year 2040),  Design Load: H 20,  Features Intersected: BALLSTON CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.552,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 31.7m (104.0ft),  Skew: 24 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.6m (11.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 72.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.21m (3.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $681,000,  Roadway Improvement Cost: $399,000,  Total Project Cost: $1,080,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 10333,  Location: 1.7 MI N JCT I87 & SH 67 (Lat: 42.995567,  Lng: -73.803281),  Route carried "on" structure: Other road ,  Year Built: 2018,  Status: Open,  Structure Length: 9.20m (30.18ft),  Average Daily Traffic: 2,611 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 3,655 (year 2040),  Design Load: HL 93,  Features Intersected: 87I 87I15091145, RTE I87,  Facility Carried by Structure: EAST HIGH STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.207,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 45.7m (149.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Operating Rating: 72.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.20m (30.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $2,576,000,  Roadway Improvement Cost: $1,509,000,  Total Project Cost: $4,085,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 103331,  Location: JCT I87 & MALTA AVE LT (Lat: 43.013717,  Lng: -73.799481),  Route carried "on" structure: County highway ,  Year Built: 2010,  Status: Open,  Structure Length: 3.14m (10.30ft),  Average Daily Traffic: 7,515 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 9,298 (year 2040),  Design Load: HL 93,  Features Intersected: RTE I87,  Facility Carried by Structure: MALTA AVE C.R.63
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.749,  Lanes on structure: 2,  Lanes under structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 29.9m (98.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 12.1m (39.7ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Inventory Rating: 70.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: High priority of corrective action,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.13m (10.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $1,263,000,  Roadway Improvement Cost: $740,000,  Total Project Cost: $2,003,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1033321,  Location: I87 & KAYADEROSSERAS CRK (Lat: 43.042175,  Lng: -73.775858),  Route carried "on" structure: Interstate 87,  Year Built: 1998,  Status: Open,  Structure Length: 4.69m (15.39ft),  Average Daily Traffic: 31,221 (year 2006),  Truck Traffic: 9%,  Average Future Daily Traffic: 43,709 (year 2026),  Design Load: HS 25 or greater,  Features Intersected: KAYADEROSSERAS CK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 29.042,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 46.3m (151.9ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 16.5m (54.1ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 79.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.69m (15.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $1,749,000,  Roadway Improvement Cost: $1,024,000,  Total Project Cost: $2,773,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1033322,  Location: I87 & KAYADEROSSERAS CRK (Lat: 43.041994,  Lng: -73.774856),  Route carried "on" structure: Interstate 87,  Year Built: 1998,  Status: Open,  Structure Length: 4.69m (15.39ft),  Average Daily Traffic: 23,725 (year 2016),  Truck Traffic: 18%,  Average Future Daily Traffic: 37,597 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: KAYADEROSSERAS CK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 29.059,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 46.3m (151.9ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 16.5m (54.1ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 79.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.69m (15.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $1,749,000,  Roadway Improvement Cost: $1,024,000,  Total Project Cost: $2,773,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 107893,  Location: 0.3 mi. W of Rte.9/Rte.67 (Lat: 42.948986,  Lng: -73.797869),  Route carried "on" structure: Bypass State highway 915J,  Year Built: 2008,  Status: Open,  Structure Length: 19.60m (64.30ft),  Average Daily Traffic: 4,834 (year 2014),  Truck Traffic: 7%,  Average Future Daily Traffic: 6,768 (year 2034),  Design Load: HS 25 or greater,  Features Intersected: Vacant land, RTE 915, MA
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.140,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 53.9m (176.8ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 50.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 19.59m (64.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $5,356,000,  Roadway Improvement Cost: $3,136,000,  Total Project Cost: $8,492,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 109583,  Location: IN MALTA RIDGE (Lat: 43.013500,  Lng: -73.798775),  Route carried "on" structure: County highway ,  Year Built: 2010,  Status: Open,  Structure Length: 3.14m (10.30ft),  Average Daily Traffic: 7,515 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 9,298 (year 2040),  Design Load: HL 93,  Features Intersected: RTE I87,  Facility Carried by Structure: MALTA AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.797,  Lanes on structure: 2,  Lanes under structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 29.9m (98.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 12.1m (39.7ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Inventory Rating: 70.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: High priority of corrective action,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.13m (10.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $1,292,000,  Roadway Improvement Cost: $756,000,  Total Project Cost: $2,048,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 227056,  Location: .7m E Route 9 (Lat: 42.959700,  Lng: -73.778019),  Route carried "on" structure: ServiceCounty highway ,  Year Built: 2009,  Status: Open,  Structure Length: 1.49m (4.89ft),  Average Daily Traffic: 2,076 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 2,906 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: UNKNOWN CREEK,  Facility Carried by Structure: CR 77, STONEBREAK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.191,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.6m (47.9ft),  Curb or Sidewalk Widths: Left: 3.0m (9.8ft),  Right: 0.0m

Condition: Channel: Very good,  Culverts: Excellent,  Operating Rating: 94.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 56.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.49m (4.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $330,000,  Roadway Improvement Cost: $193,000,  Total Project Cost: $524,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 227057,  Location: .5m N Route 67 (Lat: 42.954303,  Lng: -73.776892),  Route carried "on" structure: ServiceCounty highway ,  Year Built: 2009,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 3,644 (year 2014),  Truck Traffic: 5%,  Average Future Daily Traffic: 5,102 (year 2034),  Design Load: HS 25 or greater,  Features Intersected: UNKNOWN CREEK,  Facility Carried by Structure: CR 78, LUTHER FORE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.158,  Lanes on structure: 5,  Owner: County Highway Agency,  Approaching Roadway Width: 22.9m (75.1ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.0m (36.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Excellent,  Operating Rating: 81.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.12m (3.67ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $968,000,  Roadway Improvement Cost: $567,000,  Total Project Cost: $1,535,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 227058,  Location: .5m N Route 67 (Lat: 42.954764,  Lng: -73.775425),  Route carried "on" structure: ServiceCounty highway ,  Year Built: 2009,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 3,644 (year 2014),  Truck Traffic: 5%,  Average Future Daily Traffic: 5,102 (year 2034),  Design Load: HS 25 or greater,  Features Intersected: UNKNOWN CREEK,  Facility Carried by Structure: CR 78, LUTHER FORE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.239,  Lanes on structure: 5,  Owner: County Highway Agency,  Approaching Roadway Width: 22.6m (74.1ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.0m (36.1ft),  Curb or Sidewalk Widths: Left: 3.0m (9.8ft),  Right: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Excellent,  Operating Rating: 81.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.12m (3.67ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $873,000,  Roadway Improvement Cost: $511,000,  Total Project Cost: $1,384,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 330437,  Location: 2 M W OF I87-EXIT 12 (Lat: 42.969825,  Lng: -73.830739),  Route carried "on" structure: County highway ,  Year Built: 2001,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 4,138 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 6,019 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: BALLSTON CREEK,  Facility Carried by Structure: EASTLINE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.229,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Aluminum, Iron,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 74.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.82m (2.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $229,000,  Roadway Improvement Cost: $134,000,  Total Project Cost: $363,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 330445,  Location: 1.7 MI NE JCT I87 & US 9 (Lat: 43.043653,  Lng: -73.771058),  Route carried "on" structure: County highway ,  Year Built: 1962,  Year Reconstructed: 1998,  Status: Open,  Structure Length: 4.15m (13.62ft),  Average Daily Traffic: 459 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 567 (year 2040),  Design Load: H 20,  Features Intersected: KAYADEROSSERAS CK,  Facility Carried by Structure: NELSON AVE EXT
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.701,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 40.8m (133.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 92.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 31.1 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 4.14m (13.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $965,000,  Roadway Improvement Cost: $565,000,  Total Project Cost: $1,531,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 1005639,  Location: JCT.RTE 9 & 87I (Lat: 43.021489,  Lng: -73.791411),  Route carried "under" structure: Interstate 87,  Year Built: 1962,  Structure Length: 0. m,  Average Daily Traffic: 21,963 (year 2000),  Features Intersected: 87I 87I15091165 NB, RTE,  Facility Carried by Structure: RTE 9
Minimum Vertical Clearance: 5.69m (18.67ft),  Kilometerpoint: 26.629,  Lanes on structure: 6,  Lanes under structure: 8,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.4m (89.9ft)

Find on map >>   Show street view

Structure Number: 102919,  Location: JCT RTE 67 & I87 (Lat: 42.970383,  Lng: -73.802136),  Route carried "under" structure: Interstate 87,  Year Built: 2006,  Structure Length: 0. m,  Average Daily Traffic: 21,963 (year 2000),  Features Intersected: 87I 87I15091127 NB, RTE,  Facility Carried by Structure: RTE 67
Minimum Vertical Clearance: 5.56m (18.24ft),  Kilometerpoint: 20.820,  Lanes on structure: 4,  Lanes under structure: 3,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 41.1m (134.8ft)

Find on map >>   Show street view

Structure Number: 1033271,  Location: JCT I87 & RND LAKE ROAD (Lat: 42.936917,  Lng: -73.804656),  Route carried "under" structure: County highway 823,  Year Built: 1996,  Structure Length: 0. m,  Average Daily Traffic: 1,500 (year 2021),  Features Intersected: RTE 823,  Facility Carried by Structure: RTE I87
Minimum Vertical Clearance: 4.85m (15.91ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 22.2m (72.8ft)

Find on map >>   Show street view

Structure Number: 10333,  Location: 1.7 MI N JCT I87 & SH 67 (Lat: 42.995567,  Lng: -73.803281),  Route carried "under" structure: Interstate 87,  Year Built: 2018,  Structure Length: 0. m,  Average Daily Traffic: 21,963 (year 2000),  Features Intersected: 87I 87I15091145, RTE I87,  Facility Carried by Structure: EAST HIGH STREET
Minimum Vertical Clearance: 5.89m (19.32ft),  Kilometerpoint: 23.524,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 45.7m (149.9ft)

Find on map >>   Show street view

Structure Number: 103331,  Location: JCT I87 & MALTA AVE LT (Lat: 43.013717,  Lng: -73.799481),  Route carried "under" structure: Interstate 87,  Year Built: 2010,  Structure Length: 0. m,  Average Daily Traffic: 21,963 (year 2000),  Features Intersected: RTE I87,  Facility Carried by Structure: MALTA AVE C.R.63
Minimum Vertical Clearance: 5.33m (17.49ft),  Kilometerpoint: 25.503,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.9m (98.1ft)

Find on map >>   Show street view

Structure Number: 107894,  Location: .7 Mi. N I-87 Exit 11 (Lat: 42.949164,  Lng: -73.800742),  Route carried "under" structure: Bypass State highway 915,  Year Built: 2008,  Structure Length: 0. m,  Average Daily Traffic: 4,834 (year 2014),  Truck Traffic: 7%,  Features Intersected: RTE 915,  Facility Carried by Structure: ZIM SMITH TRAIL
Minimum Vertical Clearance: 5.28m (17.32ft),  Kilometerpoint: 1.352,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Truss - Thru,  Length of Maximum Span: 31.1m (102.0ft)

Find on map >>   Show street view

Structure Number: 109583,  Location: IN MALTA RIDGE (Lat: 43.013500,  Lng: -73.798775),  Route carried "under" structure: Interstate 87,  Year Built: 2010,  Structure Length: 0. m,  Average Daily Traffic: 21,963 (year 2000),  Features Intersected: RTE I87,  Facility Carried by Structure: MALTA AVENUE
Minimum Vertical Clearance: 5.33m (17.49ft),  Kilometerpoint: 25.551,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.9m (98.1ft)

Discuss Malta, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.